X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-20876

Well Details

Well ID: 37-117-20876
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Bloss Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 148210
Farm/Lease Name: DCNR 595 PAD D 53H S 50370
License Status: Active
Spud Date: 07/11/2010
Permit Date: 9/1/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.693398
Longitude: -77.121090

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 SENECA RESOURCES CO LLC 43,859.00 12 0.00 0 0.00 0
2011 SENECA RESOURCES CO LLC 503,421.00 347 0.00 0 0.00 0
2012 SENECA RESOURCES CO LLC 338,132.00 343 0.00 0 0.00 0
2013 SENECA RESOURCES CO LLC 262,639.00 351 0.00 0 0.00 0
2014 SENECA RESOURCES CO LLC 187,118.07 362 0.00 0 0.00 0
2015 SENECA RESOURCES CO LLC 126,172.64 261 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 105,681.47 143 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 117,372.21 274 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 107,961.29 342 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 32,504.12 89 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
16AUGU Produced Fluid (in Barrels) RWC 802 15.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
16DECU Produced Fluid (in Barrels) RWC 802 52.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
16JUNU Produced Fluid (in Barrels) RWC 802 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
16NOVU Produced Fluid (in Barrels) RWC 802 28.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
16NOVU Produced Fluid (in Barrels) RWC 802 15.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010-2 Drill Cuttings (in Tons) 714.23 Tons LANDFILL 100361
2010-2 Fracing Fluid Waste (in Barrels) 6,458.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010-2 Produced Fluid (in Barrels) 4.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-1 Drill Cuttings (in Tons) 59.13 Tons LANDFILL 100361
2011-1 Produced Fluid (in Barrels) 2,545.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-2 Produced Fluid (in Barrels) 546.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-1 Produced Fluid (in Barrels) 661.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-2 Produced Fluid (in Barrels) 26.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012-2 Produced Fluid (in Barrels) 938.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Produced Fluid (in Barrels) 10.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC012
2013-1 Produced Fluid (in Barrels) 732.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-2 Produced Fluid (in Barrels) 134.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC012
2013-2 Produced Fluid (in Barrels) 262.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Produced Fluid (in Barrels) 345.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-2 Produced Fluid (in Barrels) 345.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-1 Produced Fluid (in Barrels) 236.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Produced Fluid (in Barrels) 52.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015-2 Produced Fluid (in Barrels) 27.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-06 Produced Fluid (in Barrels) RWC 802 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-08 Produced Fluid (in Barrels) RWC 802 15.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-11 Produced Fluid (in Barrels) RWC 802 28.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-11 Produced Fluid (in Barrels) RWC 802 15.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-12 Produced Fluid (in Barrels) RWC 802 52.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-01 Produced Fluid (in Barrels) RWC 802 42.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-02 Produced Fluid (in Barrels) RWC 802 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-03 Produced Fluid (in Barrels) RWC 802 21.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-04 Produced Fluid (in Barrels) RWC 802 17.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-04 Produced Fluid (in Barrels) RWC 802 50.00 Bbl REUSE (AT WELL PAD)
2017-05 Produced Fluid (in Barrels) RWC 802 55.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-06 Produced Fluid (in Barrels) RWC 802 18.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-06 Produced Fluid (in Barrels) RWC 802 32.75 Bbl REUSE (AT WELL PAD)
2017-07 Produced Fluid (in Barrels) RWC 802 16.50 Bbl REUSE (AT WELL PAD)
2017-11 Produced Fluid (in Barrels) RWC 802 49.29 Bbl REUSE (AT WELL PAD)
2017-12 Produced Fluid (in Barrels) RWC 802 37.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-01 Produced Fluid (in Barrels) RWC 802 18.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-01 Produced Fluid (in Barrels) RWC 802 16.43 Bbl REUSE (AT WELL PAD)
2018-02 Produced Fluid (in Barrels) RWC 802 37.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-03 Produced Fluid (in Barrels) RWC 802 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-03 Produced Fluid (in Barrels) RWC 802 18.57 Bbl REUSE (AT WELL PAD)
2018-04 Produced Fluid (in Barrels) RWC 802 37.86 Bbl REUSE (AT WELL PAD)
2018-05 Produced Fluid (in Barrels) RWC 802 18.57 Bbl REUSE (AT WELL PAD)
2018-06 Produced Fluid (in Barrels) RWC 802 67.14 Bbl REUSE (AT WELL PAD)
2018-07 Produced Fluid (in Barrels) RWC 802 21.43 Bbl REUSE (AT WELL PAD)
2018-08 Produced Fluid (in Barrels) RWC 802 21.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-08 Produced Fluid (in Barrels) RWC 802 21.43 Bbl REUSE (AT WELL PAD)
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 57.86 Bbl REUSE (AT WELL PAD)
2018-09 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Barrels) RWC 802 74.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-11 Produced Fluid (in Barrels) RWC 802 18.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-12 Produced Fluid (in Barrels) RWC 802 8.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-12 Produced Fluid (in Barrels) RWC 802 18.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-12 Produced Fluid (in Barrels) RWC 802 37.14 Bbl REUSE (AT WELL PAD)
2019-01 Produced Fluid (in Barrels) RWC 802 35.00 Bbl REUSE (AT WELL PAD)
2019-02 Produced Fluid (in Barrels) RWC 802 18.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-03 Produced Fluid (in Barrels) RWC 802 17.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1923633 Primary Facility 10/18/2010 Drilling/Alteration No Violations Noted
2164865 Primary Facility 04/30/2013 Routine/Complete Inspection No Violations Noted
2370729 Primary Facility 05/15/2015 Routine/Partial Inspection No Violations Noted 7 Marcellus Shale natural gas wells in production.
2820434 Primary Facility 2018-12-28 Routine/Partial Inspection No Violations Noted I took electrical conductivity readings from pooled water on site with an Oakton PCSTestr 35. A puddle near the center of the Marcellus well pad returned 0.08 mS/cm.

Air temp: 45F JLP

For data sources see[6]

References