If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-21832 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.563814,"lon":-77.153109,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Liberty Township | |
Operator Name: SWN PROD CO LLC | |
Well Pad ID: 151370 | |
Farm/Lease Name: LEPLEY 4H | |
License Status: Active | |
Spud Date: 05/20/2016 | |
Permit Date: 12/29/2015 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.563814 | |
Longitude: -77.153109 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | SWN PROD CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | SWN PROD CO LLC | 886,794.00 | 89 | 0.00 | 0 | 0.00 | 0 |
2018 | SWN PROD CO LLC | 1,797,344.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | SWN PROD CO LLC | 311,907.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
16AUGU | Drill Cuttings (in Tons) RWC 810 | 9.56 Tons | LANDFILL | 101247 |
16DECU | Fracturing Fluid Waste (in Barrels) RWC 805 | 140.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
16DECU | Fracturing Fluid Waste (in Tons) RWC 805 | 6.42 Tons | LANDFILL | THR029 |
16DECU | Other Oil & Gas Wastes (in Barrels) RWC 899 | 40.94 Bbl | REUSE OTHER THAN ROAD SPREADING | |
16DECU | Produced Fluid (in Barrels) RWC 802 | 95.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
16DECU | Synthetic Liner Materials (in Tons) RWC 806 | 10.50 Tons | LANDFILL | 301626 |
16MAYU | Drill Cuttings (in Tons) RWC 810 | 28.58 Tons | LANDFILL | 101247 |
16NOVU | Drilling Fluid Waste (in Barrels) RWC 803 | 1,375.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
16NOVU | Fracturing Fluid Waste (in Tons) RWC 805 | 17.75 Tons | LANDFILL | THR029 |
16OCTU | Drill Cuttings (in Tons) RWC 810 | 75.34 Tons | LANDFILL | 101247 |
16OCTU | Other Oil & Gas Wastes (in Barrels) RWC 899 | 73.81 Bbl | REUSE OTHER THAN ROAD SPREADING | |
16SEPU | Drill Cuttings (in Tons) RWC 810 | 318.99 Tons | LANDFILL | 101247 |
2016-05 | Drill Cuttings (in Tons) RWC 810 | 28.58 Tons | LANDFILL | 101247 |
2016-08 | Drill Cuttings (in Tons) RWC 810 | 9.56 Tons | LANDFILL | 101247 |
2016-09 | Drill Cuttings (in Tons) RWC 810 | 318.99 Tons | LANDFILL | 101247 |
2016-10 | Drill Cuttings (in Tons) RWC 810 | 75.34 Tons | LANDFILL | 101247 |
2016-10 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 73.81 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-11 | Drilling Fluid Waste (in Barrels) RWC 803 | 1,375.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-11 | Fracturing Fluid Waste (in Tons) RWC 805 | 17.75 Tons | LANDFILL | THR029 |
2016-12 | Fracturing Fluid Waste (in Barrels) RWC 805 | 140.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-12 | Fracturing Fluid Waste (in Tons) RWC 805 | 6.42 Tons | LANDFILL | THR029 |
2016-12 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 40.94 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-12 | Produced Fluid (in Barrels) RWC 802 | 95.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-12 | Synthetic Liner Materials (in Tons) RWC 806 | 10.50 Tons | LANDFILL | 301626 |
2017-01 | Produced Fluid (in Barrels) RWC 802 | 6,746.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017-02 | Spent Lubricant Waste (in Barrels) RWC 809 | 110.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-03 | Produced Fluid (in Barrels) RWC 802 | 8,093.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017-04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 75.00 Bbl | REUSE (AT WELL PAD) | |
2017-04 | Synthetic Liner Materials (in Tons) RWC 806 | 20.00 Tons | LANDFILL | 301358 |
2017-05 | Produced Fluid (in Barrels) RWC 802 | 5,363.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017-06 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 55.00 Bbl | REUSE (AT WELL PAD) | |
2017-07 | Drill Cuttings (in Tons) RWC 810 | 848.53 Tons | LANDFILL | 301358 |
2017-07 | Synthetic Liner Materials (in Tons) RWC 806 | 1.35 Tons | LANDFILL | 301358 |
2017-08 | Filter Socks (in Tons) RWC 812 | 5.00 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-08 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 90.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017-08 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2017-08 | Synthetic Liner Materials (in Tons) RWC 806 | 5.24 Tons | LANDFILL | 301358 |
2017-09 | Produced Fluid (in Barrels) RWC 802 | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017-09 | Unused Fracturing Fluid Waste (in Tons) RWC 805 | 9.22 Tons | LANDFILL | 301358 |
2017-10 | Produced Fluid (in Barrels) RWC 802 | 32.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017-10 | Produced Fluid (in Barrels) RWC 802 | 5.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017-10 | Produced Fluid (in Barrels) RWC 802 | 11,205.25 Bbl | REUSE (AT WELL PAD) | |
2017-10 | Produced Fluid (in Barrels) RWC 802 | 5,721.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2017-11 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2017-11 | Produced Fluid (in Barrels) RWC 802 | 4,545.00 Bbl | REUSE (AT WELL PAD) | |
2017-11 | Produced Fluid (in Barrels) RWC 802 | 1,693.75 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2017-11 | Produced Fluid (in Tons) RWC 802 | 13.98 Tons | LANDFILL | 301358 |
2017-11 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 2.74 Tons | LANDFILL | 301358 |
2017-11 | Spent Lubricant Waste (in Barrels) RWC 809 | 27.50 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-11 | Synthetic Liner Materials (in Tons) RWC 806 | 2.68 Tons | LANDFILL | 301358 |
2017-12 | Produced Fluid (in Barrels) RWC 802 | 120.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017-12 | Produced Fluid (in Barrels) RWC 802 | 2,794.50 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-01 | Produced Fluid (in Barrels) RWC 802 | 7,937.50 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-01 | Synthetic Liner Materials (in Tons) RWC 806 | 4.77 Tons | LANDFILL | 301358 |
2018-02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 36.67 Bbl | REUSE (AT WELL PAD) | |
2018-02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 44.86 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-02 | Produced Fluid (in Barrels) RWC 802 | 1,320.00 Bbl | REUSE (AT WELL PAD) | |
2018-02 | Produced Fluid (in Barrels) RWC 802 | 1,783.67 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-02 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 43.51 Tons | LANDFILL | 301358 |
2018-03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 17.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-03 | Produced Fluid (in Barrels) RWC 802 | 160.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018-03 | Produced Fluid (in Barrels) RWC 802 | 2,255.00 Bbl | REUSE (AT WELL PAD) | |
2018-03 | Produced Fluid (in Barrels) RWC 802 | 588.00 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018-03 | Synthetic Liner Materials (in Tons) RWC 806 | 5.00 Tons | LANDFILL | 301358 |
2018-04 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2018-04 | Produced Fluid (in Barrels) RWC 802 | 590.75 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018-05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 28.75 Bbl | REUSE (AT WELL PAD) | |
2018-05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 27.50 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018-05 | Produced Fluid (in Barrels) RWC 802 | 1,205.00 Bbl | REUSE (AT WELL PAD) | |
2018-05 | Produced Fluid (in Barrels) RWC 802 | 219.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-06 | Produced Fluid (in Barrels) RWC 802 | 1,045.00 Bbl | REUSE (AT WELL PAD) | |
2018-06 | Produced Fluid (in Barrels) RWC 802 | 652.25 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018-07 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 50.96 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018-07 | Produced Fluid (in Barrels) RWC 802 | 1,894.75 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018-07 | Produced Fluid (in Barrels) RWC 802 | 35.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-08 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018-08 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2018-08 | Produced Fluid (in Barrels) RWC 802 | 610.00 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018-08 | Produced Fluid (in Barrels) RWC 802 | 1,285.25 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-09 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2018-09 | Produced Fluid (in Barrels) RWC 802 | 202.50 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018-09 | Produced Fluid (in Barrels) RWC 802 | 1,561.25 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-10 | Produced Fluid (in Barrels) RWC 802 | 1,510.00 Bbl | REUSE (AT WELL PAD) | |
2018-10 | Produced Fluid (in Barrels) RWC 802 | 485.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-11 | Produced Fluid (in Barrels) RWC 802 | 1,122.50 Bbl | REUSE (AT WELL PAD) | |
2018-11 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | SURFACE IMPOUNDMENT | 826342 |
2018-11 | Produced Fluid (in Barrels) RWC 802 | 522.50 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2018-12 | Produced Fluid (in Barrels) RWC 802 | 292.50 Bbl | REUSE (AT WELL PAD) | |
2018-12 | Produced Fluid (in Barrels) RWC 802 | 1,377.50 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019-01 | Produced Fluid (in Barrels) RWC 802 | 190.00 Bbl | REUSE (AT WELL PAD) | |
2019-01 | Produced Fluid (in Barrels) RWC 802 | 182.50 Bbl | SURFACE IMPOUNDMENT | 826342 |
2019-01 | Produced Fluid (in Barrels) RWC 802 | 790.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019-02 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2019-02 | Produced Fluid (in Barrels) RWC 802 | 275.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019-03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 25.00 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
2019-03 | Produced Fluid (in Barrels) RWC 802 | 210.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC035 |
2019-03 | Produced Fluid (in Barrels) RWC 802 | 85.00 Bbl | REUSE (AT WELL PAD) | |
2019-03 | Produced Fluid (in Barrels) RWC 802 | 497.50 Bbl | SURFACE IMPOUNDMENT | 95-16-65420-013 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2519592 | Primary Facility | 2016-09-16 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess conditions on the well site during drilling operations. Crews were in process of breaking down a drill rig in order to make way for a larger rig. All equipement and chemicals on site were within containment. No evidence of spills such as staining, odors, or puddles were observed on the well pad.
No violations were cited during this inspection. |
2535742 | Primary Facility | 2016-11-09 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess conditions during well completion activities.
A petroleum sheen was observed off of containment along the western side of the well site. The sheen extended from near the job operations trailer toward the southwest corner of the well pad. Most of the sheen area was silvery, with a brightly colored sheen closest to the job trailer. Two site personnel were spot cleaning with petroleum absorbent pads within the spill area upon my arrival. I informed Jonathan Sites of Southwestern, the on-site representative, of these findings, and recommended that additional clean up measures be implemented. I also contacted Afton Sterling, Southwestern Regulatory Manager, and informed her of my findings. She indicated that a crew would be dispatched to vacuum the puddles in the spill area and scrape the pad surface to remove affected material. During my call with Ms. Sterling, she mentioned an estimated 3-5 gallon ethelyne glycol spill that had occurred off containment the previous ni |
2540693 | Primary Facility | 2016-12-01 | Routine/Complete Inspection | No Violations Noted | |
2566097 | Primary Facility | 2017-03-01 | Routine/Complete Inspection | No Violations Noted | Flowback operations in progress. Electrical conductvity of puddles on the pad surface ranged from 430-980 uS/cm. No violations cited. |
2584630 | Primary Facility | 2017-04-11 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 4/11/2017.
I entered the site at 10:00 with Derek Collins and Jamie Soto (DEP) and talked to the Company Man, Mr. Hale. At the time of the inspection, personnel onsite were rigging-up the Falcon 25 on the Lepley 4H (117-21832) well which was SPUD previously. Containment liner was installed under rig mats and the berm was being installed. Chemical storage was already marked and in containment. Two wells onsite were previously drilled and were protected by steel structures. The Lepley 3H (117-21800) was being produced. The site was stabilized and no E&S issues were noted. No Violations Noted. |
2588566 | Primary Facility | 2017-04-27 | Routine/Complete Inspection | No Violations Noted | |
2632727 | Primary Facility | 2017-09-06 | Routine/Partial Inspection | No Violations Noted | Inspection to assess site conditions during well completion activities.
Most of the pad surface is covered with containment. All equipment, fuel, additives, and materials are within secondary containment. The electrical conductivity of puddles within and outside of the containment was screened and ranged from 170 to 495 uS/cm. It was noted that site traffic is depositing mud on the public roadway (Milk Plant Road). It is recommended that the public roadway be swept clean to ensure safe travel conditions for the general public and site personnel. No violations cited. |
2647059 | Primary Facility | 2017-10-13 | Routine/Partial Inspection | No Violations Noted | Inspection to assess site conditions during flowback operations. Most of the containment on site during the drilling and completion processes has been removed. Containment is in place around the well heads, brine tanks and other equipment. The electrical conductance of puddles on the well pad surface was screened, and ranged from275-475 uS/cm. No violations cited. |
2647772 | Primary Facility | 2017-10-13 | Routine/Complete Inspection | No Violations Noted | Frac has been completed, site is in flowback phase. Falcon Flowback Services on site with temporary GPU train. Containment was in excellent condition. Water puddled both on the pad surface and in containments showed low conductance (.076-.54 mS/cm). |
2694266 | Primary Facility | 2018-02-12 | Routine/Complete Inspection | No Violations Noted | Weather was 33° and sunny at time of inspection. Well has a digital gauge attached to the swab valve and also to the 5 1/2 x 9 5/8 annulus event. The digital gauge attached to the swab valve read 446 psi and the annulus gauge read 343 psi at time of inspection. No other annulus vents were observed at time of inspection. No violations were noted at time of inspection. |
2775132 | Primary Facility | 2018-09-11 | Routine/Complete Inspection | No Violations Noted | Southwestern Energy (SWN) submitted a well site restoration report to the Department for the SWN TI-04-Lepley Pad. The report was received on 8/28/18.
I arrived at the access road entrance and was approached by a pipeline worker, Dirk. He asked if i was inspecting the pipeline construction then left. Due to recent rain there was some ponding water on the pad. The water in one of these puddles had a conductivity of 156.6 µS/cm. There are 4 properly tagged wells staged for production (Lepley 1H, 3H, 4H, & 6H). There are 4 GPUs onsite and in secondary containment. Water in GPU secondary containment had a conductivity of 160.2 µS/cm. There are 2 produced water tanks onsite and in secondary containment. Water in this secondary containment had a conductivity of 801 µS/cm. The smaller produced water tank appeared to be disconnected from all other equipment. The larger, connected tank appeared to have some rust colored staining near the top and rusting/holes near the bottom (Photos # 6 & 7). The first PCSM BMP i |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/15/2017 | 09/22/2017 | 7346 | 9,811,100.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SI-1200s | U.S. Well Services, LLC | Scale Inhibitor | Alkyl Phosphonic Acid | Proprietary | 5 | 0.0006 | 580.047 |
Ammonia | 7664-41-7 | 0.5 | 0.00009000 | 88.7472 | ||||
Water | Southwestern Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.3871 | 81,824,600.0 | |
K-BAC 1005 | U.S. Well Services, LLC | Anti-Bacterial Agent | Water | 7732-18-5 | 44.3 | 0.00551 | 5346.12 | |
Polyethylene Glycol | 25322-68-3 | 50 | 0.00697 | 6758.07 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5.76 | 0.00176 | 1703.73 | ||||
WFRA-2000 | U.S. Well Services, LLC | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.0209 | 20264 | |
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.02549 | 24712.3 | ||||
Water | 7732-18-5 | 60 | 0.05097 | 49424.5 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Cinnamaldehyde | 104-55-2 | 20 | 0.00006000 | 56.9155 | |
Ethylene glycol | 107-21-1 | 40 | 0.00016 | 157.426 | ||||
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00001000 | 13.761 | ||||
Polyether | 60828-78-6 | 10 | 0.00003000 | 27.522 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00005000 | 49.5946 | ||||
Formic acid | 64-18-6 | 20 | 0.00006000 | 55.044 | ||||
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 17.5 | 0.11192 | 108523 | |
Water | 7732-18-5 | 87.4 | 0.48139 | 466768 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 14.907 | 14,454,300.0 |
For data sources see[7]