37-117-21988

Well Details

Well ID: 37-117-21988
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: ROCKDALE MARCELLUS LLC
Well Pad ID: 153703
Farm/Lease Name: HARER 713 2H
License Status: Active
Spud Date: 06/08/2018
Permit Date: 4/19/2018
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.594403
Longitude: -77.045311

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 ROCKDALE MARCELLUS LLC 1,901,018.00 122 0.00 0 0.00 0
2019 ROCKDALE MARCELLUS LLC 1,101,157.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-06 Synthetic Liner Materials (in Tons) RWC 806 0.65 Tons LANDFILL 301358
2018-07 Drill Cuttings (in Tons) RWC 810 1,377.68 Tons LANDFILL 301358
2018-07 Other Oil & Gas Wastes (in Barrels) RWC 899 69.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-07 Other Oil & Gas Wastes (in Barrels) RWC 899 90.00 Bbl REUSE (AT WELL PAD)
2018-07 Produced Fluid (in Barrels) RWC 802 645.00 Bbl REUSE (AT WELL PAD)
2018-07 Synthetic Liner Materials (in Tons) RWC 806 4.11 Tons LANDFILL 301358
2018-08 Produced Fluid (in Barrels) RWC 802 80.00 Bbl REUSE (AT WELL PAD)
2018-09 Other Oil & Gas Wastes (in Barrels) RWC 899 24.00 Bbl REUSE (AT WELL PAD)
2018-09 Produced Fluid (in Barrels) RWC 802 19.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-09 Produced Fluid (in Barrels) RWC 802 1,910.20 Bbl REUSE (AT WELL PAD)
2018-09 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 15.84 Tons LANDFILL 301358
2018-09 Synthetic Liner Materials (in Tons) RWC 806 2.02 Tons LANDFILL 301358
2018-10 Produced Fluid (in Barrels) RWC 802 615.00 Bbl REUSE (AT WELL PAD)
2018-10 Produced Fluid (in Tons) RWC 802 59.50 Tons LANDFILL 301358
2018-12 Produced Fluid (in Barrels) RWC 802 116.67 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018-12 Produced Fluid (in Barrels) RWC 802 6,762.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-12 Produced Fluid (in Barrels) RWC 802 773.33 Bbl REUSE (AT WELL PAD)
2018-12 Synthetic Liner Materials (in Tons) RWC 806 3.72 Tons LANDFILL 301358
2019-01 Produced Fluid (in Barrels) RWC 802 553.33 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2019-01 Produced Fluid (in Barrels) RWC 802 1,091.67 Bbl REUSE (AT WELL PAD)
2019-01 Synthetic Liner Materials (in Tons) RWC 806 1.14 Tons LANDFILL 301358
2019-02 Other Oil & Gas Wastes (in Barrels) RWC 899 97.78 Bbl REUSE (AT WELL PAD)
2019-02 Produced Fluid (in Barrels) RWC 802 249.67 Bbl REUSE (AT WELL PAD)
2019-02 Synthetic Liner Materials (in Tons) RWC 806 2.31 Tons LANDFILL 301358
2019-03 Other Oil & Gas Wastes (in Barrels) RWC 899 60.67 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Barrels) RWC 802 400.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019-03 Produced Fluid (in Barrels) RWC 802 201.33 Bbl REUSE (AT WELL PAD)
2019-03 Produced Fluid (in Tons) RWC 802 1.67 Tons LANDFILL 301358

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2747071 Primary Facility 2018-06-29 Routine/Complete Inspection No Violations Noted Weather was 70° and sunny at time of inspection. Met with Rockdale Marcellus representative Jim Tracey on location at time of inspection. Rig was in the process of drilling the 12 1/4" hole for the intermediate casing at time of inspection. The surface casing was cemented on 6/25/2018. Reviewed the cement job log and no discrepancies were noted at time of inspection. Rig is anticipating cementing the intermediate casing later this evening. Conducted a walk around inspection of location. No violations noted at time of inspection.
2750086 Primary Facility 2018-07-10 Drilling/Alteration No Violations Noted The weather is 85 Deg. F and sunny at the time of inspection. Routine inspection of Rockdale Marcellus LLC., Harer 713 Pad, well # 2H on July 10, 2018.

Finished drilling and cementing 5-1/2" production string on July 9th at 22:07. Skidding over to the Harer 713 4H well on July 10th. Verified cement PTRs (production string), cement samples and driller's log. Rig is estimating to start drilling on then 4H at approximately midnight. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Richard Becher, Oil and Gas Inspectors. Rockdale Marcellus LLC. Representative ¿ Danny Brooks, Wellsite Supervisor.

2752945 Primary Facility 2018-07-16 Routine/Complete Inspection No Violations Noted Weather was 88° and sunny at time of inspection. Met with Rockdale Marcellus representative Danny Brooks on location at time of inspection. Rig has moved off this well and is on the 4H. Reviewed the cement job log from the production cement job and no discrepancies were noted at time of inspection. Conducted a walk around inspection of location. No violations noted at time of inspection.
2759790 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted I met with Levi Lee, Levi Haigler, and Clayton Harriman when I arrived. Crews were deploying containment, regrading, and laying rig mats for the upcoming frac (estimated start 8/6). Some containment appeared to be left from the drilling rig, and I observed some small tears at the berms in this area. The Rockwater 43 K barrel MASS was deployed on the site. I observed that there was only 16-18" of freeboard in the primary tank, and that ~6-8" of rainwater had collected in the secondary tank containment. I informed Levi Lee of the containment berm tears and the freeboard and water in the secondary containment at the tank, and said that he would address them.
2763056 Primary Facility 2018-08-07 Incident- Response to Accident or Event No Violations Noted Spill response inspection; 8/7/2018.

On 8/6/2018, Regina Logue (Rockdale) called at 17:15 to report a possible leak in the containment. The estimated volume of the release was 10 gallons. I entered the site at 08:46 and met with Adam Altieri, Jennifer Compton, and Marc McCartor (all representing Rockdale). Water was ponded immediately south of the containment and field conductivity was greater than 20,000 umhos/cm (photo 2). Rig mats were being removed and cleaned from the area. Diesel-based drilling mud was being cleaned from the containment where rig mats were removed. The drill mud appeared to cover most if not all of the containment area where rig-mats were removed.

We walked to the the eastern-most well head (117-21857)and they described the release. It is believed water flowed from the containment surface into the cellar (the cellar was filled with gravel). The containment was not sealed to the cellar, so the water filled the cellar and overtopped. Evidence suggests the produced water flowed from the

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/07/2018 08/29/2018 7375.66 17,152,700.0 171558

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ScaleTreat 14448 Clariant Scale Inhibitor 2,2',2 - Nitrilotris(acetamide) 4862-18-4 5 0.00113 1889
Ammonium Chloride 12125-02-9 5 0.00113 1889
Methanol 67-56-1 60 0.0136 22668
ProFE 105 ProFrac Iron Control Sulphamic Acid 5329-14-6 5 0.00014 229
Water 7732-18-5 70 0.00192 3202
Citric Acid 77-92-9 40 0.0011 1830
Water Rockdale Marcellus Base Fluid Water 7732-18-5 100 85.8674 143,139,000.0
Hydrochloric Acid FSTI Acidizing Water 7732-18-5 72 0.56032 934042
hydrogen chloride 7647-01-0 28 0.2179 363238
FloTreat DR 15482 Clariant Friction Reducer Alcohols, C10-16, 6 EO 68002-97-1 10 0.00641 10693
Hydrocarbons C9- C16 64742-47-8 50 0.03207 53466
BioTreat Clariant Biocide Dideclydimethylammonium Chloride 7173-51-5 3 0.00105 1752
Glutaraldehyde 111-30-8 20 0.00701 11679
Quaternary Ammonium Chloride 68424-85-1 3 0.00105 1752
Sand 100 Mesh ProFrac Proppant Silica Substrate 14808-60-7 100 2.2084 3,681,360.0
ProHib 100 ProFrac Acid Inhibitor 2-Propyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00034 572
Water 7732-18-5 85 0.00194 3240
Sand 40/70 ProFrac Proppant Silica Substrate 14808-60-7 100 11.0191 18,368,600.0

For data sources see[7]