If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-117-22035 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.625742,"lon":-77.045586,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Tioga | |
Municipality: Liberty Township | |
Operator Name: PA GEN ENERGY CO LLC | |
Well Pad ID: 145499 | |
Farm/Lease Name: COP TRACT 596 PAD B 2759 | |
License Status: Active | |
Spud Date: 11/27/2018 | |
Permit Date: 11/9/2018 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.625742 | |
Longitude: -77.045586 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | PA GEN ENERGY CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2018-11 | Drill Cuttings (in Tons) RWC 810 | 39.52 Tons | LANDFILL | 301358 |
2019-01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 6.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019-01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 12.50 Bbl | REUSE (AT WELL PAD) | |
2019-01 | Produced Fluid (in Barrels) RWC 802 | 13.13 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019-01 | Produced Fluid (in Barrels) RWC 802 | 25.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019-01 | Produced Fluid (in Barrels) RWC 802 | 13.38 Bbl | REUSE (AT WELL PAD) | |
2019-02 | Drill Cuttings (in Tons) RWC 810 | 119.60 Tons | LANDFILL | 301358 |
2019-02 | Produced Fluid (in Barrels) RWC 802 | 12.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019-02 | Produced Fluid (in Barrels) RWC 802 | 8.75 Bbl | REUSE (AT WELL PAD) | |
2019-03 | Drill Cuttings (in Tons) RWC 810 | 272.12 Tons | LANDFILL | 301358 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2811280 | Primary Facility | 2018-12-06 | Routine/Complete Inspection | No Violations Noted | Weather was 32° and cloudy at time of inspection. Met with PGE representative Dick Patrick on location. A crew was on site setting cellars in place at time of inspection. Well was a spud conductor. There was a steel plate covering the casing at time of inspection. 0% combustible gas was detected anywhere around the well at time of inspection. No violations were noted at time of inspection. |
2848077 | Primary Facility | 2019-03-05 | Routine/Complete Inspection | No Violations Noted | Weather was 12 degrees and sunny. Met with PGE representative Dave Waggoner and Ron Kaler on location. Well recently had its surface casing cemented. Reviewed the job log and no discrepancies were noted at time of inspection. Well was shut in with a night cap and will be completed at a later date. No violations at time of inspection. |
2856242 | Primary Facility | 2019-03-20 | Routine/Complete Inspection | No Violations Noted | Weather was 40 degrees and sunny. Met with PGE representatives Zachary Firdurko and Chauncey Klein on location. This well recently had its intermediate casing drilled and cemented to TD. Reviewed cement job logs and no discrepancies were noted at time of inspection. Well was drilled to kick off and filled with oil base mud. Well was covered with a nightcap and rig skidded over to the 2760. No violations noted at time of inspection. |
For data sources see[6]