Well ID: 37-125-28382 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.164867,"lon":-79.9446,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Carroll Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 145213 | |
Farm/Lease Name: R. SMITH MON99H24 | |
License Status: Active | |
Spud Date: 10/16/2017 | |
Permit Date: 10/12/2017 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.164867 | |
Longitude: -79.9446 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2017-10 | Drill Cuttings (in Tons) RWC 810 | 164.77 Tons | LANDFILL | 100277 |
2017-10 | Drilling Fluid Waste (in Barrels) RWC 803 | 50.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-10 | Synthetic Liner Materials (in Tons) RWC 806 | 4.37 Tons | LANDFILL | 100277 |
2017-11 | Drill Cuttings (in Tons) RWC 810 | 562.65 Tons | LANDFILL | 100277 |
2017-11 | Drilling Fluid Waste (in Barrels) RWC 803 | 1,135.00 Bbl | REUSE (AT WELL PAD) | |
2017-12 | Synthetic Liner Materials (in Tons) RWC 806 | 13.47 Tons | LANDFILL | 100277 |
2018-03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 10.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018-03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 37.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 2.27 Bbl | REUSE (AT WELL PAD) | |
2018-04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 2.27 Bbl | REUSE (AT WELL PAD) | |
2018-05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 11.82 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 13.18 Bbl | REUSE (AT WELL PAD) | |
2018-06 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 14.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-06 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 4.09 Bbl | REUSE (AT WELL PAD) | |
2018-07 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 0.91 Bbl | REUSE (AT WELL PAD) | |
2018-07 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-08 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.45 Bbl | REUSE (AT WELL PAD) | |
2018-09 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018-09 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 6.36 Bbl | REUSE (AT WELL PAD) | |
2018-09 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.45 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-10 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 23.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-10 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.00 Bbl | REUSE (AT WELL PAD) | |
2018-11 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.00 Bbl | REUSE (AT WELL PAD) | |
2018-12 | Drill Cuttings (in Tons) RWC 810 | 37.15 Tons | LANDFILL | 100277 |
2018-12 | Drilling Fluid Waste (in Barrels) RWC 803 | 340.00 Bbl | REUSE (AT WELL PAD) | |
2018-12 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 3.41 Bbl | REUSE (AT WELL PAD) | |
2019-01 | Drill Cuttings (in Tons) RWC 810 | 726.62 Tons | LANDFILL | 100172 |
2019-01 | Drilling Fluid Waste (in Barrels) RWC 803 | 480.00 Bbl | REUSE (AT WELL PAD) | |
2019-01 | Drilling Fluid Waste (in Tons) RWC 803 | 50.81 Tons | RESIDUAL WASTE PROCESSING FACILITY | |
2019-01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 103.63 Bbl | REUSE (AT WELL PAD) | |
2019-01 | Synthetic Liner Materials (in Tons) RWC 806 | 69.31 Tons | LANDFILL | 100277 |
2019-02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 75.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2019-03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 80.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2650229 | Primary Facility | 2017-10-20 | Drilling/Alteration | No Violations Noted | Cellar Tech auger rig drilled 30" well bore and set 26" conductor casing at 40 ft. on 10/20/17. |
2650257 | Primary Facility | 2017-10-20 | Drilling/Alteration | No Violations Noted | Fountain Quail Drilling Rig #8 Moved onto this well on 10/17/17 and resumed drilling at 53 ft. KB on 10/18/17. The 18 5/8" casing was set at 282 ft. on 10/19/17. Operator attempted to cement casing to surface but was unable to do so. TOC was found at 76 ft. Casing was grouted to surface. The 13 3/8" casing was set at 443 ft. on 10/20/17 and cemented to surface with 25 bbls returned. Coal was found from 344 ft. to 352 ft. A basket was set at 300 ft. Currently at 493 ft. Moving to next well.
Note: Operator was informed that not displacing cement to surface on the 18 5/8" casing is a defective cement job and it will be necessary to cement production casing to surface. |
2660206 | Primary Facility | 2017-11-09 | Routine/Complete Inspection | No Violations Noted | On 11/10/17 a routine complete inspection of the R. Smith well site was conducted in response to notification additional drilling on site. The following was observed:
>>A box tank was found near the impoundment with no containment. Remediation recommended, no violation. >>A new top soil stock pile was noted on site. It was stabilized with straw at the time of inspection. >>The soil stock pile was noted to not have any functional controls below it other than an adequate vegetated strip. Decomposed CFS should be removed, repaired, or replaced. No violation. >>Drilling was ongoing at the site at the time of inspection. |
2663276 | Primary Facility | 2017-11-21 | Drilling/Alteration | No Violations Noted | Fountain Quail Drilling Rig #8 reentered this well on 11/17/17 and resumed drilling at 501 ft. The 9 5/8" casing was set at 1677 ft. on 11/19/17 and cemented to surface with 40 bbls returned. A Casind Annulus Packer was set in the 9 5/8" drill string from 1267 ft. to 1277 ft. Currently at 3307 ft. and drilling ahead. |
2705721 | Primary Facility | 2018-03-13 | Routine/Partial Inspection | No Violations Noted | On 3/14/18 a routine complete inspection of the R. Smith Well Site was conducted in response to a notification of proposed construction activity on the pad. The following was observed:
>>The site was in a high activity phase at the time of inspection drilling appeared to be completed and the site was in apparent transition to post drilling activities. No drilling rig was present on site at the time of inspection. >>Construction of a proposed AST had not begun at the time of inspection. >>Many water trucks were present on site in association with the attached impoundment. |
2738556 | Primary Facility | 2018-05-16 | Incident- Response to Accident or Event | No Violations Noted | On 5/16/18 an incident inspection of the R. Smith well site was conducted in response to a spill reported by the operator on 5/14/18. The following was observed:
>>The operator reported that roughly 35 gallons of mixed rain water and produced water was spilled to the pad when a section of containment was moved without being drained first. Fluids were spread over a large area of the pad along the area in front of the production units per discussion with Mike Cromley at the time of inspection. This does constitute a violation of 25 Pa. Code § 78.54 and 25 Pa. Code § 78.57(a) in that the operator failed to control regulated materials in a manner that prevents prevents pollution to the ground or Waters of the Commonwealth however, the violation is regarded as immediately corrected. >>Site inspection found no residual evidence of the spill. The operator reported that all visibly impacted gravel from the spill area had been removed (roughly two clamshell dumpsters). |
2747595 | Primary Facility | 2018-06-29 | Routine/Partial Inspection | No Violations Noted | On 6/29/18 a routine partial inspection of the R. Smith Well Site was conducted in response to concerns about runoff raised by a nearby resident. The following was observed:
>>An unstabilized soil pile near the corner of the pad with a newly improved drain. Controls below the pile were absent though the vegetation was sufficient. No violation, remediation recommended. >>Another only partially stabilized soil pile with no controls below the pile was located along the accessory pad access road. No controls beyond vegetation were present below the soil pile. No violation, monitoring recommended. >>An AST was present on the accessory pad. >>The pad was active at the time of inspection with drilling preparations ongoing. A sound wall was present around the pad perimeter. |
2762090 | Primary Facility | 2018-08-02 | Routine/Complete Inspection | No Violations Noted | On 8/2/18 a complaint response inspection was conducted of the R Smith well site in response to reported concerns of inappropriate drainage from the pad. WQSS John Carson accompanied. The following was observed:
>>A top soil pile on the access road to the accessory pad remained lacking vegetation and with spotty temporary stabilization. The vegetative strip below remains in good condition. Remediation recommended, no violation. >>Emptying partially filled containment is encouraged to aid in identifying any possible leaks. No violation. >>No evidence of excessive or unpermitted runoff from the pad was found. >>Box in containment appears to be collecting emergency blowdown. If so it should be properly marked. No violation. |
2829342 | Primary Facility | 2019-01-11 | Drilling/Alteration | No Violations Noted | Patterson-UTI Drilling Rig #277 moved onto this well on 2/26/18. TIH and tagged bottom at 6076 ft. TOOH and picked up 3 1/2" fiberglass tubing. Set kick off plug from 6078 ft. to 4743 ft. on 12/28/18. Resumed drilling at 4743 ft. on 12/29/18. KOP was at 4939 ft. EOB was at 8015 ft. MD (7275 ft. TVD). TD was at 14,095 ft. MD (7272.48 ft. TVD) on 1/4/19. The 5 1/2" casing was set at 14,081 ft. KB. Estimated TOC at 3807 ft.
Note: Operator side tracked because side track on R. Smith 595150 was too close to this well bore. |
For data sources see[6]