If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-033-25781 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.179138,"lon":-78.651379,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clearfield | |
Municipality: Huston Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: CHAGRIN BEL 21 | |
License Status: Active | |
Spud Date: 04/03/2005 | |
Permit Date: 3/11/2005 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.179138 | |
Longitude: -78.651379 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2006 | 0.00 | 0.00 | 0.00 | ||||
2007 | NORTH EAST GAS & OIL CO | 2,038.00 | 160 | 0.00 | 0.00 | ||
2008 | NORTH EAST GAS & OIL CO | 1,341.00 | 209 | 0.00 | 0.00 | ||
2009 | NORTH EAST GAS & OIL CO | 945.00 | 174 | 0.00 | 0.00 | ||
2010 | NORTH EAST GAS & OIL CO | 545.00 | 90 | 0.00 | 0.00 | ||
2011 | NORTH EAST GAS & OIL CO | 333.00 | 45 | 0.00 | 0.00 | ||
2012 | DANNIC ENERGY CORP | 149.00 | 184 | 0.00 | 0.00 | ||
2013 | DANNIC ENERGY CORP | 550.00 | 365 | 0.00 | 0.00 | ||
2014 | DANNIC ENERGY CORP | 758.00 | 365 | 0.00 | 0.00 | ||
2015 | DANNIC ENERGY CORP | 463.24 | 365 | 0.00 | 0.00 | ||
2016 | DANNIC ENERGY CORP | 422.00 | 366 | 0.00 | 0.00 | ||
2017 | DANNIC ENERGY CORP | 150.00 | 365 | 0.00 | 0.00 | ||
2018 | DANNIC ENERGY CORP | 271.00 | 365 | 0.00 | 0.00 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2008-A00 | Brine | 111.00 Bbl | Landfill | 101397 |
2010-A00 | Produced Fluid (in Barrels) | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2013-A00 | Produced Fluid (in Barrels) | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2013-A00 | Produced Fluid (in Barrels) | 320.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
2014-A00 | Produced Fluid (in Barrels) | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2014-A00 | Produced Fluid (in Barrels) | 80.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[5]