If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-033-26847 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Country: United States | |
State: Pennsylvania | |
County: Clearfield | |
Municipality: Ferguson Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 148568 | |
Farm/Lease Name: HURD 590398 | |
License Status: Active | |
Spud Date: 08/31/2010 | |
Permit Date: 8/20/2009 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.850277 | |
Longitude: -78.659964 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | 0.00 | 0.00 | 0.00 | ||||
2010 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | EQT PROD CO | 63,455.00 | 54 | 0.00 | 0 | 0.00 | 0 |
2013 | EQT PROD CO | 550,831.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EQT PROD CO | 266,394.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EQT PROD CO | 232,720.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 259,283.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 174,473.00 | 350 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 138,607.00 | 355 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 52,366.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2010-S02 | Drilling Fluid Waste (in Barrels) | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2011-S01 | Drilling Fluid Waste (in Barrels) | 2,350.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011-S01 | Drilling Fluid Waste (in Barrels) | 370.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011-S01 | Drilling Fluid Waste (in Barrels) | 1,100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012-S01 | Fracing Fluid Waste (in Barrels) | 100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S02 | Fracing Fluid Waste (in Barrels) | 750.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S02 | Produced Fluid (in Barrels) | 154.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 525-1 |
2012-S02 | Produced Fluid (in Barrels) | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-007-24355 |
2012-S02 | Produced Fluid (in Barrels) | 164.00 Bbl | INJECTION DISPOSAL WELL | 34-083-24137 |
2012-S02 | Produced Fluid (in Barrels) | 460.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2012-S02 | Produced Fluid (in Barrels) | 880.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2012-S02 | Produced Fluid (in Barrels) | 214.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S01 | Produced Fluid (in Barrels) | 1,362.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2013-S01 | Produced Fluid (in Barrels) | 813.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013-S01 | Produced Fluid (in Barrels) | 553.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21447 |
2013-S01 | Produced Fluid (in Barrels) | 6,977.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Produced Fluid (in Barrels) | 112.00 Bbl | INJECTION DISPOSAL WELL | 34-031-27177 |
2013-S02 | Produced Fluid (in Barrels) | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-083-24137 |
2013-S02 | Produced Fluid (in Barrels) | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-099-2-1956 |
2013-S02 | Produced Fluid (in Barrels) | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28780 |
2013-S02 | Produced Fluid (in Barrels) | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013-S02 | Produced Fluid (in Barrels) | 94.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013-S02 | Produced Fluid (in Barrels) | 313.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2013-S02 | Produced Fluid (in Barrels) | 234.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013-S02 | Produced Fluid (in Barrels) | 102.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2013-S02 | Produced Fluid (in Barrels) | 9,705.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S01 | Produced Fluid (in Barrels) | 307.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2014-S01 | Produced Fluid (in Barrels) | 106.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014-S01 | Produced Fluid (in Barrels) | 5,601.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S02 | Produced Fluid (in Barrels) | 415.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2014-S02 | Produced Fluid (in Barrels) | 310.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014-S02 | Produced Fluid (in Barrels) | 4,544.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S01 | Fracing Fluid Waste (in Barrels) | 100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S01 | Produced Fluid (in Barrels) | 160.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2015-S01 | Produced Fluid (in Barrels) | 130.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2015-S01 | Produced Fluid (in Barrels) | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2015-S01 | Produced Fluid (in Barrels) | 234.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2015-S01 | Produced Fluid (in Barrels) | 3,206.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Produced Fluid (in Barrels) | 118.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015-S02 | Produced Fluid (in Barrels) | 65.00 Bbl | INJECTION DISPOSAL WELL | 34-007-23262 |
2015-S02 | Produced Fluid (in Barrels) | 65.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20525 |
2015-S02 | Produced Fluid (in Barrels) | 3,184.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 289.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 1,919.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 728.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 130.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 503.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 150.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 225.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 380.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 665.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 75.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 825.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 975.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 130.00 Bbl | REUSE (AT WELL PAD) | |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 600.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 130.00 Bbl | REUSE (AT WELL PAD) | |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 750.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 138.64 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 150.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 600.00 Bbl | REUSE (AT WELL PAD) | |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 450.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 300.00 Bbl | REUSE (AT WELL PAD) | |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 36.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 341.00 Bbl | REUSE (AT WELL PAD) | |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 43.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 37.81 Bbl | REUSE (AT WELL PAD) | |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 123.78 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 192.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 96.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 271.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 243.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 194.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 212.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 50.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 27.08 Bbl | REUSE (AT WELL PAD) | |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 31.41 Bbl | REUSE (AT WELL PAD) | |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 14.87 Bbl | REUSE (AT WELL PAD) | |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 47.90 Bbl | REUSE (AT WELL PAD) | |
2018-M08 | Other Oil & Gas Wastes (in Tons) RWC 899 | 3.84 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 118.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 61.32 Bbl | REUSE (AT WELL PAD) | |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 70.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 180.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 35.00 Bbl | REUSE (AT WELL PAD) | |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 439.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 36.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 210.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 119.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 31.83 Bbl | REUSE (AT WELL PAD) | |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 46.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 79.80 Bbl | REUSE (AT WELL PAD) | |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 449.64 Bbl | REUSE (AT WELL PAD) | |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 223.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 38.01 Bbl | REUSE (AT WELL PAD) | |
2019-M03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 65.00 Bbl | REUSE (AT WELL PAD) | |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 73.66 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1912771 | Primary Facility | 09/10/2010 | Drilling/Alteration | No Violations Noted | H&P rig # 217 is currently an 8 3/4" hole vertically at 3024' |
1927001 | Primary Facility | 11/08/2010 | Drilling/Alteration | No Violations Noted | Admiral Well Services on site drilling out plugs with rig assist snubbing unit |
2124968 | Primary Facility | 12/20/2012 | Routine/Complete Inspection | No Violations Noted | |
2128870 | Primary Facility | 01/09/2013 | Routine/Complete Inspection | No Violations Noted | |
2182190 | Primary Facility | 07/10/2013 | Routine/Complete Inspection | No Violations Noted | |
2189671 | Primary Facility | 08/07/2013 | Routine/Complete Inspection | No Violations Noted | |
2247673 | Primary Facility | 02/24/2014 | Routine/Complete Inspection | No Violations Noted | |
2305689 | Primary Facility | 09/22/2014 | Site Restoration | No Violations Noted | |
2403349 | Primary Facility | 08/31/2015 | Routine/Complete Inspection | No Violations Noted | |
2450757 | Primary Facility | 2016-02-17 | Routine/Complete Inspection | No Violations Noted | |
2571314 | Primary Facility | 2017-03-09 | Routine/Complete Inspection | No Violations Noted | |
2628902 | Primary Facility | 2017-08-22 | Routine/Complete Inspection | No Violations Noted | Routine site inspection at EQT's Hurd West Pad on August 22, 2017. No one was onsite during my inspection. There are a total of 4 producing Marcellus wells on this pad (033-26828, 033-26846, 033-26847, 033-27031).
Each well head is properly tagged with the permit number. Each well flows to its own separate production unit. There are (2) 400 BBL produced fluids tanks located in secondary containment onsite with approximately 2 inches of water in it. Field screen reading for specific conductance was 8.06 mS/cm within this secondary containment. This water should be properly treated and not discharged to the ground. I did not observe any leaks from containment or tears within the containment liner. There is a skid mounted compressor unit stationed in the SW corner of the pad. Gas flows through the compressor before discharging into the Hurd gathering line. This pad has been partially restored; perennial vegetation is growing very well. The previous ESCG for this pad has been terminated by the Department. Plea |
2841144 | Primary Facility | 2019-02-14 | Routine/Complete Inspection | No Violations Noted | Routine site inspection at EQT's Hurd West Pad on February 14, 2019. No one was onsite during my inspection. There are a total of 4 producing Marcellus wells on this pad (033-26828, 033-26846, 033-26847, 033-27031).
Each well head is properly tagged with the permit number. Each well flows to its own separate production unit. There are (2) 400 BBL produced fluids tanks located in secondary containment onsite. Water within containment is frozen and snow covered. There is a skid mounted compressor unit stationed in the SW corner of the pad. Gas flows through the compressor before discharging into the Hurd gathering line. This pad has been partially restored. The site was snow covered. No E&S issues observed. The previous ESCGP for this pad has been terminated by the Department. No violations noted. |
For data sources see[6]