X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-035-21233

Well Details

Well ID: 37-035-21233
Loading map...
Country: United States
State: Pennsylvania
County: Clinton
Municipality: Grugan Township
Operator Name: ARD OPR LLC
Well Pad ID: 148052
Farm/Lease Name: COP TRACT 285 B 1011H
License Status: Active
Spud Date: 12/29/2010
Permit Date: 12/1/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.369267
Longitude: -77.559458

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2011 ANADARKO E&P ONSHORE LLC 928,816.00 237 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 908,983.00 366 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 758,995.00 365 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 547,867.00 338 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 457,962.00 297 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 440,803.00 366 0.00 0 0.00 0
2017 ANADARKO E&P ONSHORE LLC 366,489.56 365 0.00 0 0.00 0
2018 ARD OPR LLC 320,162.19 365 0.00 0 0.00 0
2019 ARD OPR LLC 75,182.56 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-S01 Drill Cuttings (in Tons) 951.42 Tons LANDFILL 101397
2012-S02 Produced Fluid (in Barrels) 1,677.52 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 1,558.99 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 1,293.40 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 649.47 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 414.95 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 308.95 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 225.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015-S02 Produced Fluid (in Barrels) 31.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016-M09 Produced Fluid (in Barrels) RWC 802 177.44 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016-M10 Produced Fluid (in Barrels) RWC 802 88.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016-M11 Produced Fluid (in Barrels) RWC 802 88.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016-M11 Produced Fluid (in Barrels) RWC 802 83.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016-M12 Produced Fluid (in Barrels) RWC 802 23.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2016-M12 Produced Fluid (in Barrels) RWC 802 57.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016-S01 Produced Fluid (in Barrels) RWC 802 460.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016-S01 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016-S02 Produced Fluid (in Barrels) RWC 802 169.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2017-M02 Produced Fluid (in Barrels) RWC 802 72.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017-M04 Produced Fluid (in Barrels) RWC 802 72.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-M05 Produced Fluid (in Barrels) RWC 802 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-M06 Produced Fluid (in Barrels) RWC 802 59.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-M09 Produced Fluid (in Barrels) RWC 802 70.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-M10 Produced Fluid (in Barrels) RWC 802 68.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-M12 Produced Fluid (in Barrels) RWC 802 51.15 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 90.00 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 87.34 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 87.64 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 46.05 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 78.52 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 68.41 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 84.18 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1939845 Primary Facility 12/30/2010 Routine/Partial Inspection No Violations Noted
1942757 Primary Facility 01/06/2011 Drilling/Alteration No Violations Noted Rig set up, and preparing to begin drilling.
1944096 Primary Facility 01/20/2011 Routine/Partial Inspection No Violations Noted
1947979 Primary Facility 02/04/2011 Routine/Partial Inspection No Violations Noted
1951034 Primary Facility 02/15/2011 Routine/Partial Inspection No Violations Noted
1953945 Primary Facility 02/28/2011 Routine/Partial Inspection No Violations Noted
1955816 Primary Facility 03/08/2011 Routine/Complete Inspection No Violations Noted
1957113 Primary Facility 03/14/2011 Routine/Complete Inspection No Violations Noted
1962235 Primary Facility 03/31/2011 Routine/Partial Inspection No Violations Noted
1966222 Primary Facility 04/13/2011 Routine/Partial Inspection No Violations Noted
1970592 Primary Facility 04/29/2011 Routine/Partial Inspection No Violations Noted
1972031 Primary Facility 05/09/2011 Routine/Complete Inspection No Violations Noted
2027932 Primary Facility 12/06/2011 Routine/Complete Inspection No Violations Noted
2039279 Primary Facility 01/03/2012 Routine/Complete Inspection No Violations Noted
2062135 Primary Facility 03/15/2012 Routine/Complete Inspection No Violations Noted
2105442 Primary Facility 09/19/2012 Routine/Complete Inspection No Violations Noted
2190410 Primary Facility 08/08/2013 Routine/Complete Inspection No Violations Noted
2553224 Primary Facility 2017-01-09 Routine/Complete Inspection No Violations Noted
2695844 Primary Facility 2018-02-13 Routine/Complete Inspection No Violations Noted The weather is 36 Deg. F and sunny at time of inspection. Routine inspection of Alta Resources, LLC., C.O.P. TRACT 285B Pad, Well #1011H, on February 13, 2018.

There are 6 producing wells on this pad. Both annulus vents are closed and not vented at time of inspection. Production by intermediate (5-1/2¿ X 9-5/8¿) annulus vent is shut in to pressure monitor, with pressure reading ¿ 0 PSI, production casing annulus vent is also shut in to pressure monitor, with pressure reading -231 PSI. The production xmas tree top pressure on the 2-3/8¿ tubing is 176 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2760263 Primary Facility 2018-07-25 Routine/Complete Inspection No Violations Noted On July 25, 2018, Department representative Sue Herzing conducted a routine site inspection at COP TRACT 285 PAD B. The site sign, emergency response plan, monthly tank maintenance log, ESCGP, weekly E&S inspection log, and drilling permits were onsite for review. No E&S issues were observed during the time of my inspection. A PCSM infiltration berm consisting of a 24" seeded compost sock has been installed according to PCSM plans. This compost infiltration berm is well vegetated and appears to be functioning as design. The pad remains the original footprint size of 400' x 400'. According to the operators PCSM plans, this the smallest "in production" workable footprint size. The following remain in place along the access road and appear to be functioning as design: rock lined roadside ditches and ditch relief culverts with rip-rap aprons. Overall, the site is stable and well vegetated exceeding 70% uniform, perennial, vegetative cover.

There are a total of 6 producing wells located on this well pad. All wel

2845174 Primary Facility 2019-02-26 Routine/Complete Inspection No Violations Noted Inspection was in response to a deficient tank notification from ARD received on 2/25/19. A hole was discovered above the water level, and the tank was taken out of service and pumped down. I immediately noted several rust streaks on the #1 tank, and also noted that the #3 tank had similar rust streaks; I recommend that the #3 tank be monitored carefully for integrity. 3-4" of ice was present in the production tank containment; although the capacity of the containment did not appear to be significantly reduced, I recommend that when conditions warrant that this containment be vacced out. The GPU containment was full to the top of the berm with ice; I recommend that this be vacced as soon as reasonably possible.
2855401 Primary Facility 2019-03-18 Routine/Complete Inspection No Violations Noted Weather was 20 degrees and sunny. There were no Alta representatives on location at time of inspection. Well was in production. Well had digital pressure monitoring equipment. Well had 144 PSI on the production tubing. Well had a 0 to 6k PSI analog pressure gauge reading approximately 100 PSI on the production casing. Well had 2 visible annulus vents plumbed to surface. 1' annulus vent had a 0 to 600 PSI analog pressure gauge reading approximately 0 PSI. 2' annulus vent had no gauge to read pressure. 0% combustible gas was detected anywhere around the well. No violations at time of inspection.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/04/2011 04/04/2011 8081.00 5,385,412.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LCA-1 Solvent Halliburton Energy Services Solvent Paraffinic solvent 100.00 2979157.86
FDP-S944-09 Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00
BE-9M Halliburton Energy Services Biocide Methanol 67-56-1 30.00 771703.69
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 310364.55
Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 7410.00
WG-36 GELLING AGENT Halliburton Energy Services Gelling Agent Guar gum 9000-30-0 100.00 2209116.00
Acid, Hydrochloric (7.5) Halliburton Energy Services Solvent Hydrochloric acid 7647-01-0 7.50 2520.65
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 103454.85
SP Halliburton Energy Services Gel Breaker Sodium persulfate 7775-27-1 100.00 1760991.15
GBW-30 BREAKER Halliburton Energy Services Gelling Agent Hemicellulase enzyme 9012-54-8 15.00 8100.00
Carbohydrates 95.00 1170.00
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100.00 587326000.00
CS-39 Halliburton Energy Services Clay Stabilizer Proprietary inorganic chemical 20.00 4468736.79
Proprietary poly electrolyte 40.00 1489578.93
Chloride 16887-00-6 30.00
Water 7732-18-5 60.00 2234368.39
79085.02
HAI-OS ACID INHIBITOR Halliburton Energy Services Corrosion Inhibitor Methanol 67-56-1 60.00 102938.80
Propargyl alcohol 107-19-7 10.00 15123.94

For data sources see[7]

References