If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-039-25192 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.525333,"lon":-80.412042,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Crawford | |
Municipality: South Shenango Township | |
Operator Name: BOBCAT WELL & PIPELINE LLC | |
Well Pad ID: | |
Farm/Lease Name: POTASE 6 | |
License Status: Plugged OG Well | |
Spud Date: 02/07/2008 | |
Permit Date: 8/10/2007 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.525333 | |
Longitude: -80.412042 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | D & L ENERGY INC | 1,504.00 | 150 | 0.00 | 0.00 | ||
2010 | D & L ENERGY INC | 1,261.40 | 365 | 0.00 | 0.00 | ||
2011 | D & L ENERGY INC | 662.60 | 365 | 0.00 | 0.00 | ||
2012 | D & L ENERGY INC | 593.80 | 365 | 0.00 | 0.00 | ||
2013 | D & L ENERGY INC | 108.20 | 5 | 0.01 | 5 | 0.00 | |
2015 | BOBCAT WELL & PIPELINE LLC | 28.78 | 10 | 0.00 | 0.00 | ||
2016 | 0.00 | 0.00 | 0.00 | ||||
2017 | BOBCAT WELL & PIPELINE LLC | 0.00 | 11.67 | 1 | 0.00 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2008-A00 | Brine | 219.00 Bbl | ||
2010-A00 | Produced Fluid (in Barrels) | 14.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-007-22038 |
2010-A00 | Produced Fluid (in Barrels) | 65.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2011-A00 | Produced Fluid (in Barrels) | 88.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 |
2012-A00 | Produced Fluid (in Barrels) | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
2017-A00 | Produced Fluid (in Barrels) RWC 802 | 81.00 Bbl | ROAD SPREADING |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1684218 | Primary Facility | 02/11/2008 | Drilling/Alteration | No Violations Noted | |
1829760 | Primary Facility | 09/22/2009 | Routine/Complete Inspection | No Violations Noted | |
1963940 | Primary Facility | 04/06/2011 | Routine/Complete Inspection | No Violations Noted | Upon inspection today I found the well shut-in with the annulus open. The production equipment consisted of one green steel stock tank, one white poly stock tank, and heater/ dryer unit all inside the dike. The production chart had only a blue line indicating gas line pressure. no violations. |
2125085 | Primary Facility | 12/20/2012 | Routine/Complete Inspection | No Violations Noted | |
2125096 | Primary Facility | 12/20/2012 | Routine/Complete Inspection | No Violations Noted | |
2203894 | Primary Facility | 09/12/2013 | Routine/Complete Inspection | No Violations Noted | |
2341850 | Primary Facility | 02/06/2015 | Routine/Complete Inspection | No Violations Noted | |
2393588 | Primary Facility | 06/19/2015 | Routine/Complete Inspection | No Violations Noted | |
2546342 | Primary Facility | 2016-12-21 | Administrative/File Review | No Violations Noted | production report review |
2656529 | Primary Facility | 2017-11-03 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Inspected location, plugging crew on location getting ready to set plug, set first plug from 4634' to 4234' (Medina plug) with 30 sacks of cement, ripped casing at top of salt 3565', pulled up to 3477' and going to cement to 2959' with 149 sacks of cement, crew will then pull up to 637' and set surface casing plug with 46 sacks of cement. |
For data sources see[6]