X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-039-25192

Well Details

Well ID: 37-039-25192
Loading map...
Country: United States
State: Pennsylvania
County: Crawford
Municipality: South Shenango Township
Operator Name: BOBCAT WELL & PIPELINE LLC
Well Pad ID:
Farm/Lease Name: POTASE 6
License Status: Plugged OG Well
Spud Date: 02/07/2008
Permit Date: 8/10/2007
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.525333
Longitude: -80.412042

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 D & L ENERGY INC 1,504.00 150 0.00 0.00
2010 D & L ENERGY INC 1,261.40 365 0.00 0.00
2011 D & L ENERGY INC 662.60 365 0.00 0.00
2012 D & L ENERGY INC 593.80 365 0.00 0.00
2013 D & L ENERGY INC 108.20 5 0.01 5 0.00
2015 BOBCAT WELL & PIPELINE LLC 28.78 10 0.00 0.00
2016 0.00 0.00 0.00
2017 BOBCAT WELL & PIPELINE LLC 0.00 11.67 1 0.00

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2008-A00 Brine 219.00 Bbl
2010-A00 Produced Fluid (in Barrels) 14.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-22038
2010-A00 Produced Fluid (in Barrels) 65.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2011-A00 Produced Fluid (in Barrels) 88.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2012-A00 Produced Fluid (in Barrels) 110.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2017-A00 Produced Fluid (in Barrels) RWC 802 81.00 Bbl ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1684218 Primary Facility 02/11/2008 Drilling/Alteration No Violations Noted
1829760 Primary Facility 09/22/2009 Routine/Complete Inspection No Violations Noted
1963940 Primary Facility 04/06/2011 Routine/Complete Inspection No Violations Noted Upon inspection today I found the well shut-in with the annulus open. The production equipment consisted of one green steel stock tank, one white poly stock tank, and heater/ dryer unit all inside the dike. The production chart had only a blue line indicating gas line pressure. no violations.
2125085 Primary Facility 12/20/2012 Routine/Complete Inspection No Violations Noted
2125096 Primary Facility 12/20/2012 Routine/Complete Inspection No Violations Noted
2203894 Primary Facility 09/12/2013 Routine/Complete Inspection No Violations Noted
2341850 Primary Facility 02/06/2015 Routine/Complete Inspection No Violations Noted
2393588 Primary Facility 06/19/2015 Routine/Complete Inspection No Violations Noted
2546342 Primary Facility 2016-12-21 Administrative/File Review No Violations Noted production report review
2656529 Primary Facility 2017-11-03 Plugging(Includes Plugged/Mined Through) No Violations Noted Inspected location, plugging crew on location getting ready to set plug, set first plug from 4634' to 4234' (Medina plug) with 30 sacks of cement, ripped casing at top of salt 3565', pulled up to 3477' and going to cement to 2959' with 149 sacks of cement, crew will then pull up to 637' and set surface casing plug with 46 sacks of cement.

For data sources see[6]

References