If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-039-25409 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.758366,"lon":-80.139332,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Crawford | |
Municipality: Hayfield Township | |
Operator Name: BOBCAT WELL & PIPELINE LLC | |
Well Pad ID: | |
Farm/Lease Name: FERTIG 1 | |
License Status: Active | |
Spud Date: 12/11/2008 | |
Permit Date: 4/8/2008 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.758366 | |
Longitude: -80.139332 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | D & L ENERGY INC | 5,713.50 | 365 | 0.00 | 0.00 | ||
2011 | D & L ENERGY INC | 2,136.30 | 365 | 0.00 | 0.00 | ||
2012 | D & L ENERGY INC | 1,170.10 | 365 | 0.00 | 0.00 | ||
2013 | D & L ENERGY INC | 197.20 | 77 | 0.01 | 77 | 0.00 | |
2015 | BOBCAT WELL & PIPELINE LLC | 176.88 | 27 | 0.00 | 0.00 | ||
2016 | 0.00 | 0.00 | 0.00 | ||||
2017 | BOBCAT WELL & PIPELINE LLC | 0.00 | 37.83 | 1 | 0.00 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2010-A00 | Produced Fluid (in Barrels) | 386.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-007-22038 |
2010-A00 | Produced Fluid (in Barrels) | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23584 |
2011-A00 | Produced Fluid (in Barrels) | 46.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 |
2011-A00 | Produced Fluid (in Barrels) | 79.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
2011-A00 | Produced Fluid (in Barrels) | 69.00 Bbl | INJECTION DISPOSAL WELL | 34-007-22038 |
2012-A00 | Produced Fluid (in Barrels) | 236.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
2017-A00 | Produced Fluid (in Barrels) RWC 802 | 2.00 Bbl | ROAD SPREADING |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1755683 | Primary Facility | 12/12/2008 | Drilling/Alteration | No Violations Noted | |
1756743 | Primary Facility | 12/17/2008 | Drilling/Alteration | No Violations Noted | |
2186592 | Primary Facility | 07/17/2013 | Routine/Complete Inspection | No Violations Noted | |
2187197 | Primary Facility | 07/26/2013 | Routine/Partial Inspection | No Violations Noted | |
2322842 | Primary Facility | 11/18/2014 | Routine/Complete Inspection | No Violations Noted | |
2546635 | Primary Facility | 2016-12-22 | Administrative/File Review | No Violations Noted | production report review |
For data sources see[6]