If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-081-20180 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.272247,"lon":-76.636592,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Penn Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 148314 | |
Farm/Lease Name: FALK UNIT 2H | |
License Status: Active | |
Spud Date: 09/22/2009 | |
Permit Date: 9/8/2009 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.272247 | |
Longitude: -76.636592 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | 0.00 | 0.00 | 0.00 | ||||
2010 | CHIEF OIL & GAS LLC | 500,438.50 | 145 | 0.00 | 0 | 0.00 | 0 |
2011 | CHIEF OIL & GAS LLC | 652,323.00 | 305 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 745,004.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 548,895.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 465,597.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 349,288.00 | 309 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 172,772.00 | 223 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 11,541.00 | 144 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 135,708.00 | 201 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 18,950.00 | 34 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2009-A00 | Drilling | 1,514.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0008451 |
2010-S02 | Fracing Fluid Waste (in Barrels) | 341.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010-S02 | Produced Fluid (in Barrels) | 623.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2010-S02 | Produced Fluid (in Barrels) | 1,902.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010-S02 | Produced Fluid (in Barrels) | 842.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2010-S02 | Produced Fluid (in Barrels) | 260.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2010-S02 | Produced Fluid (in Barrels) | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2011-S01 | Fracing Fluid Waste (in Barrels) | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011-S01 | Fracing Fluid Waste (in Barrels) | 131.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011-S01 | Produced Fluid (in Barrels) | 3,560.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011-S01 | Produced Fluid (in Barrels) | 119.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011-S01 | Produced Fluid (in Barrels) | 833.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011-S01 | Produced Fluid (in Barrels) | 238.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAS2D205BCLE |
2011-S01 | Produced Fluid (in Barrels) | 1,190.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011-S01 | Produced Fluid (in Barrels) | 357.00 Bbl | INJECTION DISPOSAL WELL | PAS2D902BCLE |
2011-S01 | Produced Fluid (in Barrels) | 845.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S02 | Produced Fluid (in Barrels) | 892.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAS2D205BCLE |
2011-S02 | Produced Fluid (in Barrels) | 6,877.41 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011-S02 | Produced Fluid (in Barrels) | 595.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2012-S01 | Drill Cuttings (in Tons) | 33.94 Tons | LANDFILL | 301358 |
2012-S01 | Fracturing Fluid Waste (in Tons) | 407.67 Tons | LANDFILL | 301358 |
2012-S01 | Produced Fluid (in Barrels) | 6,317.35 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012-S02 | Produced Fluid (in Barrels) | 3,254.65 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012-S02 | Produced Fluid (in Barrels) | 273.80 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S01 | Produced Fluid (in Barrels) | 2,540.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2013-S02 | Produced Fluid (in Barrels) | 87.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC024 |
2013-S02 | Produced Fluid (in Barrels) | 469.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2013-S02 | Produced Fluid (in Barrels) | 228.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC009 |
2013-S02 | Produced Fluid (in Barrels) | 1,233.03 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014-S01 | Produced Fluid (in Barrels) | 493.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014-S01 | Produced Fluid (in Barrels) | 11.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014-S01 | Produced Fluid (in Barrels) | 442.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014-S01 | Produced Fluid (in Barrels) | 219.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC024 |
2014-S01 | Produced Fluid (in Barrels) | 21.90 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2014-S02 | Produced Fluid (in Barrels) | 331.40 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2014-S02 | Produced Fluid (in Barrels) | 212.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014-S02 | Produced Fluid (in Barrels) | 22.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014-S02 | Produced Fluid (in Barrels) | 225.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014-S02 | Produced Fluid (in Barrels) | 121.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S02 | Produced Fluid (in Barrels) | 119.50 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2015-S01 | Produced Fluid (in Barrels) | 486.50 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015-S01 | Produced Fluid (in Barrels) | 11.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Produced Fluid (in Barrels) | 537.40 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015-S02 | Produced Fluid (in Barrels) | 36.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC009 |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 693.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 522.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 57.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 35.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 70.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 27.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 10.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 22.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 106.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 42.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 53.50 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 60.50 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 40.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 40.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 66.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 135.50 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 146.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 83.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 75.80 Bbl | REUSE (AT WELL PAD) | |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 152.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 109.50 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 161.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 106.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 43.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 32.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 161.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 124.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 62.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 10.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1832347 | Primary Facility | 10/01/2009 | Drilling/Alteration | No Violations Noted | moving rig from falk unit #1h should spud oct 4-5 th |
1871302 | Primary Facility | 03/22/2010 | Routine/Complete Inspection | No Violations Noted | |
1884846 | Primary Facility | 05/17/2010 | Routine/Complete Inspection | No Violations Noted | |
1899641 | Primary Facility | 07/21/2010 | Routine/Partial Inspection | Violation(s) Noted | No well tag |
1929488 | Primary Facility | 11/15/2010 | Follow-up Inspection | No Violations Noted | |
1942090 | Primary Facility | 01/06/2011 | Routine/Complete Inspection | No Violations Noted | |
1965777 | Primary Facility | 04/13/2011 | Routine/Complete Inspection | No Violations Noted | |
2051031 | Primary Facility | 03/15/2012 | Routine/Complete Inspection | No Violations Noted | |
2051033 | Primary Facility | 03/15/2012 | Routine/Complete Inspection | No Violations Noted | |
2056684 | Primary Facility | 04/02/2012 | Routine/Partial Inspection | No Violations Noted | |
2069507 | Primary Facility | 05/18/2012 | Routine/Complete Inspection | No Violations Noted | |
2072681 | Primary Facility | 06/01/2012 | Drilling/Alteration | No Violations Noted | |
2076719 | Primary Facility | 06/12/2012 | Routine/Complete Inspection | No Violations Noted | |
2092493 | Primary Facility | 08/15/2012 | Routine/Complete Inspection | No Violations Noted | |
2100911 | Primary Facility | 09/13/2012 | Routine/Complete Inspection | No Violations Noted | |
2436745 | Primary Facility | 12/30/2015 | Routine/Complete Inspection | No Violations Noted | Arrived @ 11:40. Weather: foggy, cloudy, some fine drizzle. Five wells, formerly in production, were shut-in. Lease tender Bobby Hamel was onsite pumping rain water out of the containment around the produced water tank. All well cellars were filled with gravel. There were two open annular vents at each well. The 13-3/8” x 9-5/8” was vented with a 1” pipe. The 9-5/8” x 5-1/2” annulus was vented with a 2” pipe. The annuli were monitored with an Altair 5X gas meter calibrated on 12/28/15. |
2543931 | Primary Facility | 2016-12-08 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 12/8/2016. I entered the location at 10:06 and began the inspection. At the time of the inspection, the Falk Unit 1H (081-20144), 2H (081-20180), 3H (081-20205), 4H (20209) and 5H(081-20210)wells were in production. The well pad area was relatively well vegetated but some erosion was noted along the access road and one of the basins onsite was had a fair amount of standing water. The well site has not been restored and the Well Site Compliance Information Request reply (submitted 9/21/2015) says an ESCGP-2 was to be submitted in the fall of 2015. The well pad remains at its original size and the site currently does not conform to the permitted restoration plan. The original E&S permit has been expired since 10/16/2014.
The Department considers a well site to be restored under Section 3216(c) of the 2012 Oil and Gas Act when the oil or gas owners or operators meet the following: 1. All permanent post construction stormwater control features as identified in the Post Construction |
2774006 | Primary Facility | 2018-09-12 | Routine/Complete Inspection | No Violations Noted | Five wells staged for production phase. Five each water separators. The 2H well is using a sand separator. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. Methanol tank in use on 2H well. No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1899641 | 591556 | 07/21/2010 | 11/15/2010 | 201TAG - Failure to install, in a permanent manner, the permit number on a completed well | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
591556 | 261031 | NOV - Notice of Violation | Comply/Closed | 08/31/2011 |
For data sources see[6]