If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20049 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.604097,"lon":-76.005583,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Washington Township | |
Operator Name: BKV OPR LLC | |
Well Pad ID: 145198 | |
Farm/Lease Name: MIRABELLI UNIT MIRABELL 1 1H | |
License Status: Active | |
Spud Date: 08/31/2010 | |
Permit Date: 7/22/2010 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.604097 | |
Longitude: -76.005583 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CITRUS ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CITRUS ENERGY CORP | 984,054.00 | 74 | 0.00 | 0 | 0.00 | 0 |
2012 | CITRUS ENERGY CORP | 3,243,999.00 | 290 | 0.00 | 0 | 0.00 | 0 |
2013 | CITRUS ENERGY CORP | 1,357,045.00 | 263 | 0.00 | 0 | 0.00 | 0 |
2014 | CITRUS ENERGY CORP | 1,264,695.78 | 336 | 0.00 | 0 | 0.00 | 0 |
2015 | WARREN E & P INC | 894,080.28 | 268 | 0.00 | 0 | 0.00 | 0 |
2016 | WARREN E & P INC | 713,973.58 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | WARREN E & P INC | 571,617.69 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | WARREN E & P INC | 532,156.43 | 360 | 0.00 | 0 | 0.00 | 0 |
2019 | BKV OPR LLC | 409.39 | 1 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2010-S02 | Drill Cuttings (in Tons) | 1,004.00 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2010-S02 | Produced Fluid (in Barrels) | 704.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2011-S02 | Drill Cuttings (in Tons) | 110.00 Tons | LANDFILL | 132310 |
2011-S02 | Fracing Fluid Waste (in Barrels) | 7,115.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S01 | Produced Fluid (in Barrels) | 755.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Produced Fluid (in Barrels) | 28.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S01 | Produced Fluid (in Barrels) | 224.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S02 | Produced Fluid (in Barrels) | 255.44 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2015-S01 | Produced Fluid (in Barrels) | 125.30 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2015-S02 | Produced Fluid (in Barrels) | 428.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015-S02 | Produced Fluid (in Barrels) | 127.30 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016-S01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 75.66 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016-S01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 14.59 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016-S01 | Other Oil & Gas Wastes (in Tons) RWC 899 | 10.82 Tons | LANDFILL | THR029 |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 114.23 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 36.22 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016-S01 | Synthetic Liner Materials (in Tons) RWC 806 | 0.10 Tons | LANDFILL | THR029 |
2016-S02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 120.72 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016-S02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 22.40 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016-S02 | Other Oil & Gas Wastes (in Tons) RWC 899 | 2.40 Tons | LANDFILL | THR029 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 87.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 28.82 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 21.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 105.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 37.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 116.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 62.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 22.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 44.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 361.20 Bbl | REUSE (AT WELL PAD) | |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 44.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 45.24 Bbl | REUSE (AT WELL PAD) | |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 196.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 22.54 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 115.60 Bbl | REUSE (AT WELL PAD) | |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 68.28 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 22.54 Bbl | REUSE (AT WELL PAD) | |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 22.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 36.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 143.78 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 22.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 112.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M05 | Waste Water Treatment Sludge (in Tons) RWC 804 | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 80.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 9.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 67.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 67.20 Bbl | REUSE (AT WELL PAD) | |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 22.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 67.20 Bbl | REUSE (AT WELL PAD) | |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 88.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 21.00 Bbl | REUSE (AT WELL PAD) | |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 67.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M11 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 150.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 105.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 21.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019-M01 | Other Oil & Gas Wastes (in Tons) RWC 899 | 20.63 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 73.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 82.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019-M02 | Synthetic Liner Materials (in Tons) RWC 806 | 3.72 Tons | LANDFILL | 101247 |
2019-M03 | Synthetic Liner Materials (in Tons) RWC 806 | 0.91 Tons | LANDFILL | 101247 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1911071 | Primary Facility | 09/07/2010 | Drilling/Alteration | No Violations Noted | |
1917594 | Primary Facility | 10/04/2010 | Drilling/Alteration | No Violations Noted | RDMO Rig, moving rig back to Ruark. Location looked fine. No violation noted. |
1918705 | Primary Facility | 10/04/2010 | Drilling/Alteration | No Violations Noted | Patterson Rig 61 Talked to Jacob (toolpusher w/ Patterson) RDMO MIRU to Ruark 2H near us6 and us87. Location is contained and in good shape. Big move scheduled for 10/5/2010. Mixing drill cutting w/ lime. It was rainy and water was being pumped off location into tanks and clean up crew was present. Derrick was down. Drilling the well was said to have gone smoothly. |
1960726 | Primary Facility | 03/21/2011 | Routine/Complete Inspection | No Violations Noted | no well tag, talked to Rick fields (601)315-3580 on 3-29-2011 He will take care of it and get back to me. |
1986274 | Primary Facility | 07/07/2011 | Routine/Complete Inspection | Violation(s) Noted | Water-based Drill Cuttings spilled from tank during solidification, escaped all containment measures, and impacted ground outside of well pad. Estimated release to be less than 50 gallons. Area impacted estimated to be 40 feet (approximate length of two tanks) by 6 feet. |
1990960 | Primary Facility | 07/28/2011 | Follow-up Inspection | No Violations Noted | |
2038002 | Primary Facility | 01/30/2012 | Routine/Complete Inspection | No Violations Noted | |
2038160 | Primary Facility | 01/31/2012 | Administrative/File Review | No Violations Noted | Reviewed inspection reports for 10/27 thru 11/21/2011. |
2205965 | Primary Facility | 09/10/2013 | Routine/Complete Inspection | No Violations Noted | Specifics associated with this inspection can be referred to in the Mirabelli Unit Mirabelli 1 1H inspection report. Permit number is 131-20174. E-facts identification number is 2205880. |
2206009 | Primary Facility | 09/10/2013 | Routine/Complete Inspection | No Violations Noted | Specifics associated with this inspection can be referred to in the Mirabelli Unit Mirabelli 1 1H inspection report. Permit number is 131-20174. E-facts identification number is 2205880. |
2335707 | Primary Facility | 01/14/2015 | Drilling/Alteration | No Violations Noted | |
2344365 | Primary Facility | 02/04/2015 | Routine/Complete Inspection | No Violations Noted | H&P Rig #284 is the active drilling rig on the location. I met with Jacob Oettel, company man, of Warren E&P. Mr. Oettel stated that drilling procedures for the Mirabelli Unit 3H well have been just recently completed. The well has been drilled to total depth, which is around (12,800) feet. The Mirabelli 3H and the Mirabelli Keystone 1H wells have been drilled to a depth of (2,032) feet. The surface and intermediate casing has been cemented on each of these wells. It is not clear as to when Warren will return to the location to drill the wells to total depth. |
2429728 | Primary Facility | 12/03/2015 | Routine/Complete Inspection | No Violations Noted | |
2474054 | Primary Facility | 2016-04-08 | Routine/Complete Inspection | No Violations Noted | |
2502856 | Primary Facility | 2016-07-20 | Administrative/File Review | In Compliance with Policy | |
2849589 | Primary Facility | 2019-02-04 | Drilling/Alteration | No Violations Noted | I arrived at the site at 12:15. I was accompanied by Casey Baldwin, DEP O&G WQS out of the Scranton District Office. The weather conditions are partly cloudy skies, light winds, and mild with temperatures in the low to mid 50's. Precision Drilling Rig #532 is on the location. BKV submitted a Drilling Resumption After Break of 30 days or more Notification to the Department on 1/29/19. The notice indicated BKV would resume drillng of the Keystone Unit Mirabelli 1 Keystone 1H well at 6AM on 2/1/19. The surface and intermediate sections of this well, and the Keystone Unit Mirabelli 1-3H were drilled and cemented in 2015.
We met Kevin Brady, Hydrologist, Environmental Scientist, Wetland Delineator (WPIT) of Whitetail Environmental Services, LLC, Gary Titus, site company man, consultant of BKV, Larry Gerard, Completions Superintendent, and Gary King, Drilling Superintendent, both consultants of BKV. The current drilling depth on the Mirabelli Keystone 1H well is (6,102) feet. BKV provided the following d |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1986274 | 614944 | 07/07/2011 | 07/28/2011 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety |
For data sources see[6]