If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-131-20194 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.597706,"lon":-75.985939,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Wyoming | |
Municipality: Washington Township | |
Operator Name: CARRIZO (MARCELLUS) LLC | |
Well Pad ID: 145304 | |
Farm/Lease Name: YARASAVAGE 5H | |
License Status: Active | |
Spud Date: 08/05/2011 | |
Permit Date: 7/13/2011 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.597706 | |
Longitude: -75.985939 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CARRIZO (MARCELLUS) LLC | 215,452.00 | 126 | 0.00 | 0 | 0.00 | 0 |
2014 | CARRIZO (MARCELLUS) LLC | 1,721,874.32 | 341 | 0.00 | 0 | 0.00 | 0 |
2015 | CARRIZO (MARCELLUS) LLC | 468,761.31 | 111 | 0.00 | 0 | 0.00 | 0 |
2016 | CARRIZO (MARCELLUS) LLC | 72,632.07 | 19 | 0.00 | 0 | 0.00 | 0 |
2017 | CARRIZO (MARCELLUS) LLC | 717,778.31 | 186 | 0.00 | 0 | 0.00 | 0 |
2018 | CARRIZO (MARCELLUS) LLC | 879,614.95 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CARRIZO (MARCELLUS) LLC | 146,223.27 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2012-S01 | Drill Cuttings (in Tons) | 1,099.00 Tons | LANDFILL | THR029 |
2013-S01 | Produced Fluid (in Barrels) | 4,028.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Produced Fluid (in Barrels) | 2,798.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2014-S01 | Produced Fluid (in Barrels) | 57.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2014-S02 | Produced Fluid (in Barrels) | 212.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR119 |
2014-S02 | Produced Fluid (in Barrels) | 6,025.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014-S02 | Produced Fluid (in Barrels) | 6,025.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014-S02 | Produced Fluid (in Barrels) | 194.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M01 | Produced Fluid (in Barrels) | 1.07 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2015-M02 | Produced Fluid (in Barrels) | 3.21 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2015-M03 | Produced Fluid (in Barrels) | 1.02 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2015-M03 | Produced Fluid (in Barrels) | 6.06 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M04 | Produced Fluid (in Barrels) | 109.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M05 | Basic Sediment (in Barrels) | 50.00 Bbl | LANDFILL | THR029 |
2015-M05 | Produced Fluid (in Barrels) | 22.92 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2015-M05 | Produced Fluid (in Barrels) | 56.28 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M06 | Produced Fluid (in Barrels) | 24.45 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2015-M06 | Produced Fluid (in Barrels) | 45.22 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M07 | Produced Fluid (in Barrels) | 27.77 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016-M04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 9.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE003 |
2016-M05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 9.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016-M12 | Produced Fluid (in Barrels) RWC 802 | 8.04 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 85.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 35.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 33.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 34.97 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 52.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 1.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 1.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 50.04 Bbl | REUSE (AT WELL PAD) | |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 52.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 17.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | REUSE (AT WELL PAD) | |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 17.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2004551 | Primary Facility | 09/22/2011 | Routine/Complete Inspection | No Violations Noted | Getting ready to move in rig. Putting down containment, moving in tanks,etc. Will drill the 7H first. |
2014158 | Primary Facility | 10/25/2011 | Drilling/Alteration | No Violations Noted | Northeast Ener. Rig 10 Comp. Man - Don Hackford |
2036977 | Primary Facility | 01/25/2012 | Routine/Complete Inspection | No Violations Noted | |
2049576 | Primary Facility | 02/27/2012 | Drilling/Alteration | No Violations Noted | NE Energy Rig 10, Comp. Man - Wayne Simon, drilling at 5458' |
2064963 | Primary Facility | 04/27/2012 | Drilling/Alteration | No Violations Noted | Nabors M 61 Comp.Man - Skip McClelland, checked drillers log, @ 9390' |
2155781 | Primary Facility | 04/08/2013 | Follow-up Inspection | No Violations Noted | Rigged up wellhead for fracing, but decided to use a different head. Set 2 BP's at 5000+ and 6000+'. |
2256570 | Primary Facility | 03/20/2014 | Follow-up Inspection | No Violations Noted | Test on 5H began this morning at 1015 hours (72 hour shut-in unless 150 psi comes first) |
2256577 | Primary Facility | 03/21/2014 | Follow-up Inspection | No Violations Noted | 72 hour shut in test: annuli were shut in at 1015 hours on 3/20/2014 |
2382841 | Primary Facility | 06/24/2015 | Routine/Partial Inspection | No Violations Noted | |
2490764 | Primary Facility | 2016-06-01 | Routine/Complete Inspection | No Violations Noted | |
2545127 | Primary Facility | 2016-12-15 | Site Restoration | No Violations Noted |
For data sources see[6]