If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24304 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.733633506,"lon":-81.18003079,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Wayne | |
Operator Name: P P & G OIL | |
Well Pad ID: | |
Farm/Lease Name: CHARLOTTE MCCOY | |
License Status: Producing | |
License Date: 2011-08-23 | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 39.733633506 | |
Longitude: -81.18003079 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | P P & G OIL | 3976 | 216 | 0 |
2012 | P P & G OIL | 5089 | 303 | 366 |
2013 | P P & G OIL | 3829 | 171 | 365 |
2014 | P P & G OIL | 3140 | 95 | 365 |
2015 | P P & G OIL | 3046 | 0 | 365 |
2016 | P P & G OIL | 3074 | 123 | 365 |
2017 | P P & G OIL | 2937 | 120 | 365 |
2018 | P P & G OIL | 2375 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | P P & G OIL | Brine | 26 | |
2012 | P P & G OIL | Brine | 19 | 366 |
2013 | P P & G OIL | Brine | 22 | 365 |
2014 | P P & G OIL | Brine | 0 | 365 |
2015 | P P & G OIL | Brine | 0 | 365 |
2016 | P P & G OIL | Brine | 0 | 365 |
2017 | P P & G OIL | Brine | 17 | 365 |
2018 | P P & G OIL | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0535497009 | 2018-01-25 | Production Wells | No Violations | On this day, I found the well equipped with 4.5 inch diameter casing with the valve open and 2 inch diameter tubing with the valve open. It is produced by means of a pumping unit with a gas engine, tubing, and rods. There are (2) 100 barrel steel tanks, a drip tank, vertical separator, and an orifice meter all contained within an earthen dike. The tank is properly identified and the production records are current. Vegetation needs to be established along the right-of-way to the wellhead. Erosional ditches have occurred along the path and need to be addressed. Pictures were taken during the inspection. The company will be contacted about the issue. |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-08-23 | Proposed Formations:DEVONIAN SHALE, Issued Date:8/23/2011, Expired Date:8/22/2013 12:00:00 PM, Drilling unit acres:30.73, Proposed Well Type:OG, Proposed Well Class:POOL |
Construction Permit Expires | 2013-08-22 | |
Record Last Modified | 2014-01-09 |
For data sources see[1]