X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24358

Well Details

Well ID: 34-111-24358
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Green
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: 605
Farm/Lease Name: TIPPENS
License Status: Plugged Back
License Date: 2012-12-06
Spud Date: 2012-08-31
Spud Drilling Contractor: H A D INC
Final Drill Date: 2012-09-28
Well Total Depth:
Configuration: Vertical
Latitude: 39.677053697
Longitude: -81.02602240

For data sources see[1]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-03-28 846 5993 846
2012-12-06 5637 5639 12

For data sources see[1]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ECLIPSE RESOURCES I LP Brine 0 4
2014 ECLIPSE RESOURCES I LP Brine 9444 354
2015 ECLIPSE RESOURCES I LP Brine 1899 362
2016 ECLIPSE RESOURCES I LP Brine 981 360
2017 ECLIPSE RESOURCES I LP Brine 939 363
2018 ECLIPSE RESOURCES I LP Brine 327 361
2019 ECLIPSE RESOURCES I LP Brine 0 89

For data sources see[1][2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0033745968 2012-10-16 Completion Testing No Violations The well is under going a dip test. The well has been drilled to the marcellus and cemented in place. than there were 6 holes shot in casing and a mini frac was performed. 20 barrel of fluid was pumped and broke down the formation. The well was being under test for measuring pressures for 14 days. Stoarick and I and Melissa and Billy measured pressure from back side from bottom to top. All were at 0 psi.
0056451807 2018-03-08 Production Wells No Violations Status check inspection found the well pad equipped with a casing and tubing well head assembly with (2) primary master valves on the tubing head assembly followed by an emergency shut down valve. The production valves are in the open position. There are multiple emergency shut down control points on location including the well pad entry point outside the gated and fenced well pad area. On location is a production facility consisting of a total of (5) production tanks of steel construction design all situated inside a polymer lined steel containment dike area. On this day I contacted the company production supervisor and discussed annular pressure monitoring.
0089651960 2012-10-15 Completion Testing No Violations Inspector checked the surface casing for pressure by attaching His pressure gauge to the 2 bull plug on the casing valve, no measurable pressure was noted. Well did have a noticeable leak coming from the opposite casing plug on 10/13/12.
0143117441 2012-09-25 Drill / Deepen / Reopen No Violations Initial violation pertaining to well bore casing design plan guidelines issued by the Division not being followed has been resolved by am mending the permit conditions to allow the company Eclipse Resources to continue drilling to a depth not to exceed 150 below the Marcellus for the purpose of doing strata graphic tests only.
0283212894 2012-09-10 Production Wells No Violations On the day of my inspection HAD was running 18.375 casing and Universal will be cementing. No violation noted.
0313468568 2012-09-25 Drill / Deepen / Reopen No Violations On site inspection found company drilling @ 3713 using @ 8.750 bit. Company is drilling under special amended permit conditions allowing them to proceed to the Utica and no further for the intended purpose of a strata test only, well is not to be put in production or completed without first setting 9.625 string through the Berea. Inspector also advised company man Ron Giles to erect a protect a protective barrier around open cellar for the other well on site before someone falls into it.
0322557327 2012-09-19 Drill / Deepen / Reopen No Violations HAD Drilling was nippling up BOP stack and accumulator. I met with Ron Giles and explained to place a grate over the tin horn. Location is very compact and do not need an individual to fall in . I talked to tool pusher of drilling rig . I stated that some verification such as the pressure needs to be documented. The tool pusher will notify the County inspector upon completing BOP test. There was Bond log ran on the 13.375casing. I am not sure how the company RWS ran their log. According to cement ticket from Universal they had proper lift pressure. The company feels satisfied that the job was correct. I did not witness job. County inspector Bill Stolarick did.
0510023927 2013-01-31 Drill / Deepen / Reopen No Violations Inspector on site to witness the setting of the kick off plug, A plug was set through the drill casing inside of a 8.50 bore hole from 4698 to 4300. Universal Well Service was the cement company providing the cement services.
0550544485 2018-06-07 Production Wells No Violations On this day, I am conducting an inspection by request of ODNR Inspector William Stolarik in reference to an air quality complaint by a landowner. No unusual smells are indicated at this location. The well isnt equipped with annular pressure monitoring devices on the surface and intermediate casing strings. The company will need to have gauges installed for proper monitoring. The facility is gated with proper signage and an electronic shutdown button at the entrance. There are (5) 400 barrel steel tanks within containment, at the front left-side within containment. (2) gas processing units are located at the back left-side. There are (2) wells in production on this pad, surrounded by concrete barriers. The wellheads are properly identified. The company will be contacted to address the annular pressure monitoring issue.
0665331643 2012-09-04 Drill / Deepen / Reopen No Violations Well was spudded on 8-31 with 60of 24 drive pipe conductor being set on this day and 8 of 6 diameter cellar pipe. Inspector will note that the company is proposing to set 500 of 20 to be cemented back to surface as their cemented conductor. Permit called for 100 minimum conductor cemented back to surface. Inspector did not witness 24 being set.
0683997458 2014-07-30 Production Wells No Violations Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 5- 400 barrel production tanks on site servicing both 2 wells on the drill pad now in production.
0696134309 2013-02-21 Drill / Deepen / Reopen No Violations Status check inspection @ 11 AM to check on the running of the 5.5 production casing found the current depth to be 10,200 with the bore hole depth of 11,799 and the company circulating the casing into the bore hole. Inspector returned at 4 PM and the company was still running casing and approximately 300 short of their proposed total depth. Company man indicated they were at least 4 hours from being ready to start rigging up the cementers. I indicated to Him that I would pick up the cement long string tickets the following day.
0907946988 2013-02-13 Drill / Deepen / Reopen No Violations Inspection and status update of the drilling progress found the current drilling depth to be 7,221 and in the Horizontal section of the well bore with a proposed total depth of 11,800. Inspector discussed with the company man on site about having the drilling rig and equipment washed down before removal from the drill site in a area that would allow the recovery of the waste water.
0935775485 2013-01-23 Drill / Deepen / Reopen No Violations Status check inspection and review of the rework procedure to take place to complete the plugging of the 5.5 casing bore. Division MRI 3 Inspector Pat Shreve accompanied Myself ( Inspector Bill Stolarik ) with the proposed start date to be 01/24/2013/.
0961889198 2012-09-25 Drill / Deepen / Reopen No Violations Inspector received a call at 7:30 AM from Ron Giles stating that the 13.375 casing was on bottom and they would be cementing in a couple of hours, upon arrival on location inspector found that the casing and borehole was short of the permitted TD for the casing strings intended isolation. Inspector noted to the company man that the next string which will be the 9.625 must cover the Berea per permit conditions. Also noted that the company was not prepare to cement the casing by not having any fresh water on location and almost flowed their return tanks over while cementing the casing string.
1219811434 2012-10-13 Completion Testing No Violations Well has been complete under the special revised permit conditions. But the completion Pipe Tally records showing both the pipe tally and placement of centralizers on the production string and the casing pressure testing charts were never given to the inspector upon His request by the previous company representative Ron Giles, The new replacement consultants and myself looked through the completion records on hand and no information was found. The inspector also addressed an issue with a pressure leak at the well head and the protection fence being not up around the well head and both issues were addressed immediately by the company men on site.
1347323005 2012-09-10 Drill / Deepen / Reopen No Violations Inspector was on site to witness 20 surface to be cemented @ 8am. Pipe would not go into well bore so 18 was ran in with no problem and cemented to surface with good returns.
1347550921 2012-09-13 Drill / Deepen / Reopen No Violations Status check HAD drilling rig on hole, current depth of 1883 & using a 17.5 bit , Projected TD for 13.625 intermediate string 2500 Per company man Ron Giles. Drilling having to stop and shut down for 6 hrs at a time to allow for the company handling the solids to catch up. Red rock is exposed and starting to collapse.
1347922497 2012-09-17 Drill / Deepen / Reopen No Violations The conductor and surface casing has been set and while drilling the intermediate string at a depth of 1880 and a borehole of 17.5 the hole collapsed and part of the drill string was lost in the hole, The drill pipe and bottom hole assembly was recovered and drilling resumed on this day. Inspector will note that a copy of the casing laws was given to company man on locationRon Giles.
1348498769 2012-09-24 Drill / Deepen / Reopen No Violations Status check on drilling rig, current depth of 2342 using a 8.750 bit. Drilling company was stuck in hole at the bottom of the surface casing for 2 days. Upon further review it was discover that the casing guidelines were not being followed as the permit casing program called for and the 9.625 string was going to be omitted. Inspector called both corporate office and the field representative Ron Giles and had drilling progress stopped and required the company to comply with the permit conditions. Also noted, both inspector Pat Shreve and my myself have asked the company to cover the open cellar or tin horn set in the ground for the other well on the pad, before someone falls in it.
1348530311 2012-09-24 Drill / Deepen / Reopen Violations Noted Inspector was on site and company is attempting to drill well to TD without setting 9.625 through Berea, and has altered casing program from original casing program permit conditions as issued by the division. Inspector notified both the company headquarters and the field office representative Ron Giles that any further attempts to deepen well without first setting, properly centralizing and cementing back to surface the 9.625 intermediate string through the Berea or approximately 2100 would find them in further violation. Also proper notification must be made to the Division before casing strings are run into the well bore.
1348730422 2012-09-27 Drill / Deepen / Reopen No Violations Inspector received E-Mail confirmation that well was TD and loggers would be on site and logging at an estimated time of 1:30 pm, At 2:20 Pm I arrived on site and confirmed a total depth of 5789 and discussed the plan of action with the company man on site Ron Giles. Upon learning of the companys plan to cement the 5.5 casing into the well bore I asked the company man to have his intended plan confirmed through permitting.
1349052566 2012-09-28 Drill / Deepen / Reopen No Violations Received a call from company rep Ron Giles that the well was drilled to total depth and 5.5 casing was to be run and cemented to allow for testing procedure under the corrected permit conditions.
1355669506 2013-02-04 Drill / Deepen / Reopen No Violations Inspector on site to pick up 9.625 casing cement job ticket and the casing tally. Inspector was in contact with the company men on site over the weekend through both phone conversation and e-mail with constant updates on the running and setting of the 2119 of 9.625 intermediate string. 3 cement samples were taken and observed to have set up adequately. 668 sacks of gas block cement was used with 30% excess and 5 barrel of cement returns to surface.
1359146589 2013-01-25 Drill / Deepen / Reopen No Violations Inspector on site 8 hrs to witness the setting of the bottom hole plug over the Marcellus zone. A plug was set through 2.875 tubing inside the 5.5 casing covering the perforations from the depth of 5735 to 4700. The 5.5 will be cut and recovered at a free point above 4700.
1359466167 2013-01-29 Drill / Deepen / Reopen No Violations Inspection and status check on the setting depth of the bottom plug inside the 5.5 casing and the cutting of the 5.5 casing at the determined free point. The company man on site stated that the plug was tagged @ 4704 and the casing cut @ 4698, they are currently circulating oil based mud into the bore hole for stabilization reasons, the casing will then be pulled out of the hole and drill pipe ran in to spot the kick plug. The company man on site will contact me with an estimated time on setting the next plug.
1360277283 2013-02-07 Drill / Deepen / Reopen No Violations Up on inspection the current drilling depth was found to be 4239 using a 8.750 bit, with the current down hole position just starting to build their horizontal curve. Inspector will note that I made a phone call to Eclipse Resources field representative Melissa Hampshire regarding the soil that has been disturbed around the drill site perimeter boundary. It was agreed upon by both parties that once the drilling process was complete and the site cleared from equipment that a on site meeting would take place and corrective actions would then be initiated. Also it was observed that crews were on site maintaining erosion and run off control.
1361300650 2013-02-19 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling progress found that the well bore total drilling depth has been reached at 11,820 and the company is conditioning the bore hole with the anticipation of beginning to run the 5.5 production casing in the next 24 hours.
1361375026 2013-02-20 Drill / Deepen / Reopen No Violations Status check inspection on the running of the 5.5 production casing. Inspector received a copy of the casing tally indicating a float shoe and collar along with proper casing centralizer placement. Casing depth according to the tally will be 11,799.45. Estimated time to run casing is 20 hours minimum.
1364030503 2013-03-22 Completion Testing No Violations Inspection found the stimulatin co rigging up and the well bore completion to begin in the next 48 hrs. Operations will be running 24 Hrs a day.
1364504970 2013-03-26 Drill / Deepen / Reopen No Violations Inspector on site for a status check of the stimulation process. Inspection found the company in-between the 1st & 2nd stimulation stage.
1365096752 2013-04-04 Drill / Deepen / Reopen No Violations Status check on well completion, Stimulation in process between the 6th & 7th stage and waiting on coiled tubing unit to clear the borehole.
1934897211 2012-09-09 Production Wells No Violations On the day of my inspection HAD drilling was running 20 casing. They were having trouble and decided to run 18.375 instead. No violations noted.
2057342411 2014-02-19 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well has been completed and is in production with 5 - 400 barrel production tanks on site with proper well identification posted, The area affected by the pre site construction and drilling process will need addition excavation work when the weather allows.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1348530311 US-OH-110089 2012-09-24 Failure to comply with permit conditions
1348530311 US-OH-110090 2012-09-25 Failure to notify inspector; failure to submit cement tickets

For data sources see[1]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/25/2013 04/11/2013 5603 6,488,440.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 7.5%-15% Acid, Slickwater, WF120, YF120ST Schlumberger Corrosion Inhibitor, Bactericide (Myacide GA25), Scale Inhibitor, Surfactant , Acid, Breaker, Crosslinker, Gelling Agent, Friction Reducer, Iron Contr Water (Including Mix Water Supplied by Client)* - 0 86.3565 0
Alcohol, C11-14, ethoxylated 78330-21-9 0.00039 0.00005000 0
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 0.00058 0.00008000 0
Polymer of 2-acrylamido-2-methylpropanesulfonic acid sodium salt and methyl acrylate 136793-29-8 0.0036 0.00049 0
Ethane-1,2-diol 107-21-1 0.00213 0.00029 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0.00074 0.0001 0
Trisodium ortho phosphate 7601-54-9 0.00748 0.00102 0
Octamethylcyclotetrasiloxane 556-67-2 0 0 0
Dimethyl siloxanes and silicones 63148-62-9 0.00003000 0 0
Sodium erythorbate 6381-77-7 0.00449 0.00061 0
Naphtalene (impurity) 91-20-3 0.00008000 0.00001000 0
Poly(oxy-1,2-ethanediyl) 25322-68-3 0.00017 0.00002000 0
Siloxanes and Silicones, di-Me, reaction products with silica 67762-90-7 0 0 0
Alkenes, C>10 a- 64743-02-8 0.00033 0.00005000 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0.00007000 0.00001000 0
1, 2, 3 - Propanetriol 56-81-5 0.059 0.00805 0
Quaternary ammonium compounds chlorides derivatives 68989-00-4 0.00039 0.00005000 0
Diammonium peroxidisulphate 7727-54-0 0.05315 0.00725 0
Cholinium chloride 67-48-1 0.1517 0.0207 0
Sodium tetraborate decahydrate 1303-96-4 0.0354 0.00483 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic acid, sodium salt polymer 38193-60-1 0.03356 0.00458 0
Urea 57-13-6 0.00221 0.0003 0
Crystalline silica 14808-60-7 97.4995 13.3024 0
Guar gum 9000-30-0 1.16986 0.15961 0
Hydrogen chloride 7647-01-0 0.79152 0.10799 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0.0016 0.00022 0
Heavy aromatic naphtha 64742-94-5 0.00039 0.00005000 0
Glutaraldehyde 111-30-8 0.04235 0.00578 0
Sodium sulfate 7757-82-6 0.01371 0.00187 0
Potassium hydroxide 1310-58-3 0.00014 0.00002000 0
Decamethyl cyclopentasiloxane 541-02-6 0 0 0
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 0.00299 0.00041 0
Alcohol, C7-9-iso, C8, ethoxylated 78330-19-5 0.00078 0.00011 0
Alcohol, C9-11-iso, C10, ethoxylated 78330-20-8 0.00078 0.00011 0
Polyethylene glycol monohexyl ether 31726-34-8 0.06828 0.00932 0
Prop-2-yn-1-ol 107-19-7 0.0005 0.00007000 0
Sodium hydroxide 1310-73-2 0 0 0
Fatty acids, tall-oil 61790-12-3 0.00194 0.00026 0
Propan-2-ol 67-63-0 0.0006 0.00008000 0
Ammonium sulfate 7783-20-2 0.03172 0.00433 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0
Non-crystalline silica 7631-86-9 0.00351 0.00048 0
Methanol 67-56-1 0.00704 0.00096 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-10-01 H2O 0 50 Bbl 0 Halliburton

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-08-22 Proposed Formations:MARCELLUS TO TRENTON, Issued Date:8/22/2012, Expired Date:8/22/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2012-09-28 CORRECTION TO PROPOSED GEOLOGICAL FORMATION.
Reached Total Depth 2012-09-28
Completion Report Received 2012-10-23
Plugged Back 2013-01-24
End of Confidential Data 2013-09-28
Construction Permit Expires 2014-08-22
Record Last Modified 2015-03-18

For data sources see[1]

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "RBDMS". Ohio Department of Natural Resources. 2019-05-07. Retrieved 2019-05-21. 
  2. Cite error: Invalid <ref> tag; no text was provided for refs named Annual_Prod
  3. "FracFocus Fracking Chemicals Database". 2019-04-02. Retrieved 2019-06-19.