Well ID: 34-111-24527 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.77384267,"lon":-81.29786927,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Franklin | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: 1132 | |
Farm/Lease Name: DIMMERLING UNIT | |
License Status: Producing | |
License Date: 2015-10-02 | |
Spud Date: 2014-10-28 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-02-18 | |
Well Total Depth: 17150 ft | |
Configuration: Horizontal | |
Latitude: 39.773842670 | |
Longitude: -81.29786927 |
For data sources see[1]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-02-11 | 8937 | 17066 | 0 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 659767 | 245 | 92 |
2016 | ANTERO RESOURCES CORPORATION | 2495722 | 416 | 362 |
2017 | ANTERO RESOURCES CORPORATION | 863204 | 228 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 594095 | 210 | 362 |
2019 | ANTERO RESOURCES CORPORATION | 117699 | 90 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 31440 | 92 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 58586 | 362 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 5510 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 3590 | 362 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 655 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0111071984 | 2014-11-01 | Casing String Witnessed | No Violations | On site inspection to witness the 26 conductor hole cement top off job. On 10/31/2014 the conductor was cemented with no cement returns to surface. On this day the casing was pressure tested to verify the shoe was properly cemented, with no recorded pressure loss. The annular side of the casing was then grouted through 1 tubing set at 25 with cement verified to surface. Allied Cement services was the cement company using 43 barrels or 256 sacks of class A cement. |
0338316366 | 2015-11-23 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction has been restored with proper erosion control and vegetation in place. Addressing the well status-The well drilling and completion process is now complete and a production well head tree is in place and the well is on line and producing. At the production fluid storage area a total of 8 production tanks are present with a fluid capacity of 400 barrels each, all located inside a polymer lined metal containment dike area. |
0582824341 | 2016-02-17 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. Addressing the well status, The well drilling and completion process is now complete and all (5) of the wells on the pad are capable of production and are currently in the flow back testing stages with a company on location identified as Solid Oak flow back services monitoring the well testing. There is 3 vertical sand trap separators and 5 gas processing units on location with the sand trap separators being evacuated into a 500 barrel tank. Addressing the production fluid storage area- A total of (8) 400 barrel capacity tanks are present inside a polymer lined steel containment dike area. |
0847299084 | 2015-02-12 | Drill / Deepen / Reopen | No Violations | Status check inspection of the current drilling process found Patterson Drilling rig # 332 on location drilling the horizontal wellbore section at a current depth of 12,746 using a 8.750 directional drilling assembly and 13.7# in the directional azimuth of 328.63 degrees with a inclination of 90.95 degrees, there is currently a influx of 4,753 units of 3rd party gas being controlled. The proposed total depth to be drilled is 17,158. |
1041369537 | 2015-02-05 | Casing String Witnessed | No Violations | |
1414649146 | 2014-10-30 | Casing String Witnessed | No Violations | The said well was spudded on 10/28/14 by Rocky Mountain Drilling top hole rig with a 32 x 95 conductor borehole being drilled with solid bedrock @ 80. Allied Cement services cemented the casing using 328 sacks of class A cement with 100% open hole cement excess ran with no cement returns to surface. Orders were given to the company man on location to re pressure test the casing and confirm a seal at the shoe and run a tubing string in the annular side of the well bore and tag the top of the cement. We will then determine if a grout job or another displacement job needs done. The well pad is constructed atop a old surface mined limestone quarry with approximately 75 of unconsolidated fill material. |
1414795153 | 2014-10-31 | Casing String Witnessed | No Violations | On site inspection to witness the grouting of the 26 conductor pipe that was set and cemented on 10/30/14. Allied cement services grouted the casing through 1 tubing set in the annular side of the casing. 200 sacks of class A -15.6# 1.18 yield 2% calcium .25 pps lcm was used with no cement returned to surface. The company will attempt to grout the casing with a redi mix cement mix on 11/01/14. |
1417477044 | 2014-12-01 | Casing String Witnessed | No Violations | On site to witness18.625 casing Sidewinder rig 59 ran 354 of casing in well and Allied Cementing cemented it in place and they had 20 bbl of good cement returns. |
1419289272 | 2014-12-21 | Drill / Deepen / Reopen | No Violations | Patterson rig 332 rigging up on pad to drill the lateral sections of the well bore. |
1440250431 | 2015-08-22 | Completion Testing | No Violations | Status check inspection on the well completion process found the well stimulation process in now complete and a workover rig owned by Fortis well service is on location preparing to commence drilling out the well bore completion plug . The rig has mobilized their rig assist 10,000# working pressure tubing snubbing unit with one primary completion master valve still in place on the well head above the tubing spool assembly and B section. EFS fluid management company is handling the well discharge fluid operation side. The rig is placed on a 2nd polymer containment on top of the main polymer working containment area with the well pad perimeter earthen dike serving as the primary means of containment with the perimeter valves being in the close position. |
1557583610 | 2015-02-04 | Casing String Witnessed | No Violations | |
1578109080 | 2018-03-02 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section and a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 500 (psi) pound per square inch indicated between the 9.65 and 13.375 and 1300 psi between the 5.5 and 9.625. Proper well identification is posted at the well head. Also on location is (5) gas processing units one for each well head on location. At the left front corner of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site. |
2041698305 | 2015-07-20 | Completion Testing | No Violations | Status check inspection on the well completion process found US Well Service on location and 8 stages completed on the said well. Allied Horizontal Well Service has perforated stage 9 using 60 perforating shots in 6 clusters shot between the depth of 15,676 and 15,531 with a completion plug set at the depth of 15,691 to isolate the prior zones completed. The company is using the shoot on the fly method with a wireline travel speed of 40 per minute. |
2056686228 | 2015-02-17 | Casing String Witnessed | No Violations | My inspection today finds the drilling rig, Patterson 332, is currently running 5.5 production casing at a depth of 14,308. |
2059890327 | 2019-02-07 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (5) producing wells, (5) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 1,200 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 500 psi. |
For data sources see[1]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/18/2015 | 07/28/2015 | 8236 | 12,417,800.0 | 541384 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AI-301 | U.S. Well Services | Acid Corrosion Inhibitors | Methenamine | 100-97-0 | 20 | 0.00023 | 261.776 |
Diethylene Glycol | 111-46-6 | 30 | 0.00029 | 330.369 | ||||
Polyethylene polyamine | 68603-67-8 | 10 | 0.00009000 | 99.1009 | ||||
Coco amine | 61791-14-8 | 5 | 0.00004000 | 45.2695 | ||||
Hydrogen Chloride | 7647-01-0 | 10 | 0.0001 | 114.158 | ||||
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00234 | 2673.8 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.0041 | 4681.07 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 8.50479 | 9,700,450.0 | |
SI-1100 | U.S. Well Services | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 25 | 0.00349 | 3981.72 | |
Potassium salt of diethylene triamine penta (methylene phosphonic acid) | 15827-60-8 | 7.5 | 0.00125 | 1427.08 | ||||
Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00146 | 1663.16 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.0008 | 916.149 | ||||
Water | 7732-18-5 | 80 | 0.00989 | 11275.7 | ||||
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00032 | 366.46 | ||||
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.0008 | 916.149 | ||||
LGC-15 | U.S. Well Services | Gelling Agents | Petroleum Distillates | 64742-47-8 | 60 | 0.04262 | 48616.6 | |
Guar Gum | 9000-30-0 | 50 | 0.04501 | 51334.3 | ||||
Surfactant | 68439-51-0 | 3 | 0.0027 | 3080.06 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.00688 | 7851.13 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 90.7994 | 103,565,000.0 | |
WFRA-405 | U.S. Well Services | Friction Reducer | Sodium Chloride | 7647-14-5 | 20 | 0.01726 | 19685.7 | |
Ethoxylated alcohol blend | Proprietary | 5 | 0.00431 | 4921.43 | ||||
Petroleum Distillates | 64742-47-8 | 20 | 0.01389 | 15847 | ||||
Anionic Polyacrylamide | Proprietary | 40 | 0.03452 | 39371.5 | ||||
Water | 7732-18-5 | 40 | 0.03452 | 39371.5 | ||||
AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00174 | 1985 | |
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.09008 | 102742 | |
Water | 7732-18-5 | 87.5 | 0.37711 | 430122 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-07-18 | H2O | 15 | 6654 Bbl | 234130 | US Well Services Inc | STAGE 1/46
60 SHOTS STAGES 2-45 SEE IMAGES |
2015-07-28 | H2O | 0 | 5573 Bbl | 230730 | US Well Services Inc | STAGE 46/46
60 SHOTS |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-09-25 | Proposed Formations:POINT PLEASANT, Issued Date:9/25/2014, Expired Date:9/24/2016 12:00:00 PM, Drilling unit acres:370.772, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2014-12-19 | UNIT SIZE INCREASED, SURFACE AND TAKE-POINT INFORMATION CHANGED (FOOTAGES AND COORDINATES) FROM NEW PLAT. |
Reached Total Depth | 2015-02-18 | |
Correction to Well | 2015-10-02 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-02-11 | |
Construction Permit Expires | 2016-09-24 | |
Record Last Modified | 2017-10-23 |
For data sources see[1]