If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24530 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.826542763,"lon":-81.28469625,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Seneca | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: 811 | |
Farm/Lease Name: BIEDENBACH UNIT | |
License Status: Producing | |
License Date: 2016-01-29 | |
Spud Date: 2014-12-10 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-04-19 | |
Well Total Depth: 15750 ft | |
Configuration: Horizontal | |
Latitude: 39.826542763 | |
Longitude: -81.28469625 |
For data sources see[1]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-01-29 | 8643 | 15406 | 0 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 429202 | 181 | 92 |
2016 | ANTERO RESOURCES CORPORATION | 1351449 | 187 | 354 |
2017 | ANTERO RESOURCES CORPORATION | 559711 | 109 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 347796 | 136 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 74031 | 56 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 10034 | 92 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 26141 | 354 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 5920 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 3071 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 665 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0086638089 | 2015-03-22 | Drill / Deepen / Reopen | No Violations | Status check inspection on the drilling process found Patterson drilling rig #340 on location drilling the 12.250 2nd intermediate wellbore at a current depth of 4,964. The company is currently implementing a 7.43 degree nudge in the direction of 256.86 degrees. |
0094458383 | 2015-07-09 | Completion Testing | No Violations | Status check inspection on the well completion process found Renegade Wireline Service on location perforating stage 22 of 39 total stages to be completed with a total of 60 perforations shot in 5 clusters between the depths of 11,750 and 11,603 along with a solid composite type 15,000# rated pressure completion plug set at a depth of 11,763. US Well Service is on location to provide the pressure pumping and Bass Well Head Company has their well head equipment on the hole. There is currently 3 live well heads on this location and 4 additional wells being completed. All well completion operations are being conducted on a poly containment area and ECM services is on location recovering standing water on the site pad created from the recent rainfall event. The 5.5 production casing annular pressure is being monitored electronically. |
0147381917 | 2018-03-07 | Production Wells | No Violations | Status check inspection found the well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads 220 pounds pressure and the 9.625 casing well head reads 300 pounds pressure. On pad total is (8) complete wells supported by (8) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. The well lease road entrance is gated and locked with signage posted at the entrance of the well pad and at each well head. The well pad has a stone surface along with the lease road. The well pad perimeter berm is of earthen material and in good repair. |
1215159420 | 2015-03-13 | Casing String Witnessed | No Violations | On site to witness casing run and cemented in place.
18.625 was set at 475KB and 450GL and Halliburton cemented with 780 sacks of Halcem cement and they had 47 barrel of good cement returns and it stayed up good and they bumped plug 500# over and held for 15 min and once released plug held fine. |
1418316846 | 2014-12-11 | Casing String Witnessed | No Violations | The said well was spudded on 12/10/2014 by Express Energys top hole rig with a 32 x 100 conductor borehole being drilled and 100 of 26 conductor pipe being set. Express Energys cement service is on location to cement the casing using 330 sacks of class A-2% calcium .50 pps flake with 100% open hole cement excess ran and circulation established prior to cementing and the cement displaced with 55 barrels of fresh water and good cement returns witnessed to surface. |
1447080532 | 2015-11-09 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction has proper vegetation and erosion control in place in accordance to ORC 1509.072. Addressing the well and production equipment- The well drilling and completion process is finished with 2.875 production tubing set to a depth of 8,548 with crews present hooking up the production flowlines and equipment. Crews are also present on location removing the containment used during the completion process and cleaning up the well heads and cellar. A total of 8 wells heads are present on location along with 8 gas processing units with 8 400 barrel production tanks present in a polymer lined metal containment dike area. |
1656277672 | 2019-02-07 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (8) producing wells, (8) gas processing units, (4) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. This well is setup to be produced by means of a plunger lift system. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 200 psi. It will be noted that in 2018 a slip had occurred along the southern slope of the pad and western slope of the lease road, prior to the pad. The slopes have since been graded, seeded, and erosion control in place. Currently awaiting new vegetation. |
2089269649 | 2015-04-08 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling progress found Patterson Drilling rig 340 on location drilling the 8.75- production borehole at a measured depth of 13,302 in the directional azimuth of 146.38 and inclination of 88.86 degrees with a true vertical depth of 8,472. The company in implementing a pressure control drilling method and is holding back 266 psi on the annular side of the drill string using 13# synthetic oil based drilling mud. |
For data sources see[1]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/04/2015 | 07/12/2015 | 8504 | 10,455,600.0 | 483756 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00234 | 2272.15 |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.0041 | 3977.88 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 9.60071 | 9,309,210.0 | |
SI-1100 | U.S. Well Services | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 25 | 0.00354 | 3435.12 | |
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.00082 | 790.382 | ||||
Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00148 | 1434.85 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.00082 | 790.382 | ||||
Water | 7732-18-5 | 80 | 0.01003 | 9727.78 | ||||
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00033 | 316.153 | ||||
Potassium salt of diethylene triamine penta (methylene phosphonic acid) | 15827-60-8 | 7.5 | 0.00127 | 1231.17 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.0431 | 41793.4 | |
Water | 7732-18-5 | 87.5 | 0.18044 | 174965 | ||||
WFRA-405 | U.S. Well Services | Friction Reducer | Ethoxylated alcohol blend | Proprietary | 5 | 0.00293 | 2844.36 | |
Petroleum Distillates | 64742-47-8 | 20 | 0.00945 | 9158.83 | ||||
Anionic Polyacrylamide | Proprietary | 40 | 0.02347 | 22754.9 | ||||
Sodium Chloride | 7647-14-5 | 20 | 0.01173 | 11377.4 | ||||
Water | 7732-18-5 | 40 | 0.02347 | 22754.9 | ||||
LGC-15 | U.S. Well Services | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.00409 | 3963.32 | |
Suspending agent (solid) | 14808-60-7 | 3 | 0.01042 | 10102.6 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.06452 | 62558.3 | ||||
Guar Gum | 9000-30-0 | 50 | 0.06812 | 66055.3 | ||||
AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00202 | 1955 | |
AI-301 | U.S. Well Services | Acid Corrosion Inhibitors | Hydrogen Chloride | 7647-01-0 | 10 | 0.00005000 | 46.4371 | |
Coco amine | 61791-14-8 | 5 | 0.00002000 | 18.4147 | ||||
Polyethylene polyamine | 68603-67-8 | 10 | 0.00004000 | 40.3122 | ||||
Diethylene Glycol | 111-46-6 | 30 | 0.00014 | 134.387 | ||||
Methenamine | 100-97-0 | 20 | 0.00011 | 106.485 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 89.9304 | 87,200,000.0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-07-04 | H2O | 15 | 6931 Bbl | 215380 | US Well Services Inc | STAGE 1/39
60 SHOTS STAGES 2-38 SEE IMAGES |
2015-07-12 | H2O | 15 | 5847 Bbl | 244700 | US Well Services Inc | STAGE 39/39
60 SHOTS |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-10-17 | Proposed Formations:POINT PLEASANT, Issued Date:10/17/2014, Expired Date:10/16/2016 12:00:00 PM, Drilling unit acres:506.928, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2015-01-21 | Proposed Formations:POINT PLEASANT, Issued Date:1/21/2015, Expired Date:1/20/2017 12:00:00 PM, Drilling unit acres:546.267, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-04-19 | |
Correction to Well | 2015-07-31 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-01-29 | |
Construction Permit Expires | 2017-01-20 | |
Record Last Modified | 2017-10-23 |
For data sources see[1]