If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24644 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.780259718,"lon":-80.91375206,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Salem | |
Operator Name: EQUINOR USA ONSHORE PROPERTIES | |
Well Pad ID: 1351 | |
Farm/Lease Name: CIRCOSTA SOUTH | |
License Status: Producing | |
License Date: 2017-12-12 | |
Spud Date: 2016-09-28 | |
Spud Drilling Contractor: ORION DRILLING | |
Final Drill Date: 2017-01-12 | |
Well Total Depth: 20665 ft | |
Configuration: Horizontal | |
Latitude: 39.780259718 | |
Longitude: -80.91375206 |
For data sources see[1]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-12-12 | 10801 | 10921 | 45 |
2017-12-12 | 20401 | 20521 | 45 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | STATOIL USA ONSHORE PROPERTIES | 1515841 | 0 | 66 |
2018 | EQUINOR USA ONSHORE PROPERTIES | 5724955 | 0 | 353 |
2019 | EQUINOR USA ONSHORE PROPERTIES | 1253322 | 0 | 86 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | STATOIL USA ONSHORE PROPERTIES | Brine | 8382 | 66 |
2018 | EQUINOR USA ONSHORE PROPERTIES | Brine | 31595 | 353 |
2019 | EQUINOR USA ONSHORE PROPERTIES | Brine | 7621 | 86 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0346805610 | 2017-03-21 | Preliminary Restoration | No Violations | Status check inspection on the preliminary restoration found the well pad has earthen slips on the North East outward facing slope that has encompassed the earthen well pad perimeter berm. ODNR Engineer Tech Andy Thomas was advised of the defect and will with the company on a resolution. The well bore drilling is complete and the drilling rig has moved off location. |
1012871190 | 2016-12-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Orion Drilling Polaris Rig # 14 was drilling a 12.25 inch diameter hole at a depth of 8677 feet with a planned total depth of 9752 feet on 8.6 pound per gallon 5% KCL brine making 2 feet per hour. I met with Statoil Consultant Keith Johnson who stated Orion Drilling Polaris Rig #14 lost their air package last night and went to fluid with plans to go back on air once Weatherford makes need repairs. I reviewed upcoming cement proposal from Halliburton Services for the 9.625 inch diameter casing. |
1475344785 | 2016-10-01 | Casing String Witnessed | No Violations | 10/01/2016 -On site inspection to witness the conductor casing cement job with Express Energys top hole rig on location. The rig has drilled a 36 bore hole to 100 with fresh water encountered at ground level. Express Energys cement service cemented the casing using 275 sacks of class A-2% calcium 1/2 lb-sk lcm, cement was displaced with 71 bbl of fresh water and 15 barrels of cement returns witnessed to surface. |
1478520587 | 2016-11-03 | Casing String Witnessed | No Violations | On site inspection for a 5:30 am call out to witness the 20 surface casing cement job. Upon arrival it was observed that Well Service Group rig # 1 is on location and has drilled a 26 surface borehole to 625 and is attempting to make up the last casing joint to be inserted into the well bore with the casing threads being damaged. The company delayed the job until a later time due to having to order a new casing landing joint. The job did not go until 9:00 pm on this day and was not witnessed due to time restraint issues. |
1671980996 | 2017-01-03 | Drill / Deepen / Reopen | No Violations |
For data sources see[1]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/09/2017 | 08/11/2017 | 10410 | 48,300,600.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 93.0162 | 402,826,000.0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.184855 | 800554 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FDP-S1176-15 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
Crystalline silica, quartz | 14808-60-7 | 100 | 6.77152 | 29,325,400.0 | ||||
Ethanol | 64-17-5 | 1 | 0.00010256 | 445 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00002584 | 112 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00001026 | 45 | ||||
Sodium chloride | 7647-14-5 | 5 | 0.00260646 | 11288 | ||||
Ammonium chloride | 12125-02-9 | 5 | 0.00260646 | 11288 | ||||
Sobitan, mono-9-octadececenoate, (Z) | 1338-43-8 | 5 | 0.00260646 | 11288 | ||||
Castor oil, ethoxylated | 61791-12-6 | 5 | 0.00260646 | 11288 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00313032 | 13557 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0214349 | 92829 | ||||
Citric acid | 77-92-9 | 60 | 0.00216537 | 9378 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0156387 | 67727 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00307679 | 13325 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.00007751 | 336 | ||||
Acetic acid | 64-19-7 | 60 | 0.00187819 | 8134 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.00007751 | 336 | ||||
9-Octadecenamide, n,n-bis-2(hydroxy-ethyl)-,(Z) | 93-83-4 | 5 | 0.00260646 | 11288 | ||||
Polyacrylate | Proprietary | 30 | 0.0156387 | 67727 | ||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl chlorides | 68424-85-1 | 5 | 0.000512798 | 2221 | ||||
Olefins | Proprietary | 5 | 0.00003100 | 136 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.00007751 | 336 | ||||
Methanol | 67-56-1 | 60 | 0.000169378 | 735 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-08-11 | H2O | 15 | 329680 Gal | 461880 | Halliburton | STAGE 65/65
STAGES 2-64 SEE IMAGES |
2017-08-11 | H2O | 15 | 352756 Gal | 451730 | Halliburton | STAGE 1/65
STAGES 2-64 SEE IMAGES |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-12-24 | Proposed Formations:POINT PLEASANT, Issued Date:12/24/2015, Expired Date:12/23/2017 12:00:00 PM, Drilling unit acres:960.83, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2016-06-02 | Proposed Formations:POINT PLEASANT, Issued Date:6/2/2016, Expired Date:6/2/2018 12:00:00 PM, Drilling unit acres:463.59, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-01-12 | |
Correction to Well | 2017-03-31 | UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 3/10/17-RC |
Completion Report Received | 2017-12-01 | |
Correction to Well | 2018-02-23 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Construction Permit Expires | 2018-06-02 | |
Change of Owner | 2018-08-08 | Operator changed from 9065, STATOIL USA ONSHORE PROPERTIES INC to 10187, EQUINOR USA ONSHORE PROPERTIES INC. |
Record Last Modified | 2018-08-08 |
For data sources see[1]