34-117-24222

Well Details

Well ID: 34-117-24222
Loading map...
Country: United States
State: Ohio
County: Morrow
Municipality: Gilead
Operator Name: HOUGHTON INVESTMENTS LLC
Well Pad ID:
Farm/Lease Name: E DUMBAUGH (SWIW # 64)
License Status: Active Injection
License Date: 2014-01-28
Spud Date: 2010-12-09
Spud Drilling Contractor: BOWMAN DRILLING
Final Drill Date: 2011-01-08
Well Total Depth: 3415 ft
Configuration: Vertical
Latitude: 40.521450917
Longitude: -82.81374053

For data sources see[1]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-05-17 3308 3318 30
2011-05-17 3344 3350 19

For data sources see[1]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 HOUGHTON INVESTMENTS LLC 0 0 365

For data sources see[1][2]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 HOUGHTON INVESTMENTS LLC Brine 2125 365

For data sources see[1][2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0070287207 2014-12-10 Salt Water Injection Well No Violations Inspected the E. Dumbaugh #1 (SWIW #4222) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
0084613249 2013-12-09 Surface Facility Construction No Violations Inspect well and location. Well is shut in. Contractor installing transfer line from Higgins wells.
0100219827 2014-07-21 Salt Water Injection Well No Violations Inspect the well and location. The flow meter indicates 546533 gallons.
0143092769 2014-01-06 Salt Water Injection Well No Violations Check status of injection well. No change in status from previous inspection. Waiting on approval to begin injection.
0143429551 2018-05-07 Salt Water Injection Well No Violations Inspect well for integrity and pressure. There is no pump on the injection well. The tubing pressure is a result of the hydraulic head from water in the tank at the time of the inspection.
0168314181 2014-01-23 Salt Water Injection Well No Violations Received Chief Order No. 2014-29 granting Houghton Investments authorization to begin injection with operational conditions.
0177682904 2017-10-10 Salt Water Injection Well No Violations Injection well status check. Status: ok.
0203289304 2016-07-26 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
0229173305 2014-10-10 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
0238789043 2016-01-20 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
0376882339 2014-10-23 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, storage and identification. Status: ok.
0386985814 2018-10-03 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
0410264752 2014-04-01 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: the well has been placed back into injection.
0448097005 2014-09-15 Salt Water Injection Well No Violations Inspect well and tanks. Well in operation.
0456468306 2017-11-06 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
0479538297 2014-04-08 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
0551028095 2017-12-13 Salt Water Injection Well No Violations Inspect storage facility and well.
0617350184 2013-12-20 Surface Facility Construction No Violations The operator has finished plumbing the storage tank: ladder added, new valves installed and the in/out injection lines are in.
0711365857 2014-08-25 Salt Water Injection Well No Violations Inspected the E. Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
0737965175 2018-08-23 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
0765159807 2014-02-13 Salt Water Injection Well No Violations On-site with Inspector Benko to witness the installation of the two pen pressure chart recorder. Manufacturer: ITT Barton, red pen= Injection, blue pen= Annulus. Injection (red) pen zeroed at 75 psi to observe vacuum. Flow Meter: John C. Ernst Electronic Digital Meter, reads in GALLONS not BARRELS. Status: the operational conditions of Chiefs Order No. 2014-29 have been satisfied and the well has been officially placed into operation.
0780935836 2014-06-20 Salt Water Injection Well No Violations On-site with UIC Inspector Tom Benko for standard injection well status check. Status: ok.
0803668107 2015-07-16 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
0937617759 2013-12-09 Surface Facility Construction No Violations The operator is continuing work on injection line.
0995994503 2017-04-14 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
1008612182 2015-10-29 Salt Water Injection Well No Violations Inspect location and measure storage dike area with Jennifer Gingras.
1051907586 2014-03-18 Salt Water Injection Well No Violations Inspected the E. Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
1078867019 2014-03-21 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
1116694294 2015-02-13 Salt Water Injection Well No Violations Inspect well and location. Well has -30 inches of mercury vacuum.
1127924486 2013-02-20 Salt Water Injection Well No Violations Check injection well and pressures.
1248638232 2014-04-23 Surface Facility Construction No Violations The operator has buried the 1000 gallon plastic tank for the vault directly behind (East) the unload pad. This is an in the field revision to the revised construction plan. The drain for the pad was also moved toward the rear of the pad. No plan revision needed as per Mr. Tom Tomastik. Status: will continue to monitor construction.
1255973219 2017-01-19 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
1341250932 2013-12-19 Salt Water Injection Well No Violations Inspect well and location. Timco on site to load annulus and pressure test. Test well at 460 psi for 15 minutes. Test passed.
1343324365 2016-04-12 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
1347110319 2012-08-21 Salt Water Injection Well No Violations Inspected well for conversion to a Salt Water Injection Well (SWIW). Well is located in open field. About ten residential homes and farm houses with water wells, located within a 0.25 mile radius and the closest water well is 670 feet west of the injection well. The water wells range in depth from about 60 feet to 140 feet, but the deepest is 250 feet. The homes in the area are reported to have rural water supply. A small farm pond is located less than 300 feet to the north east of the well. If the tank battery is to be located near the road with an unloading pad then double lined injection lines should be warranted. Contacted Landowner, at time of inspection, unaware of the operators intent to convert well into injection well.
1356710877 2013-12-20 Brine Hauler No Violations Inspect Mullins Energy Services brine truck on site to pressure test injection line. License number PHW 8499, Truck #3. Brine and UIC number clearly and properly marked. Status: ok.
1367591812 2013-05-03 Preliminary Restoration No Violations Performed preliminary restoration inspection on the Dumbaugh #1 (#4222). The well currently is idle, tubing is installed in the well, no pump jack or storage. Currently being considered for conversion to SWIW. Status: ok.
1375116598 2013-07-29 Salt Water Injection Well No Violations Permit issued to convert to a SWIW issued 7/18/2013 expires 7/18/2015.
1386266563 2013-12-05 Surface Facility Construction No Violations The operator has begun work on the conversion. The access road off state route 61 is in place to the well. The storage dike (20 x 40) is built, lined and covered to plan specifications and the injection line (2 IPS, DR11-PE4710/PE3408 ASTM D2513 100313C) from the Higgins (#3401) is currently being run.
1386856849 2013-12-12 Salt Water Injection Well No Violations Berry well service finished pulling and laying down tubing. 1:30 pm run-in-hole with knock out tool to knock out bridge plug set at 3340 (per operator). 1:45pm Berry well service tag bridge plug at 3348 and drive to 3390 (service rig depths). Shut down for the day.
1386876840 2013-12-12 Preliminary Restoration No Violations The Dumbaugh #1 (#4222) is being converted to a disposal well. Preliminary restoration completed.
1386948820 2013-12-13 Salt Water Injection Well No Violations 9:00 am Berry well service start in hole with new Parmaco C-301 packer, set on new 2.375 upset, 4.7 pound, J55 polylined tubing. 12:30 pm Ran 105 joints tubing set packer on tension at 3258, top of perferations 3308. 12:45 pm Producers Services Corporation hooked up to well and begin displacing water and packer inhibitor down annulus. 1:36 start bleeding air and foam out of annulus. Unable to bleed air and foam out of system, shut down for the weekend.
1387316256 2013-12-17 Surface Facility Construction No Violations A new RPX Composites 210 barrel fiberglass storage tank has been delivered to location.
1387472740 2013-12-19 Surface Facility Construction No Violations The operator has placed the storage tank in the dike and has begun construction of the injection line from the tank to the well.
1387566058 2013-12-20 Salt Water Injection Well No Violations 1) On site with Mullins Energy Services to pressure test the injection line from the storage tank to the well. 3:00 pm Mullins pressured up line to 100 psi. 3:15 pm reading 100 psi. Status: Injection line from storage tank to injection well passed integrity test. 2) Mullins Energy Services hook up to injection line from Dumbaugh injection well to Higgins production well. 3:50 pm pressure up to 100 psi. 4:05 pm reading 99 psi. Status: Injection line from the Higgins (#3401) to the Dumbaugh (#4222) passed integrity test.
1389642000 2013-01-14 Salt Water Injection Well No Violations The well is not in injection, waiting on approval.
1390495956 2014-01-23 Salt Water Injection Well No Violations Location Information. ENTRANCE: Lat. 40.52106 Long. -82.81662 / WELL HEAD: Lat. 40.52150 Long. -82.81357 / CENTER-OF-STORAGE: Lat. 40.52140 Long. -82.81354.
1393347754 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (#4222) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: no change in status from previous inspection.
1394034704 2014-03-05 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: the operator has added the well identification and emergency contact information at the storage and identified the permit number and SWIW number at the well head.
1394650375 2014-03-12 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: The operator filled and pressure tested the annulus on 3/11/2014. Tested 325 psi for 15 minute. Tested ok.
1396276783 2014-03-31 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW # 64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: well currently shut-in.
1397653823 2014-04-16 Surface Facility Construction No Violations On-site with Inspector Benko to witness construction of the forms for the unloading pad for the disposal well.
1397740555 2014-04-17 Surface Facility Construction No Violations The unload pad has been poured, witnessed by Inspector Benko. A new RPX Composite 210 barrel tank has been delivered to the site. Status: will continue to monitor surface facility construction.
1397840921 2014-04-18 Surface Facility Construction No Violations The operator has a crane on location and is placing the composite 210 barrel tank into the storage dike.
1398169741 2014-04-16 Surface Facility Construction No Violations Inspect well and location. Operator set forms and poured concrete for unloading pad. Concrete was ordered with fibers and rebar was used for reinforcement.
1398172008 2014-04-22 Surface Facility Construction No Violations The second storage tank has been set and the operator has erected the ladder and walkway.
1398431290 2014-04-25 Surface Facility Construction No Violations Crushed limestone has been delivered to the site for the access road.
1398693655 2014-04-28 Surface Facility Construction No Violations Surface facility construction complete. The operator has begun hauling into the facility.
1398863126 2014-04-30 Surface Facility Construction No Violations The recently buried 1000 gallon plastic tank for the vault has floated out of the ground due to recent heavy rains. The operator has suspended hailing into the location until fixed. Status: will continue to monitor.
1399315091 2014-05-05 Surface Facility Construction No Violations The plastic 1000 gallon tank for the vault has been buried and staked into place. Status: the well has been placed back into service.
1399921094 2014-05-12 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage, vault and identification. The operator has delivered a tool shed to location (as per approved plan). Status: the well is in operation. Ok.
1400849779 2014-05-23 Brine Hauler No Violations Inspection Mullins Energy Services brine truck unloading at the Dumbaugh disposal well. Truck #2, License number (OH) PHX-6360. Brine and UIC # 25-538 and other identification clearly and properly marked. Status: ok.
1403028110 2014-06-17 Salt Water Injection Well No Violations The operator has painted the two fiberglass storage tanks and the tool shed, cream colored. Graded around the unloading pad and added stone to the location. Status: ok.
1423513105 2015-02-09 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
1475160981 2016-09-19 Brine Hauler No Violations Inspect brine truck for Mullins Energy Service UIC25-538. Log book and placarding are in compliance. Collect brine sample TSB111 for chemical analysis. Source for the water is the Hohl #1 (3411722340) owned by Geopetro LLC.
1513460456 2018-08-23 Brine Hauler No Violations Inspect Mullins Energy Service UIC 25-538. Placarding and log book are in compliance. Collect water sample TSB220 for analysis.
1513780700 2017-12-18 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, storage and identification. Status: ok.
1519140209 2018-02-12 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
1563323603 2014-02-13 Salt Water Injection Well No Violations Inspected well and location. Operator installed two pen continuous chart recorder on the well head injection line and well head annulus. Operator was allowed to begin injection of production water into well.
1565996877 2017-09-15 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Check well, storage and identification. Status: ok.
1579681168 2015-07-16 Salt Water Injection Well No Violations Check dike water for chloride content: 377 ppm.
1662613009 2015-12-08 Salt Water Injection Well No Violations Inspect well and tanks. Measure injection pressure and tubing pressure.
1663936202 2014-04-17 Surface Facility Construction No Violations Inspect well and facility. The concrete pad has been poured. The second 210 fiberglass barrel storage tank has been delivered and is on location.
1669629752 2014-05-23 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, vault, storage and identification. Status: ok.
1675740309 2013-12-19 Salt Water Injection Well No Violations On-site with Inspector Benko for pressure test. 12:55 pm hook up Timco oil field services truck and pressured up annulus to 460 psi. 15 minute pressure 440 psi: passed mechanical integrity test.
1812591752 2018-06-05 Salt Water Injection Well No Violations Inspect well for pressure and integrity.
1930738752 2016-10-05 Salt Water Injection Well No Violations Inspect well for integrity and pressure.
1943435551 2017-07-24 Salt Water Injection Well No Violations Inspect well for integrity and pressure. Mullins Energy Service UIC 25-538 brine truck unloading water from the Beer 3A (3413920539); collected water sample and measured specific gravity at 1.25 units. Upon unloading driver began to evacuate accumulated rain water from dike area for injection into well.
1954442501 2010-12-16 Drill / Deepen / Reopen No Violations Drilling rig shut down, no one at the site.
1962499648 2014-07-30 Salt Water Injection Well No Violations Inspect well for integrity and pressure. The injection line has a strong vacuum. The annulus had a slight vacuum. Operator reported that he pressure tests the well at 500 psi each month and the well passes the test. Requested to be present at the next monthly test.
2001359807 2011-03-11 Administrative Inspection No Violations Received a verbal complaint from Dan Rogers at Twp Rd 115 on January 13, 2011, reporting cloudy water from water well initiated during the time frame for drilling of this oil well. Water well driller was removing pump and surging well to develop, on 1/13/2011. It was determined that the water well had collapsed and was not related to the oil well drilling operation. Complaint was resolved per the landowner.
2036411223 2015-05-07 Salt Water Injection Well No Violations Inspected the Dumbaugh #1 (SWIW #64) as part of a standard injection well status check. Inspect well, pressures, storage and identification. Status: ok.
2126399771 2017-06-26 Brine Hauler No Violations Inspect Mullins Energy Service Truck UIC 25-538. The log book and truck placarding are in compliance. Collect Brine sample TSB-127 from side discharge port for chemical analysis. The source water is the Hohl #1 API #3411722340 owned by Houghton Investments, LLC. The pH was measured at 5, >1% NaCl, and specific gravity measured at 1.18 units. The source water is delivered to National Lime and Stone on State Rout 95 to be spread on grit for ice control in the winter.

For data sources see[1]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-01-25 H2O 15 2550 Gal 0 Producers Service Corporation
2011-01-19 ACID 15 500 Bbl 0 Producers Service Corporation

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-07-07 Proposed Formations:TREMPEALEAU, Issued Date:7/7/2010, Expired Date:7/7/2011 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2011-01-08 WELL PERMITTED TO BE CONVERTED TO INJECTION ON JULY 18, 2013 - TET
Completion Report Received 2011-02-08 WELL PERMITTED TO BE CONVERTED TO INJECTION ON JULY 18, 2013 - TET
APP 2013-07-18 Proposed Formations:TREMPEALEAU, Issued Date:7/18/2013, Expired Date:7/18/2015 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:SWD, Proposed Well Class:SWIW
Correction to Well 2013-08-16 CORRECTION TO SURFACE FOOTAGE.
Annulus Pressure Monitoring Approved 2013-12-13 WELL PERMITTED TO BE CONVERTED TO INJECTION ON JULY 18, 2013 - TET
Last Compliance Report 2013-12-30 WELL PERMITTED TO BE CONVERTED TO INJECTION ON JULY 18, 2013 - TET
First Injection 2014-02-13 WELL PERMITTED TO BE CONVERTED TO INJECTION ON JULY 18, 2013 - TET
Construction Permit Expires 2015-07-18 WELL PERMITTED TO BE CONVERTED TO INJECTION ON JULY 18, 2013 - TET
Record Last Modified 2015-09-24 WELL PERMITTED TO BE CONVERTED TO INJECTION ON JULY 18, 2013 - TET

For data sources see[1]

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "RBDMS". Ohio Department of Natural Resources. 2019-05-07. Retrieved 2019-05-21. 
  2. 2.0 2.1 "Ohio Combined Annual Production Data". Ohio Department of Natural Resources. 2019-05-07. Retrieved 2019-05-21.