If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-24598 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Falls | |
Operator Name: HOPEWELL OIL & GAS DEVELOPMENT | |
Well Pad ID: | |
Farm/Lease Name: SLETZER | |
License Status: Final Restoration | |
License Date: 2004-12-20 | |
Spud Date: 1979-01-09 | |
Spud Drilling Contractor: | |
Final Drill Date: 1979-03-04 | |
Well Total Depth: 3594 ft | |
Configuration: Vertical | |
Latitude: 39.946228560 | |
Longitude: -82.09166792 |
For data sources see[1]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3513 | 3548 | 22 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | LYDIC W J INC | 5144 | 0 | 0 |
1985 | LYDIC W J INC | 8244 | 0 | 365 |
1986 | LYDIC W J INC | 6725 | 0 | 365 |
1987 | LYDIC W J INC | 4392 | 0 | 365 |
1988 | LYDIC W J INC | 3785 | 0 | 365 |
1989 | LYDIC W J INC | 3244 | 0 | 0 |
1990 | LYDIC W J INC | 2364 | 0 | 365 |
1991 | LYDIC W J INC | 971 | 0 | 365 |
1992 | LYDIC W J INC | 722 | 0 | 275 |
1993 | LYDIC W J INC | 4384 | 0 | 0 |
1994 | LYDIC W J INC | 2483 | 0 | 365 |
1995 | LYDIC W J INC | 1284 | 0 | 0 |
1996 | HOPEWELL OIL & GAS DEVELOPMENT | 231 | 0 | 62 |
1997 | HOPEWELL OIL & GAS DEVELOPMENT | 1343 | 0 | 365 |
1998 | HOPEWELL OIL & GAS DEVELOPMENT | 305 | 0 | 365 |
1999 | HOPEWELL OIL & GAS DEVELOPMENT | 0 | 0 | 0 |
2001 | HOPEWELL OIL & GAS DEVELOPMENT | 0 | 0 | 0 |
2002 | HOPEWELL OIL & GAS DEVELOPMENT | 0 | 0 | 365 |
2003 | HOPEWELL OIL & GAS DEVELOPMENT | 0 | 0 | 365 |
2004 | HOPEWELL OIL & GAS DEVELOPMENT | 0 | 0 | 365 |
2005 | HOPEWELL OIL & GAS DEVELOPMENT | 0 | 0 | 365 |
2006 | HOPEWELL OIL & GAS DEVELOPMENT | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | LYDIC W J INC | Brine | 0 | 0 |
1985 | LYDIC W J INC | Brine | 0 | 365 |
1986 | LYDIC W J INC | Brine | 0 | 365 |
1987 | LYDIC W J INC | Brine | 0 | 365 |
1988 | LYDIC W J INC | Brine | 10 | 365 |
1989 | LYDIC W J INC | Brine | 0 | 0 |
1990 | LYDIC W J INC | Brine | 0 | 365 |
1991 | LYDIC W J INC | Brine | 70 | 365 |
1992 | LYDIC W J INC | Brine | 0 | 275 |
1993 | LYDIC W J INC | Brine | 0 | 0 |
1994 | LYDIC W J INC | Brine | 70 | 365 |
1995 | LYDIC W J INC | Brine | 210 | 0 |
1996 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 62 |
1997 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 35 | 365 |
1998 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
1999 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | |
2001 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
2002 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2003 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2004 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2005 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
2006 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0582639709 | 2016-03-14 | Final Restoration | No Violations | My inspection today is on a location with the RBDMS status of Final Restoration. During my inspection I was assisted by the state issued Garmin GPS handheld and the coordinates listed in RBDMS. I could not locate any evidence of an oil and gas well within the area of the given coordinates. RBDMS records show the final restoration was passed in 2004. |
0638179192 | 2004-12-20 | Final Restoration | No Violations |
For data sources see[1]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | 600# ' W WAC 10 500 SKS. SAND |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1978-12-26 | 171 LYDIC W J INC GeoDate 12/26/78 |
Original Spud | 1979-01-09 | |
Completed | 1979-03-04 | |
Reached Total Depth | 1979-03-04 | |
CO | 1996-07-31 | 1 HOPEWELL OIL & GAS DEV CO GeoDate 12/26/78 |
APP | 2001-03-14 | Proposed Formations:CLINTON, Issued Date:3/14/2001, Expired Date:3/14/2002 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
APP | 2004-07-21 | Proposed Formations:CLINTON, Issued Date:7/21/2004, Expired Date:7/21/2005 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2004-08-19 | |
Construction Permit Expires | 2005-07-21 | |
Record Last Modified | 2013-03-14 |
For data sources see[1]