If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-28781 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.82155703,"lon":-81.83439159,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Blue rock | |
Operator Name: JHC II LLC | |
Well Pad ID: | |
Farm/Lease Name: L.K. OSBORN | |
License Status: Producing | |
License Date: 2015-02-27 | |
Spud Date: 2013-10-25 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2013-11-09 | |
Well Total Depth: 6846 ft | |
Configuration: Vertical | |
Latitude: 39.821557030 | |
Longitude: -81.83439159 |
For data sources see[1]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-02-27 | 6673 | 6753 | 53 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ARTEX OIL COMPANY | 3138 | 45 | 365 |
2015 | JHC II LLC | 0 | 0 | 365 |
2016 | JHC II LLC | 34 | 0 | 365 |
2017 | JHC II LLC | 0 | 0 | 365 |
2018 | JHC II LLC | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ARTEX OIL COMPANY | Brine | 3692 | 365 |
2015 | ARTEX OIL COMPANY | Brine | 1236 | 365 |
2016 | JHC II LLC | Brine | 0 | 365 |
2017 | JHC II LLC | Brine | 0 | 365 |
2018 | JHC II LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0034780185 | 2013-11-04 | Drill / Deepen / Reopen | No Violations | Killbarger rig 17 is at depth of 5457 in the Queenston. They made a bit trip at 4724 and installed a PDC bit. 0 PPM of H2S was encountered. |
0445648544 | 2013-10-29 | Casing String Witnessed | No Violations | Killbarger rig 17 ran 8.625casing to depth of 1536 of 23lb/ft range 3 casing. The 11 open hole was drilled to depth of 1576. No centrilizers. Ran shoe and placed insert at 1494. Universal ran 250 sacks in lead of Class A cement with 2%gel and 2%CaCl with 1/3 lb of cello flake per sack. The tail is 150 sacks of Class A cement at 3%CaCl and 1/3 lb per sack of cello flake. |
0682851514 | 2013-11-08 | Casing String Witnessed | No Violations | Killbargers rig 17 drilled a 7.875 open hole with a drillers depth of 6846. The loggers total depth is at 6851. Artex set range 3 pipe at total depth of 6830. The shoe and baffle was ran. Centrilizers were ran at joint 1, 3 , 7 , 9 , 11 , 13. Universal ran 150 sacks of Regular Class A cement at 10%salt, 2lb /sack of W-60, .5% CFL-2, .5% of TI-2. 800 of fill up was ran. |
0777292181 | 2013-10-15 | Drill / Deepen / Reopen | No Violations | I met with Artex on site. There was an issue about old casing at edge of pad. The company would run tubing in and cemented back to surface. The casing was 4.5and did not match up with no old well. Columbus confirmed this with the coordinates of 39.82136, -81.83427. |
1049412694 | 2014-10-20 | Preliminary Restoration | No Violations | Preliminary Restoration passed on 10-20-14 by Patrick Shreve. |
1394550109 | 2014-03-10 | Preliminary Restoration | No Violations | Artex has pit open and checked chlorides and they were at 400 pppm. The pit was squeezed out once and filled up with ice and fresh water. Weather permitting they will start drilling in Morgan county and utilize the water for the rig. They will then reclaim the site. The pit will be monitored until then. Preliminary restoration did not pass on day of inspection. |
1397487642 | 2014-04-14 | Preliminary Restoration | No Violations | Preliminary Restoration did not pass on 4-14-14. The pit is open with rain water present. There are 2-500 barrel tanks that are on site for placing water and closing the pit. The reclamation will be completed then by company. I taked to Company and they stated that by the 1st of May they will be reclaiming site. |
For data sources see[1]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-11-20 | ACID | 15 | 11800 Gal | 0 | Producers Service Corporation |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-03-14 | Proposed Formations:KNOX, Issued Date:3/14/2013, Expired Date:3/14/2015 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2013-11-09 | |
Completion Report Received | 2014-06-30 | |
Construction Permit Expires | 2015-03-14 | |
Change of Owner | 2015-10-26 | Operator changed from 5352, ARTEX OIL COMPANY to 6224, JHC II LLC |
Record Last Modified | 2017-10-23 |
For data sources see[1]