X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-149-20055

Well Details

Well ID: 34-149-20055
Loading map...
Country: United States
State: Ohio
County: Shelby
Municipality: Clinton Township
Operator Name: COLUMBUS OILFIELD EXPL. CO.
Well Pad ID:
Farm/Lease Name: STOLLE CORP
License Status: Final Restoration
License Date: 2007-03-07
Spud Date: 1976-11-15
Spud Drilling Contractor: FITZGERALD DRLG
Final Drill Date: 1976-12-09
Well Total Depth: 1323 ft
Configuration: Vertical
Latitude: 40.279880281
Longitude: -84.20349471

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1976-09-08 698 WRIGHT LARRY H INC GeoDate 9/8/76
Original Spud 1976-11-15
Completed 1976-12-09
Reached Total Depth 1976-12-09
Change of Owner 1999-09-23 Operator changed from 698, WRIGHT LARRY H INC to 3069, MURNANE JOSEPH M
APP 2006-03-02 Proposed Formations:TRENTON, Issued Date:3/2/2006, Expired Date:3/2/2007 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:
APP 2007-03-05 Proposed Formations:TRENTON, Issued Date:3/5/2007, Expired Date:3/4/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2007-03-07
Construction Permit Expires 2008-03-04
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 1299 1323 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
NITR 0 80 Qts 0
Not Treated 0 80 Qts 0 360# WELLHEAD PRESS.

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL5671 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0001210i83 2002-02-07 Production Wells Violations Noted Gas well. All valves closed. No ID. Plug well or place into production. Well meets preliminary restoration requirements. Accompanied by Rich P.& Mike M.
0001210i88 2002-02-07 Preliminary Restoration No Violations Passed PR.
00CENT2869 1998-08-24 Preliminary Restoration No Violations 1501:9-9-05
0276378106 2002-02-07 Production Wells No Violations FOLLOW UP TO NOV # 1210i83 Gas well. All valves closed. No ID. Plug well or place into production. Well meets preliminary restoration requirements. Accompanied by Rich P.& Mike M.
0375947741 2004-02-18 Production Wells No Violations -On site for status check of the well. Accompanied by Jeff Fry and Mike Mitchell. Site inspected on 2/7/02 with Jeff Fry when oil/gas wells in the county were assigned to Sam Faust. N.O.V. was issued 2/14/02 by Jeff Fry for the well being incapable of production and the well not indentified.

-Well still not plugged. No record of production submitted since the permit was drilled. No identification noted. Meeting held with Charles M. Cole in November 2003 at the Bellefontaine office. Charles was looking to purchase the property in December 2003 and came in to inquire about the well. To date, we have not heard from Mr. Cole and do no know if he purchased the property. Will check with Jeff Fry on any additional action to be taken for non-compliance with the N.O.V.

1145363021 2006-04-11 Production Wells No Violations -On site for status check and to take digital photos of the well. Well plugging permit issued 3/2/06. Talked to Bob Wray of Circleville Gas Co. on 3/13/06. Bob has been hired by Mike Murnane (well owner) to plug the well. Well still has not been ID and is not capable of production. N.O.V. was issued by Jeff Fry on 2/14/02 for well not IDed and incapable of production. Meeting held in Nov. 2003 at the former Bellefontaine office with Charles Cole who was considering purchasing the property where the well is located.
1173887070 2007-03-05 Production Wells No Violations On site for NOV follow-up and to meet with David Barntz, Bob Harpster, & Ben Harpster of Clearwater Energy hired by well owner Joe (Mike) Murnane, Columbus Oilfield Explor. Co. to plug the well. Plugging permit issued 3/2/06 & expired 3/2/07. Received VM message from Dave Barntz on 3/4/07 that he planned to open the well on 3/5/07 and planned to begin plugging on 3/6/07. Notified Jeff Fry that well had expired. Called Dave in the morning of 3/5 and he indicated he overnighted a $ 300 check to Columbus on 3/1/07 for a rush permit. Jeff Fry called back & said no plugging permit in and Barntz must wait until permit is issued. He could open up the well. While in Shelby Co. for mining permit amend mtg & inspection, received call that rush permit was issued. Stopped by the site and pluggers were opening the well up. Said they had 200 lbs of pressue on gauge when hole opened. Also indicated there was a 1.5 inch production line in hole. Pluggers indicate they planned to start plugging on Tuesday, 3/6/07 and finish on Wednesday 3/7/07. Photos taken of the site.
1173894454 2007-03-06 Plug / Plug Back No Violations On site for beginning of the well plugging. Joint inspection with Jeff Fry. Clearwater Energy is plugging the well. David Barntz, Bob Harpster, & Ben Harpster of the company hired by Joe (Mike) Murnane of Columbus Oilfield Explor. Co. to plug the well. Well permit indicated that there is 92 feet of 10 inch casing and 367 feet of 7 inch casing. Dave indicated they also pulled 1287 feet of the 1.5 inch production tubing. 6.5 cubic yards of 9 sack grout ordered, with calcium cloride and hot water from Ernst Concrete. Based on measurements, that should fill hole to about 400 below surface. 6.5 cubic yards put down the well. Based on calculations from Jeff Fry, only about 150 feet of the 7 casing could be recovered if it was ripped and removed. Jeff gave approval to leave the 7 inch. Well still gassing when 6.5 cubic yds pumped down the well. Well shut off and planned to be filled on 3/7/07. Photos taken of the work. Well is dry and no fluids returned when plugging started. Some of the production equipment and debris removed. Landowner Charley Coles was at the site during a portion of the plugging.
1173897061 2007-03-07 Final Restoration No Violations On site for final plugging & restoration. NOV issued in 2002: well incapable of production & not IDed. Clearwater Energy hired by well owner Joe (Mike) Murnane of Columbus Oilfield Explor. Co. Met with David Barntz, Bob & Ben Harpseter. Operator added 6.5 cu yds of 9 sack grout w/ calcium chloride on 3/6/07. Well with the 6.5 cubic yards already in was measured on 3/7/07 & was 1500 ft in depth . It shouldpe have been about 400 ft below the surface in the 7 casing. Dave & Bob thought the well was deepened in the past w/out the state being notified. Actual depth of well unknown. 5 cu yds of 9 sack grout w/ calcium chloride and hot water added. Hole dug out, casing cut, & cement allowed to gravity feed w/ some between 7 and 10 casing. When depth measured, cement was at 56 feet from the top. Ben Harpster calculated that well was drilled deeper with 4 casing. Addl 2 cu yds of 9 sack grout ordered, hole filled, plate with well ID added. Hole around well filled with dirt and graded out, all remaining debris removed & final restortation complete. Charley Cole-landowner on site. Photos taken.
1210i17573 2002-04-03 Production Wells No Violations NOV due 03/20/02, non compliance. Same violations as of inspection 02/07/02. Took 2 digital photos.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0001210i83 US-OH-105522 2002-02-14 Failure to legibly identify well
0001210i83 US-OH-105523 2002-02-14 Well shall be plugged

For data sources see[5]

References