If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24541 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.676313091,"lon":-81.1887259,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Washington Township | |
Operator Name: GULFPORT ENERGY CORPORATION | |
Well Pad ID: 000472 | |
Farm/Lease Name: GARY GREEN N WSH MN | |
License Status: Producing | |
License Date: 2017-08-23 | |
Spud Date: 2013-12-27 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-12-08 | |
Well Total Depth: 15235 ft | |
Configuration: Horizontal | |
Latitude: 39.676313091 | |
Longitude: -81.18872590 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-11-20 | Proposed Formations:POINT PLEASANT, Issued Date:11/20/2014, Expired Date:11/19/2016 12:00:00 PM, Drilling unit acres:524.579, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-12-08 | |
Change of Owner | 2015-07-30 | Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 8799, GULFPORT ENERGY CORPORATION |
Construction Permit Expires | 2016-11-19 | |
Completion Report Received | 2018-06-25 | |
Record Last Modified | 2018-07-09 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-03-08 | 9468 | 9615 | 5 |
2018-03-08 | 14951 | 15098 | 5 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/18/2017 | 02/26/2017 | 9092 | 8,690,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | B-84 | X-Chem | Biocide | n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride | 68424-85-1 | 10 | 0.00329101 | 2672.42 |
Ethanol | 64-17-5 | 5 | 0.0016455 | 1336.21 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10 | 0.00329101 | 2672.42 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00987302 | 8017.26 | ||||
SC-30 | X-Chem | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 1.5 | 0.000302609 | 245.73 | |
28% HCl Acid | X-Chem | ACID | WATER | 7732-18-5 | 100 | 0.215003 | 174591 | |
HYDROCHLORIC ACID | 7647-01-0 | 32 | 0.0688011 | 55869 | ||||
40/70 white sand | Muskie | PROPPING AGENT | CRYSTALLINE SILICA IN THE FORM OF QUARTZ | 14808-60-7 | 100 | 9.58602 | 7,784,200.0 | |
NEFE-210 | X-Chem | Acid Non-Emulsifier and Iron Control | Cocamide DEA | 68603-42-9 | 5 | 0.00006664 | 54.113 | |
Acetic acid | 64-19-7 | 65 | 0.000866304 | 703.471 | ||||
Tall oil fatty acid | 61790-12-3 | 5 | 0.00006664 | 54.113 | ||||
2-Ethyl hexanol | 104-76-7 | 10 | 0.000133278 | 108.226 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00006664 | 54.113 | ||||
Methyl alcohol | 67-56-1 | 35 | 0.000466471 | 378.792 | ||||
Propargyl alcohol | 107-19-7 | 5 | 0.00006664 | 54.113 | ||||
SFR-470 | X-Chem | Friction Reducer | Alcohols, C12-14, ethoxylated | 68439-50-9 | 1.5 | 0.00128884 | 1046.59 | |
Alcohols, C10-16, ethoxylated | 68002-97-1 | 1.5 | 0.00128884 | 1046.59 | ||||
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0257769 | 20931.8 | ||||
Ammonium chloride | 12125-02-9 | 13 | 0.01117 | 9070.43 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.00128884 | 1046.59 | ||||
Water | Gulfport | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.306 | 72,519,700.0 | |
100 mesh sand | Muskie | PROPPING AGENT | CRYSTALLINE SILICA | 14808-60-7 | 100 | 0.752675 | 611200 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Didecyl dimethyl ammonium chloride | 7173-51-5 | 10 | 0.00329101 | 2672.42 | |
Ammonium chloride | 12125-02-9 | 13 | 0.01117 | 9070.43 | ||||
Ethanol | 64-17-5 | 5 | 0.0016455 | 1336.21 | ||||
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride | 68424-85-1 | 10 | 0.00329101 | 2672.42 | ||||
Cocamide DEA | 68603-42-9 | 5 | 0.00006664 | 54.113 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 1.5 | 0.00128884 | 1046.59 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 1.5 | 0.00128884 | 1046.59 | ||||
WATER | 7732-18-5 | 100 | 0.215003 | 174591 | ||||
Propargyl alcohol | 107-19-7 | 5 | 0.00006664 | 54.113 | ||||
2-Ethyl hexanol | 104-76-7 | 10 | 0.000133278 | 108.226 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.00128884 | 1046.59 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00006664 | 54.113 | ||||
Methyl alcohol | 67-56-1 | 35 | 0.000466471 | 378.792 | ||||
Tall oil fatty acid | 61790-12-3 | 5 | 0.00006664 | 54.113 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-02-18 | H2O | 15 | 6672 Bbl | 264060 | EVOLUTION WELL SERVICE | STAGE 1/31
STAGES 2-30 SEE IMAGES |
2017-02-25 | H2O | 15 | 6855 Bbl | 275510 | EVOLUTION WELL SERVICE | STAGE 31/31
STAGES 2-30 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | GULFPORT ENERGY CORPORATION | 1450838 | 0 | 211 |
2018 | GULFPORT ENERGY CORPORATION | 715062 | 0 | 361 |
2019 | GULFPORT ENERGY CORPORATION | 120096 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | GULFPORT ENERGY CORPORATION | Brine | 25493 | 211 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 10131 | 361 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 1667 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0006517995 | 2017-04-10 | Completion Testing | No Violations | Status check inspection on the well stimulation process found the well stimulation process complete with Evolution Energy Service completion service still present on location. Nine Energy wireline service has set a total of 3 isolation plugs above the area stimulated with the last plug being set under hydrostatic pressure only at a depth of 9,206. |
0380213967 | 2018-03-05 | Production Wells | No Violations | Producing well status check inspection found the well head designed to produce from the tubing well head above the B-Section and casing head section. In the tubing section vertically there is a total of (2) manually operated valves then the tubing flow cross, attached to the tubing flow cross downstream is a third manual valve then a Emergency Shut Down (ESD) valve with remotely controlled switches at multiple locations on location including at the well head and gas processing units along with the production facility and entry point of the location. On location there is a total of (6) active well heads with annular pressure monitoring in place on each well head. The said well has annular pressure gauges in place with the valves in the open position. The annular pressure between the 13.375 casing and 9.625casing reads 300 psi and between the 9.625 casing and the 5.5 casing 1,000 psi. Addressing the well support equipment on location- at the entry point of the location is a midstream operation operated by EQT Company, on the left hand side of the well pad is a total of (6) gas processing units one each for every active well on the pad. At the left rear corner of the well pad is the production facility consisting of a total of (4) steel construction tanks each with a total fluid volume of 400 barrels capacity, the tanks are situated inside a polymer lined steel containment dike area. The well pad does have a perimeter earthen berm. Proper well identification is posted at the each well and the tank battery as well as the entry point of the lease road and well pad. |
0549780558 | 2018-03-05 | Production Wells | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The lease road is gated and an EQT midstream production facility is situated on the righthand side, prior to the well pad. There is an emergency shutdown button on the left, at the entrance. The well is equipped with annular pressure monitoring and an emergency shutdown button is located at the wellhead. There are (6) gas processing units on the left of the pad, and all are equipped with an emergency shutdown button. At the backside of the pad are (4) 400 barrel steel tanks within containment. |
0788580245 | 2017-06-27 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is in good repair and graveled from County Road 12 to the well pad. There is a midstream distribution sales point located on the South East side of the well pad near the well pad entry point, Rice Energy is the Mid Stream operator and there is a glycol dehydration unit present on the mid stream site. Situated on the well pad is a total of( 6) wells all now in production with production trees in place and the well head production valves in the open position. The wells are all equipped with annular monitoring pressure gauges. The wells are selling into gas processing units with a total of (6 )gas processing units on location one for each well. Also present on the West side of the well pad is the production fluid storage area consisting of a total of (4) steel construction 400 barrel capacity production tanks located inside a polymer lined steel containment dike area. The pumper is on site and has indicted they are shipping 2,100 barrels of production flow back fluid per every 24 hours. Identification is posted at each well and at the end of the lease road. Safety shut down points are at each well along with at the production facility and well pad entry point. |
1418190329 | 2014-12-09 | Drill / Deepen / Reopen | No Violations | The said well was spudded on 12/27/2013 by HG Energy as 3411124428. American Energy acquired the lease property and completed the drilling process by drilling the intermediate section and production borehole with a total depth drilled of 15,281 in the directional azimuth of 304 degrees. |
For data sources see[10]