If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24578 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.84694549,"lon":-81.24567349,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: 001235 | |
Farm/Lease Name: DELONG UNIT | |
License Status: Producing | |
License Date: 2016-01-22 | |
Spud Date: 2015-03-24 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-06-27 | |
Well Total Depth: 17214 ft | |
Configuration: Horizontal | |
Latitude: 39.846945490 | |
Longitude: -81.24567349 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-03-05 | Proposed Formations:POINT PLEASANT, Issued Date:3/5/2015, Expired Date:3/4/2017 12:00:00 PM, Drilling unit acres:610.165, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2015-06-27 | |
Completion Report Received | 2016-01-22 | |
Construction Permit Expires | 2017-03-04 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-01-22 | 8596 | 17128 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/05/2015 | 09/16/2015 | 8390 | 12,990,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WFRA-405 | U.S. Well Services | Friction Reducer | Sodium Chloride | 7647-14-5 | 20 | 0.01712 | 20423 |
Petroleum Distillates | 64742-47-8 | 20 | 0.01378 | 16440.5 | ||||
Ethoxylated alcohol blend | Proprietary | 5 | 0.00428 | 5105.75 | ||||
Water | 7732-18-5 | 40 | 0.03423 | 40846 | ||||
Anionic Polyacrylamide | Proprietary | 40 | 0.03423 | 40846 | ||||
AI-301 | U.S. Well Services | Acid Corrosion Inhibitors | Coco amine | 61791-14-8 | 5 | 0.00003000 | 32.6094 | |
Diethylene Glycol | 111-46-6 | 30 | 0.0002 | 237.978 | ||||
Hydrogen Chloride | 7647-01-0 | 10 | 0.00007000 | 82.2324 | ||||
Methenamine | 100-97-0 | 20 | 0.00016 | 188.567 | ||||
Polyethylene polyamine | 68603-67-8 | 10 | 0.00006000 | 71.3862 | ||||
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00426 | 5077.63 | |
Deionized Water | 7732-18-5 | 28 | 0.00243 | 2900.32 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 18 | 0.06166 | 73573.8 | |
Water | 7732-18-5 | 87.5 | 0.25813 | 308011 | ||||
SI-1100 | U.S. Well Services | Scale Inhibitor | Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00147 | 1758.62 | |
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00032 | 387.493 | ||||
Ethylene Glycol | 107-21-1 | 25 | 0.00353 | 4210.26 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.00081 | 968.733 | ||||
Water | 7732-18-5 | 80 | 0.00999 | 11922.9 | ||||
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.00081 | 968.733 | ||||
Potassium salt of diethylene triamine penta (methylene phosphonic acid) | 15827-60-8 | 7.5 | 0.00126 | 1508.99 | ||||
LGC-15 | U.S. Well Services | Gelling Agents | Suspending agent (solid) | 14808-60-7 | 3 | 0.00698 | 8327.31 | |
Petroleum Distillates | 64742-47-8 | 60 | 0.04321 | 51565.2 | ||||
Guar Gum | 9000-30-0 | 50 | 0.04563 | 54447.8 | ||||
Surfactant | 68439-51-0 | 3 | 0.00274 | 3266.87 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 90.7945 | 108,340,000.0 | |
AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00173 | 2070 | |
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 8.65636 | 10,329,100.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-09-10 | H2O | 0 | 5910 Bbl | 232120 | US Well Services Inc | Status check inspection on the well stimulation process found US Well Service on location stimulating stage 21. With the annular pressure being monitored electronically. Renegade wireline service is on location and has perforated the stage with 60 shots in 6 clusters. Bass Well head is providing well head control. |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 560215 | 423 | 61 |
2016 | ANTERO RESOURCES CORPORATION | 2808457 | 494 | 350 |
2017 | ANTERO RESOURCES CORPORATION | 947239 | 186 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 564464 | 200 | 363 |
2019 | ANTERO RESOURCES CORPORATION | 94703 | 72 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 13057 | 61 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 44726 | 350 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 6313 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 5535 | 363 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 2357 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0051916300 | 2015-11-23 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection finds the area affected by the well pad construction has been restored with erosion control and vegetation being established and in place. Addressing the well head-Upon inspection of the well it was observed that the drilling and well completion process is now complete with the well being flow tested and capable of production. The company has erected a tank battery consisting of a total of 8 tanks of 400 barrel capacity located inside of a polymer lined metal containment dike area. Proper well identification is posted. |
0166255400 | 2017-07-17 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with erosion control and vegetation established in the affected area of the well pad. There are (4) producing wells on the pad with the productin valves open and the wells selling to gas processing units with (4) units on location. Supporting the gas processing units are (8) steel production tanks that are 400 barrel cepacity with the tanks all situated inside a polyment lined steel containment dike area. Proper well identification is posted. |
0205929701 | 2017-12-29 | Production Wells | No Violations | Status check inspection found the well head equipped with a casing and tubing well head with both the casing and tubing well head production valves open and feeding into a production sales line that leads to a gas processing unit on location near the well head. Annular pressure monitoring gauges are present on the well head. There is a total of 4 completed wells on the location along with 4 gas processing units and 8 -400 barrel capacity steel construction production tanks. The well pad has a earthen berm perimeter and the well pad surface is of stone construction. The lease road is gravel construction and in good repair. |
0751291261 | 2015-06-25 | Drill / Deepen / Reopen | No Violations | The said well total measured drilling depth was reached on 06/23/2015 at 17,214 in the directional azmuith of 313 degrees with a True Vertical Depth of 8,390. |
1149517416 | 2015-09-10 | Completion Testing | No Violations | Status check inspection on the well stimulation process found US Well Service on location stimulating stage 21. With the annular pressure being monitored electronically. Renegade wireline service is on location and has perforated the stage with 60 shots in 6 clusters. Bass Well head is providing well head control. |
1298054741 | 2019-01-24 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (4) producing wells, (4) gas processing units (GPU), (2) 400-barrel steel production tanks within polymer lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Additionally, concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 100 psi. |
1427268637 | 2015-03-25 | Casing String Witnessed | No Violations | On site inspection for a 3:00 am call out to witness the conductor cement job found the following. The said well was spudded on 03/24/2015 by Rocky Mountain Drillings top hole rig with a 32 x 100 conductor borehole being drilled and 100 of 26 weld connection conductor being set. Express Energy Cement service cemented the conductor using 330 sacks of class A-2% calcium .125 pps lcm -100% open hole excess cement displaced with 55 bbl of fresh water with good cement returns witnessed to surface. |
1430051339 | 2015-04-25 | Casing String Witnessed | No Violations | On site to witness running&cementing of surface casing string,Patterson Rig 342 drilled to a depth of 1255 (17.5hole) and then ran 1255 of 13.375 casing and Halliburton cemented it in place with 1270 sacks of cement which weighed 15.6# per gal with a yield of 1.21 and they had 87 bbl of good cement returns and cement stayed up good. |
1430827638 | 2015-05-05 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling process found Patterson Drilling rig 342 on location with the 12.250 intermediate recently drilled to a depth of 7767 and 7747 of 9.625 was ran and set in the wellbore, Halliburton Cement service cemented the casing using a 930 sack ExpandaCem lead cement and a 33 sack HalCem tail cement with 16 bbls of the Tergovis spacer returned to surface and a estimated top of cement at 154. |
1434971160 | 2015-06-22 | Plug / Plug Back | No Violations | On 06/20/2015 it was reported by the company man on site that while administering the Formation Integrity test out from under the 9.625 casing string in the 8.750 open hole well bore section it was discovered that the formation would only stand a 13.4# mud weight before breaking down below the 9.625 casing shoe. The open hole total measured depth was 7,635 and a Class H -147 sack 16.35 # plug was set through the 5 19.5 # drill string ran to bottom. The company then waited 48 hours on the cement to cure before going back in to begin to re drill and retest the well bore. My Supervisor Brent Bear was updated on the situation. |
1434988932 | 2015-06-22 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling process found Patterson Drilling rig # 342 on location drilling the 8.750 production borehole at a current measured depth of 13,600 in the horizontal well bore section in the directional azimuth of 332.59 degrees with a borehole inclination of 91.14 degrees and true vertical depth of 8,337. |
For data sources see[10]