34-067-21079

Well Details

Well ID: 34-067-21079
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Rumley Township
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID: 000330
Farm/Lease Name: GOTSHALL 14-12-5
License Status: Plugged Back
License Date: 2012-09-27
Spud Date: 2012-07-29
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2012-08-12
Well Total Depth: 8413 ft
Configuration: Vertical
Latitude: 40.406310078
Longitude: -81.03482257

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-06-15 Proposed Formations:TRENTON BLACK RIVER, Issued Date:6/15/2012, Expired Date:6/15/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2012-08-12
Completion Report Received 2012-09-21
End of Confidential Data 2013-08-12
Construction Permit Expires 2014-06-15
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-02-06 8304 13657 400

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/23/2012 11/23/2012 8297.00 4,050,018.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 5.00
LT Encapsulated AP Breaker (LTB01) FTS International Breaker Quartz 14808-60-7 25.00 0.03
Peroxydisulfuric acid, diammonium salt 7727-54-0 100.00 0.12
Sodium Metaborate Tetrahydrate
0.00379
INTERNATI ONAL
010555-76-7
Anti-Bacterial Agent
000111-76-2
Boric Acid
Cross Linker
CI-150 (Corrosion Inhibitor) FTS International Corrosion Inhibitor Proprietary Quaternary Ammonium Compound 10.00 0.00011000
N,N-Dimethylformamide 68-12-2 10.00 0.00011000
Isopropanol 67-63-0 60.00 0.00067000
Proprietary Aromatic Aldehyde 10.00 0.00011000
Proprietary Organic Amine Resin Salt 30.00 0.00033000
Ammonium Persulfate
HVG-01
0.01130
Dodecylbenzenesulfonic Acid Potassium Carbonate Potassium Hydroxid

Dodecylbenzenesulfonic Acid Potassium Carbonate Potassium Hydroxide

0.00207
000067-63-0
Gelling Agent
pH Adjusting Agent
26.00
0.00174
Fresh Water Carrier/Base Fluid 76.32
No Hazardous Components
FTS
NE-100 (NON-EMULSIFIER)
B10 (HIGH PH BUFFER)
Isopropanol
Breaker
48.00
0.00542
Monobutyl Ether)
Friction Reducer
0.00065
MC B-8642 (WS)
KCLS4
60.00
2-Butoxyethanol (Ethylene Glycol
Scale Inhibitor
12.00
Recycled Produced Water Carrier/Base Fluid 6.87
100.00
000584-08-7
Non-Emulsifier
50.00
027176-87-0
NaturaLine MX
0.07459
0.01063
100 Mesh Sand FTS International Proppant - Natural Quartz 14808-60-7 100.00 1.27
007727-54-0
Proprietary Cured Acrylic Resin Petroleum Distillate Hydrotreated Light Guar Gu

Proprietary Cured Acrylic Resin Petroleum Distillate Hydrotreated Light Guar Gum

014808-60-7
MC B-8642 (WS), NaturaLine MX 588-2 Multi-Chem Group Anti-Bacterial Agent, Scale Inhibitor Methanol 67-56-1
Non-MSDS Components Not Provided by Supplier
Water 7732-18-5
Dioxide)
Potassium Hydroxide
588-2
0.00021
0.00298
Distillates, petroleum, hydrotreated light
0.00000
Glutaraldehyde (Pentanediol) Quaternary Ammonium Compound Ethano

Glutaraldehyde (Pentanediol) Quaternary Ammonium Compound Ethanol

BXL02 Borate XL FRW-200
Crystalline Silica (Quartz)
APB-01 Ammonium Persulfate Breaker
1.00
009000-30-0
0.00678
20.00
NONE
Multi-Chem
001310-58-3
15.00
55.00
068439-51-0
068424-85-1
25.00
Northern White Sand FTS International Proppant - Natural Quartz 14808-60-7 100.00 14.31
TRADE SECRET
APB01 (AMMONIUM PERSUFATE BREAKER)
B10 (HIGH PH BUFFER), BXL02 Borate XL
CI-150, FE 200, FRW-200
KCLS-4, LTB-01, NE 100
FTS International Breaker, Clay Stablizer, Corrosion Inhibitor, Cross Linker, Friction Reducer, Iron Control Agent, Non-Emulsifier, pH Adjusting Agent Water 7732-18-5
Proprietary Iron Control Additive (FE-200L)
Proprietary Breaker Additive (LTB-1)
Proprietary Corrosion Inhibitor Additive (CI-150)
Proprietary Clay Stabilizer Additive (KCLS-4)
Proprietary Breaker (APB01) Additive
Proprietary Friction Reducer Additive (FRW-200 and FRW-200W)
000064-17-5
Surfactant
0.01241
000111-30-8
Additional Ingredients Not Listed on MSDS
010043-35-3
10.00
Clay Stablizer
TURQUOISE-1
FE 200 FTS International Iron Control Agent Glycine, N,N-bis(carboxymethyl)-, trisodium salt 5064-31-3 2.00 0.00008000
Ethylenediaminetetraacetic acid tetrasodium salt hydrate 64-02-8 41.00 0.00167000
Sodium hydroxide 1310-73-2 1.90 0.00008000
0.00417
0.00759
10.1 - 15 HCL FTS International Acid Water 7732-18-5 85.00 0.56
Hydrochloric acid 7647-01-0 15.00 0.09
2.00
064742-47-8
FTS INTERNATIONAL
0.08205
BULK)
0.03043

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC Brine 2261 37
2014 CHESAPEAKE EXPLORATION LLC Brine 4806 353
2015 CHESAPEAKE EXPLORATION LLC Brine 2073 359
2016 CHESAPEAKE EXPLORATION LLC Brine 1774 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1856 364
2018 CHESAPEAKE EXPLORATION LLC Brine 1376 365
2019 CHESAPEAKE EXPLORATION LLC Brine 396 90

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0123350206 2012-08-09 Plug / Plug Back No Violations Nomac rig # 39 is plugging back from 8399 to 7098 ft. See plug back report for more information
0160010412 2012-08-03 Drill / Deepen / Reopen No Violations Chief Simmers has ordered a cement bond log of the 13 3/8 inch casing. He has ordered this log because the Operator has failed to notify ONDR prior to installing and cementing that casing. A cement bond log was submitted to Tom Tomastik at ODNR and approved. The Compliance Notice has been resolved. I am on site today to witness the installation and cementing of the 9 5/8 inch casing string.
0810381018 2012-08-05 Drill / Deepen / Reopen No Violations Nomac rig # 39 is drilling ahead on air at 5245 ft.
0914492696 2012-08-15 Drill / Deepen / Reopen No Violations Nomac rig # 39 is at 12,938 ft drilling ahead on oil base mud.
1249543788 2012-07-24 Drill / Deepen / Reopen No Violations Nomac Drilling Rig # 39 is moving equipment on site today. I spoke with Matt (Company Man) on site and advised that I would be the contact person for ODNR. I passed out my ODNR card and a list of all of the Inspectors, Supervisors, and Central Office staff numbers. Matt advised that he would begin drilling sometime Saturday.
1342533977 2012-07-16 Drill / Deepen / Reopen No Violations I arrived today to check on drilling status. I found that the Tin Horn has been installed along with the Conductor. This Conductor cement job was rescheduled 4 times. There is 100 ft of 20 inch Conductor set and cemented with 252 sks of Class A cement. This was drilled by a Top Hole machine and is now ready for a Drilling rig to move on.
1343934934 2011-07-31 Drill / Deepen / Reopen Violations Noted I am on site today to find out the drilling depth and see when the 13 3/8 casing will be installed and cemented. During my inspection of Nomac Drilling rig # 39 I found that they have already installed the 13 3/8 casing. I ask Matt why I had not been notified of the operation and he replied that I had . He said that he notified me 48 hours ago when he started drilling. I advised him that I made it clear that we needed to be contacted before the installation of any casing and that we witnessed the cementing as well.
1348756042 2012-07-18 Drill / Deepen / Reopen No Violations I am on site today because Chesapeake contacted me to advise they would begin drilling on this pad today. They are to set conductor with a Top Hole auger rig. There is no equipment to drill on site during this inspection.
1420908293 Drill / Deepen / Reopen No Violations
1513227146 2016-02-16 Preliminary Restoration No Violations I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. All wells on location are using the plunger lift system as the method of production. RBDMS production records indicate that the wells are in production.
The production equipment on the pad consists of the following:

10 400 bbl. Production tanks 3 Producing wells 3 Sand separators

1 Low pressure separator tower/Vapor recovery system unit. 1 Combustor 1 Horizontal heater-treater. Equipment present on the location that is not associated with the production equipment consists of: 3 18 Wheelers with trailers 1 track hoe 1 Short bed semi 1 dump truck 1 skid steer 1 power plant 2 pickup trucks

8 small trailers 1 40 foot box trailer 1 16 foot box trailer 3 fuel tanks 35 joints of 9 5/8 inch diameter casing. There was approximately 4 to 5 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A.

1575479012 2012-08-14 Drill / Deepen / Reopen No Violations Nomac rig # 39 is drilling ahead at 11,350 ft. with oil base mud.
1598911791 2012-08-09 Drill / Deepen / Reopen No Violations Nomac rig # 39 has reached T.D for the stratigraphic section of the well at 8413 ft. Tonight I will return to plug back this section.
1638078050 2012-07-26 Drill / Deepen / Reopen No Violations Nomac rig # 39 is moving in today and will begin set up and drilling. At this inspection they are still sideways.
1650253793 2012-07-27 Drill / Deepen / Reopen No Violations Nomac rig # 39 has not started drilling. Will start drilling on Sat. morning.
1799202327 2013-10-03 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to 1509.072A.
1882268660 2013-10-03 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to 1509.072A.
1918959308 2012-07-12 Drill / Deepen / Reopen No Violations I arrived today to find the pull down unit drilling the Conductor hole . During this inspection I found the drilling depth to be 65 ft. Cementing is scheduled later today. Later Gene Belsom cancelled the job and scheduled the job for Friday at 10 am
1943261811 2012-08-03 Drill / Deepen / Reopen No Violations I am on site today to witness the running and cementing of the 9 5/8 casing string. Had 30 bbls returns. See Cement Ticket for more information.
2141163894 2012-07-11 Drill / Deepen / Reopen No Violations DNR Inspector Mark Moreland and I were on site to check the status of Express Energy Service. Our inspection revealed that they have started drilling the hole for the tin horn (cellar). The rig consultant (Gene) advised that they should finish drilling the conductor hole and run casing later this evening. He also stated that if everything went according to plan, then they should be ready to cement the conductor casing sometime tomorrow morning. I advised Gene that Inspector Moreland was taking over the regulatory duties in Harrison County so he would need to contact him about cementing the conductor. Our inspection revealed no violations at this time.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1343934934 US-OH-109937 2012-08-02 Failure to notify inspector; failure to submit cement tickets
1343934934 US-OH-109938 2012-08-02 Permit violation

For data sources see[7]

References