34-067-21540

Well Details

Well ID: 34-067-21540
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Archer Township
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID: 000597
Farm/Lease Name: BUELL 10-11-5
License Status: Producing
License Date: 2018-10-19
Spud Date: 2017-12-07
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-03-22
Well Total Depth: 21954 ft
Configuration: Horizontal
Latitude: 40.350362184
Longitude: -81.01965706

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-08-01 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:8/1/2017, Expired Date:8/1/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-12-06 Proposed Formations:POINT PLEASANT, Issued Date:12/6/2017, Expired Date:12/6/2019 12:00:00 PM, Drilling unit acres:494.67, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-03-22
Correction to Well 2018-06-01 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-10-16
Record Last Modified 2018-10-20
Construction Permit Expires 2019-12-06

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-10-19 8675 8795 0
2018-10-19 21815 21721 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/12/2018 07/05/2018 8618.6 24,254,100.0 1,614,820.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 0.02 0 0
HAI-OS HALLIBURTON Corrosion Inhibitor Propargyl Alcohol (2-Propynol) 000107-19-7 0.1 0 0
Methanol (Methyl Alcohol) 000067-56-1 0.6 0.00001000 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.04586 0
FE-2A HALLIBURTON Iron Control Agent Citric Acid 000077-92-9 0.6 0.00004000 0
Excelerate PS-2 HALLIBURTON Friction Reducer Inorganic salt Trade Secret 0.3 0.00018 0
Petroleum Distillate Hydrotreated Light 064742-47-8 0.3 0.00018 0
OptiKleen-WF HALLIBURTON Breaker Sodium perborate tetrahydrate 010486-00-7 1 0.00003000 0
K-34 HALLIBURTON pH Adjusting Agent Sodium hydrogen carbonate 000144-55-8 1 0 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 1 0.12389 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 0.01 0 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.81819 0
15% HCl Acid HALLIBURTON Acid Hydrochloric Acid 7647-01-0 0.3 0.00328 0
FE-2A, FightR EC-1, HAI-OS, K-34, OptiKleen-WF HALLIBURTON Breaker, Corrosion Inhibitor, Friction Reducer, Iron Control Agent, pH Adjusting Agent Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
Not Provided Not Assigned 1 0.00022 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-05 H2O 15 189842 Gal 223129 Halliburton STAGE 88/88

STAGES 2-87 SEE IMAGES

2018-05-12 H2O 15 216096 Gal 2774300 Halliburton STAGE 1/88

STAGES 2-87 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC 1685966 15783 145
2019 CHESAPEAKE EXPLORATION LLC 1299765 4666 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC Brine 14520 145
2019 CHESAPEAKE EXPLORATION LLC Brine 5335 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0010327131 2018-08-23 Production Wells No Violations Well has been drilled, stimulated, and drilled out. Well has not been flowed back yet. ID to facilities foreman Trevor Joilet. Current activity on pad is production equipment construction and installation. Drilling of 4 new wells on this pad started in december of 2017. They have not been flowed back yet. Call to Chris Huey production foreman stated that flowback should start on 8-30 for the 4 new wells and he hopes to bring the 5 existing wells back online around mid september. Production equipment includes four line heaters, 4 sand seperators, and 4 GPUs for the new wells. Existing wells have 5 sand seperators, 5 GPUs, 2 combustors, 3 compressors, and 7 400 barrel steel tanks in their own containment. All nine wells on the pad are shut in. Surface annular pressure is 0 and intermediate annular pressure is 0.
0187012111 2018-07-18 Completion Testing No Violations On the day of my inspection I witnessed Stone rig 15 onsite. They have not drilled any plugs in this wellboore. Surface annular pressure is 0 and intermediate annular pressure is 0. Containment has been repaired from last weeks inspection and contaminated gravel was removed.
0220495911 2018-07-02 Completion Testing No Violations On the day of my inspection I found a Halliburton frac crew rigged up to this as well, as well as permits 21541 and 21067. The surface casing annulus is 0 and intermediate casing annulus is 61 psi. stage 81 of 88 was just perforated from 9846-9725 feet. 5 guns, 6 shots per gun, on 30 foot spacing. Breakdown pressure on last stage was 7220 psi.
0264368792 2018-03-12 Drill / Deepen / Reopen No Violations On the day of my inspection I found Patterson 571 drilling an 8.75 inch diameter hole at a depth of 4100 feet. 13.375 inch diameter surface casing set at 653 feet on 3/9/18. 9.625 inch diameter intermediate casing set at 2011 feet on 3/11/18. Wyoming casing ran both casing strings and Schlumberger cemented both strings.
0439285337 2018-05-14 Completion Testing No Violations On the day of my inspection I found halliburton rigged up to the 6H, 206H, 10H, and the 210H. This well has had 3 out of 88 stages fracked. The 9.625 inch diameter annular pressure is 0 psi. The 13.375 inch diameter annular pressure is zero also. Frack is currently shut down due to lighting strikes within 10 miles.
0492283430 2017-12-07 Casing String Witnessed No Violations On the day of my inspection I witnessed Express had augured a 30 inch diameter hole to 60 feet and a 26 inch diameter hole to 120 feet. 120 feet of 20 inch diameter conductor casing was run. Express was onsite with 323 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50% percent excess ran. Cement was displaced with 39 barrels of fresh water. 15 barrels of cement returned to surface.
0738063467 2018-07-12 Completion Testing No Violations On the day of my inspection I found Stone rig 15 on location to drill out frac plugs. Current surface annular pressure is 0 and intermediate annular pressure is 50 psi. Currently drilling out on permit 1542. South and east of the wellheads some crystalization was noted on the pad. David Reese and Blake Riley are company men for Chesapeake. They were informed of the potential containment issue and said that would get it fixed and cleaned up right away. The area is dry and does not appear to have been a large volume of fluid that escaped primary containment.
1226792575 2018-07-24 Completion Testing No Violations On the day of my inspection I witnessed Stone rig #15 in onsite. This well is full of plugs and will be the last well to get drilled out on the pad. Surface annular pressure is 0 and intermediate annular pressure is 0.
1521564816 2018-03-20 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 571 drilling their 8.5 inch diameter hole at a depth of 16500 feet. This is last well on this pad. Company man Danny Lambert anticipates a rig move this weekend. Containment is in place and functioning properly. 5.5 inch diameter casing is onsite ready for casing run.