If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21540 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.350362184,"lon":-81.01965706,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Archer Township | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: 000597 | |
Farm/Lease Name: BUELL 10-11-5 | |
License Status: Producing | |
License Date: 2018-10-19 | |
Spud Date: 2017-12-07 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-03-22 | |
Well Total Depth: 21954 ft | |
Configuration: Horizontal | |
Latitude: 40.350362184 | |
Longitude: -81.01965706 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-08-01 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:8/1/2017, Expired Date:8/1/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-12-06 | Proposed Formations:POINT PLEASANT, Issued Date:12/6/2017, Expired Date:12/6/2019 12:00:00 PM, Drilling unit acres:494.67, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-03-22 | |
Correction to Well | 2018-06-01 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-10-16 | |
Record Last Modified | 2018-10-20 | |
Construction Permit Expires | 2019-12-06 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-19 | 8675 | 8795 | 0 |
2018-10-19 | 21815 | 21721 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/12/2018 | 07/05/2018 | 8618.6 | 24,254,100.0 | 1,614,820.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 0.02 | 0 | 0 |
HAI-OS | HALLIBURTON | Corrosion Inhibitor | Propargyl Alcohol (2-Propynol) | 000107-19-7 | 0.1 | 0 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 0.6 | 0.00001000 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.04586 | 0 | |
FE-2A | HALLIBURTON | Iron Control Agent | Citric Acid | 000077-92-9 | 0.6 | 0.00004000 | 0 | |
Excelerate PS-2 | HALLIBURTON | Friction Reducer | Inorganic salt | Trade Secret | 0.3 | 0.00018 | 0 | |
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 0.3 | 0.00018 | 0 | ||||
OptiKleen-WF | HALLIBURTON | Breaker | Sodium perborate tetrahydrate | 010486-00-7 | 1 | 0.00003000 | 0 | |
K-34 | HALLIBURTON | pH Adjusting Agent | Sodium hydrogen carbonate | 000144-55-8 | 1 | 0 | 0 | |
Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 1 | 0.12389 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 0.01 | 0 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.81819 | 0 | |
15% HCl Acid | HALLIBURTON | Acid | Hydrochloric Acid | 7647-01-0 | 0.3 | 0.00328 | 0 | |
FE-2A, FightR EC-1, HAI-OS, K-34, OptiKleen-WF | HALLIBURTON | Breaker, Corrosion Inhibitor, Friction Reducer, Iron Control Agent, pH Adjusting Agent | Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | |
Not Provided | Not Assigned | 1 | 0.00022 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-07-05 | H2O | 15 | 189842 Gal | 223129 | Halliburton | STAGE 88/88
STAGES 2-87 SEE IMAGES |
2018-05-12 | H2O | 15 | 216096 Gal | 2774300 | Halliburton | STAGE 1/88
STAGES 2-87 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | 1685966 | 15783 | 145 |
2019 | CHESAPEAKE EXPLORATION LLC | 1299765 | 4666 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 14520 | 145 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 5335 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0010327131 | 2018-08-23 | Production Wells | No Violations | Well has been drilled, stimulated, and drilled out. Well has not been flowed back yet. ID to facilities foreman Trevor Joilet. Current activity on pad is production equipment construction and installation. Drilling of 4 new wells on this pad started in december of 2017. They have not been flowed back yet. Call to Chris Huey production foreman stated that flowback should start on 8-30 for the 4 new wells and he hopes to bring the 5 existing wells back online around mid september. Production equipment includes four line heaters, 4 sand seperators, and 4 GPUs for the new wells. Existing wells have 5 sand seperators, 5 GPUs, 2 combustors, 3 compressors, and 7 400 barrel steel tanks in their own containment. All nine wells on the pad are shut in. Surface annular pressure is 0 and intermediate annular pressure is 0. |
0187012111 | 2018-07-18 | Completion Testing | No Violations | On the day of my inspection I witnessed Stone rig 15 onsite. They have not drilled any plugs in this wellboore. Surface annular pressure is 0 and intermediate annular pressure is 0. Containment has been repaired from last weeks inspection and contaminated gravel was removed. |
0220495911 | 2018-07-02 | Completion Testing | No Violations | On the day of my inspection I found a Halliburton frac crew rigged up to this as well, as well as permits 21541 and 21067. The surface casing annulus is 0 and intermediate casing annulus is 61 psi. stage 81 of 88 was just perforated from 9846-9725 feet. 5 guns, 6 shots per gun, on 30 foot spacing. Breakdown pressure on last stage was 7220 psi. |
0264368792 | 2018-03-12 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found Patterson 571 drilling an 8.75 inch diameter hole at a depth of 4100 feet. 13.375 inch diameter surface casing set at 653 feet on 3/9/18. 9.625 inch diameter intermediate casing set at 2011 feet on 3/11/18. Wyoming casing ran both casing strings and Schlumberger cemented both strings. |
0439285337 | 2018-05-14 | Completion Testing | No Violations | On the day of my inspection I found halliburton rigged up to the 6H, 206H, 10H, and the 210H. This well has had 3 out of 88 stages fracked. The 9.625 inch diameter annular pressure is 0 psi. The 13.375 inch diameter annular pressure is zero also. Frack is currently shut down due to lighting strikes within 10 miles. |
0492283430 | 2017-12-07 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed Express had augured a 30 inch diameter hole to 60 feet and a 26 inch diameter hole to 120 feet. 120 feet of 20 inch diameter conductor casing was run. Express was onsite with 323 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50% percent excess ran. Cement was displaced with 39 barrels of fresh water. 15 barrels of cement returned to surface. |
0738063467 | 2018-07-12 | Completion Testing | No Violations | On the day of my inspection I found Stone rig 15 on location to drill out frac plugs. Current surface annular pressure is 0 and intermediate annular pressure is 50 psi. Currently drilling out on permit 1542. South and east of the wellheads some crystalization was noted on the pad. David Reese and Blake Riley are company men for Chesapeake. They were informed of the potential containment issue and said that would get it fixed and cleaned up right away. The area is dry and does not appear to have been a large volume of fluid that escaped primary containment. |
1226792575 | 2018-07-24 | Completion Testing | No Violations | On the day of my inspection I witnessed Stone rig #15 in onsite. This well is full of plugs and will be the last well to get drilled out on the pad. Surface annular pressure is 0 and intermediate annular pressure is 0. |
1521564816 | 2018-03-20 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 571 drilling their 8.5 inch diameter hole at a depth of 16500 feet. This is last well on this pad. Company man Danny Lambert anticipates a rig move this weekend. Containment is in place and functioning properly. 5.5 inch diameter casing is onsite ready for casing run. |
For data sources see[10]