If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-25690 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.82915002,"lon":-81.50105507,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Jackson Township | |
Operator Name: OHIO VALLEY ENERGY SYSTEM CORP | |
Well Pad ID: | |
Farm/Lease Name: NEW HARMONY # 1 | |
License Status: Producing | |
License Date: 2011-06-28 | |
Spud Date: 2011-01-19 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2011-02-04 | |
Well Total Depth: 4506 ft | |
Configuration: Vertical | |
Latitude: 40.829150020 | |
Longitude: -81.50105507 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-07-08 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:7/8/2010, Expired Date:7/8/2011 6:00:00 AM, Drilling unit acres:40.97, Proposed Well Type:OG, Proposed Well Class:POOL |
Plugged Back | 2011-01-27 | |
Reached Total Depth | 2011-02-04 | |
Completion Report Received | 2011-03-29 | |
Construction Permit Expires | 2011-07-08 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-06-28 | 4245 | 4261 | 32 |
2011-06-28 | 4290 | 4306 | 38 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-03-01 | H2O | 15 | 112054 Gal | 78800 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEM CORP | 6992 | 0 | 86 |
2012 | OHIO VALLEY ENERGY SYSTEM CORP | 29694 | 0 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEM CORP | 43165 | 87 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEM CORP | 35217 | 79 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEM CORP | 76493 | 79 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEM CORP | 61981 | 102 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEM CORP | 70236 | 92 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEM CORP | 71676 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 0 | 86 |
2012 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 80 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 182 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 124 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 68 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 0 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 136 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 69 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0282299046 | 2011-04-28 | Preliminary Restoration | No Violations | The well is completed and the tank battery is set. The location is rough graded. |
0332653707 | 2012-01-09 | UrbanPreliminary Restoration | No Violations | On 1/9/2012, I performed a status check on the above well site. The well is in production, the site is reclaimed and identification signs are posted. The Preliminary Reatoration is PASSED. |
0472226251 | 2011-03-01 | Completion Testing | No Violations | Producers Services Corporation (PSC) fraced the well today. I witnessed the entire job with Rick Liddle (OVE), Ray Wallace (ODNR), and Chris Grimm (ODNR). Breakdown Pressure 1330 psi. Average Treating Pressure 37 bpm at 1742 psi. Total Fluid Volume 112,063 gals. Total Sand 788 sacks. Flush 12,061 gals. Instant Shut In (ISI) 1123 psi. After 5 min. 1100 psi. Hydraulic Horse Power (HHP) 1580. The job was completed with no problems. |
1086695104 | 2011-03-01 | Urban Drill / Deepen / Reopen | No Violations | Training for Ray Wallace on well construction |
1297789016 | 2011-02-14 | Preliminary Restoration | No Violations | Solidifying the drilling pits today. |
1299521629 | 2011-01-20 | Drill / Deepen / Reopen | No Violations | Training Ray Wallace Surface cement job. |
For data sources see[9]