If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22715 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.161235099,"lon":-81.64562166,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Bath Township | |
Operator Name: TRANSCONTINENTAL OIL & GAS INC | |
Well Pad ID: | |
Farm/Lease Name: AUGHENBAUGH | |
License Status: Producing | |
License Date: 1991-02-26 | |
Spud Date: 1991-05-08 | |
Spud Drilling Contractor: MOHAWK DRLG | |
Final Drill Date: 1991-05-13 | |
Well Total Depth: 3683 ft | |
Configuration: Vertical | |
Latitude: 41.161235099 | |
Longitude: -81.64562166 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1991-02-26 | Issued Date 2/26/91 Expired Date 2/26/92 Acres 0030855 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03683 Proposed Drill Depth 03683 |
Original Spud | 1991-05-08 | |
Completed | 1991-05-13 | |
Reached Total Depth | 1991-05-13 | |
CO | 1991-05-17 | 1249 CUTTER OIL CO GeoDate 2/26/91 |
Completion Report Received | 1992-01-23 | |
Construction Permit Expires | 1992-02-26 | |
Change of Owner | 2011-12-20 | Operator changed from 1249, CUTTER OIL CO to 4744, TRANSCONTINENTAL O & G |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3435 | 3499 | 0 |
2006-09-11 | 3474 | 3500 | 25 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 250 Mscf | 0 | |||
H2O | 0 | 2400 Bbl | 0 | ISIP 1100 PSI: | ||
ACID | 0 | 500 Gal | 70000 | FRAC W/2400 BW,700 SX SAND AND 250 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | CUTTER OIL COMPANY | 11394 | 627 | 145 |
1992 | CUTTER OIL COMPANY | 33373 | 1192 | 365 |
1993 | CUTTER OIL COMPANY | 25060 | 716 | 365 |
1994 | CUTTER OIL COMPANY | 17258 | 461 | 365 |
1995 | CUTTER OIL COMPANY | 14454 | 363 | 365 |
1996 | CUTTER OIL COMPANY | 10822 | 299 | 365 |
1997 | CUTTER OIL COMPANY | 9252 | 220 | 365 |
1998 | CUTTER OIL COMPANY | 8545 | 188 | 365 |
1999 | CUTTER OIL COMPANY | 7070 | 166 | 365 |
2000 | CUTTER OIL COMPANY | 5232 | 159 | 365 |
2001 | CUTTER OIL COMPANY | 4649 | 156 | 365 |
2002 | CUTTER OIL COMPANY | 4539 | 77 | 365 |
2003 | CUTTER OIL COMPANY | 4049 | 149 | 365 |
2004 | CUTTER OIL COMPANY | 3073 | 140 | 365 |
2005 | CUTTER OIL COMPANY | 3337 | 57 | 365 |
2006 | CUTTER OIL COMPANY | 3154 | 123 | 365 |
2007 | CUTTER OIL COMPANY | 2311 | 69 | 365 |
2008 | CUTTER OIL COMPANY | 2402 | 103 | 365 |
2009 | CUTTER OIL COMPANY | 2475 | 119 | 365 |
2010 | CUTTER OIL COMPANY | 2654 | 70 | 365 |
2011 | TRANSCONTINENTAL OIL & GAS INC | 2291 | 58 | 365 |
2012 | TRANSCONTINENTAL OIL & GAS INC | 2357 | 52 | 366 |
2013 | TRANSCONTINENTAL OIL & GAS INC | 1915 | 38 | 365 |
2014 | TRANSCONTINENTAL OIL & GAS INC | 1803 | 54 | 365 |
2015 | TRANSCONTINENTAL OIL & GAS INC | 1509 | 55 | 365 |
2016 | TRANSCONTINENTAL OIL & GAS INC | 1106 | 61 | 365 |
2017 | TRANSCONTINENTAL OIL & GAS INC | 1432 | 29 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | CUTTER OIL COMPANY | Brine | 729 | 145 |
1992 | CUTTER OIL COMPANY | Brine | 137 | 365 |
1993 | CUTTER OIL COMPANY | Brine | 154 | 365 |
1994 | CUTTER OIL COMPANY | Brine | 53 | 365 |
1995 | CUTTER OIL COMPANY | Brine | 118 | 365 |
1996 | CUTTER OIL COMPANY | Brine | 30 | 365 |
1997 | CUTTER OIL COMPANY | Brine | 40 | 365 |
1998 | CUTTER OIL COMPANY | Brine | 30 | 365 |
1999 | CUTTER OIL COMPANY | Brine | 53 | 365 |
2000 | CUTTER OIL COMPANY | Brine | 50 | 365 |
2001 | CUTTER OIL COMPANY | Brine | 60 | 365 |
2002 | CUTTER OIL COMPANY | Brine | 92 | 365 |
2003 | CUTTER OIL COMPANY | Brine | 0 | 365 |
2004 | CUTTER OIL COMPANY | Brine | 0 | 365 |
2005 | CUTTER OIL COMPANY | Brine | 50 | 365 |
2006 | CUTTER OIL COMPANY | Brine | 0 | 365 |
2007 | CUTTER OIL COMPANY | Brine | 40 | 365 |
2008 | CUTTER OIL COMPANY | Brine | 50 | 365 |
2009 | CUTTER OIL COMPANY | Brine | 72 | 365 |
2010 | CUTTER OIL COMPANY | Brine | 0 | 365 |
2011 | TRANSCONTINENTAL OIL & GAS INC | Brine | 63 | 365 |
2012 | TRANSCONTINENTAL OIL & GAS INC | Brine | 0 | 366 |
2013 | TRANSCONTINENTAL OIL & GAS INC | Brine | 14 | 365 |
2014 | TRANSCONTINENTAL OIL & GAS INC | Brine | 9 | 365 |
2015 | TRANSCONTINENTAL OIL & GAS INC | Brine | 0 | 365 |
2016 | TRANSCONTINENTAL OIL & GAS INC | Brine | 13 | 365 |
2017 | TRANSCONTINENTAL OIL & GAS INC | Brine | 13 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1038869063 | 2014-01-29 | UrbanProduction Wells | No Violations | Uniontown office received a call from John Aughenbaugh of 3765 Granger Rd. Akron, Oh concerning the operation and servicing of the Aughenbaugh # 1 ( 34-153-2-2715 ) . The Landowner claimed that the pumper had not been there for weeks. Upon my inspection I noticed tracks to the pump jack and new gas measurement chart. The Tank Battery consists of 2- 140 Bbl. Stock tanks, 35 Bbls. plastic Brine tank , verticle Separator and two Domestic gas meters. All equipment appeared leak-free and serviceable. The well consisted of a Pump jack and associated plumbing , all of which was leak-free and recently serviced. I spoke with Cal Marks and relayed Mr. Aughenbaugh concerns about lack of maintaince and the condition of the access road. Mr. Marks said he will repair the road weather allowing and that the pumper is there weekly. When I spoke with Mr. Aughenbaugh I told him that DOGRM does not any authority in work schedules. I also informed him that the equipment does not appear to pose a safety hazard at the time of my inspection. I asked the pumper to make locks are placed on the south facing gates and loadlines. |
For data sources see[9]