If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22725 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.145569223,"lon":-81.64291985,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Bath Township | |
Operator Name: EMBASSY ENERGY INC. | |
Well Pad ID: | |
Farm/Lease Name: JD III UNIT | |
License Status: Producing | |
License Date: 1995-08-12 | |
Spud Date: 1995-08-14 | |
Spud Drilling Contractor: IPSCO | |
Final Drill Date: 1995-08-19 | |
Well Total Depth: 3755 ft | |
Configuration: Vertical | |
Latitude: 41.145569223 | |
Longitude: -81.64291985 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1991-07-18 | 2455 WHIDBEY RESOURCES INC GeoDate 7/18/91 |
Oil and Gas | 1991-07-18 | Issued Date 7/18/91 Expired Date 7/17/92 Acres 0020000 Tool Type RTF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth |
CO | 1995-08-11 | 2455 WHIDBEY RESOURCES INC GeoDate 8/11/95 |
Oil and Gas | 1995-08-11 | Issued Date 8/12/95 Expired Date 8/11/96 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03755 Proposed Drill Depth 03755 |
Original Spud | 1995-08-14 | |
Completed | 1995-08-19 | |
Reached Total Depth | 1995-08-19 | |
Completion Report Received | 1995-11-13 | |
Construction Permit Expires | 1996-08-11 | |
Change of Owner | 2002-02-21 | Operator changed from 2455, WHIDBEY RESOURCES INC to 3802, NORTH AMERICAN PETROLEUM |
Change of Owner | 2016-07-05 | Operator changed from 3802, NORTH AMERICAN PETROLEUM to 9683, EMBASSY ENERGY INC. |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3496 | 3621 | 0 |
2006-09-11 | 3561 | 3565 | 4 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 8 | 250 Gal | 0 | 7 1/2 HCL ACID: | ||
H2O | 0 | 900 Bbl | 80000 | FRAC W/900 BBL GEL WATER AND 80M# |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | NORTH AMERICAN PETROLEUM INC | 2820 | 483 | 365 |
2003 | NORTH AMERICAN PETROLEUM INC | 577 | 3456 | 365 |
2004 | NORTH AMERICAN PETROLEUM INC | 3449 | 514 | 365 |
2005 | NORTH AMERICAN PETROLEUM INC | 3360 | 462 | 365 |
2006 | NORTH AMERICAN PETROLEUM INC | 2743 | 391 | 365 |
2007 | NORTH AMERICAN PETROLEUM INC | 1405 | 229 | 365 |
2008 | NORTH AMERICAN PETROLEUM INC | 2712 | 301 | 365 |
2010 | NORTH AMERICAN PETROLEUM INC | 3323 | 640 | 365 |
2011 | NORTH AMERICAN PETROLEUM INC | 3076 | 493 | 365 |
2012 | NORTH AMERICAN PETROLEUM INC | 1833 | 371 | 366 |
2013 | NORTH AMERICAN PETROLEUM INC | 1907 | 461 | 365 |
2014 | NORTH AMERICAN PETROLEUM INC | 1720 | 287 | 178 |
2015 | NORTH AMERICAN PETROLEUM INC | 1332 | 378 | 365 |
2016 | NORTH AMERICAN PETROLEUM INC | 898 | 146 | 180 |
2017 | EMBASSY ENERGY INC. | 1954 | 343 | 365 |
2018 | EMBASSY ENERGY INC. | 6330 | 348 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | NORTH AMERICAN PETROLEUM INC | Brine | 224 | 365 |
2003 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 365 |
2004 | NORTH AMERICAN PETROLEUM INC | Brine | 84 | 365 |
2005 | NORTH AMERICAN PETROLEUM INC | Brine | 219 | 365 |
2006 | NORTH AMERICAN PETROLEUM INC | Brine | 501 | 365 |
2007 | NORTH AMERICAN PETROLEUM INC | Brine | 77 | 365 |
2008 | NORTH AMERICAN PETROLEUM INC | Brine | 383 | 365 |
2010 | NORTH AMERICAN PETROLEUM INC | Brine | 689 | 365 |
2011 | NORTH AMERICAN PETROLEUM INC | Brine | 192 | 365 |
2012 | NORTH AMERICAN PETROLEUM INC | Brine | 187 | 366 |
2013 | NORTH AMERICAN PETROLEUM INC | Brine | 184 | 365 |
2014 | NORTH AMERICAN PETROLEUM INC | Brine | 365 | 178 |
2015 | NORTH AMERICAN PETROLEUM INC | Brine | 169 | 365 |
2016 | EMBASSY ENERGY INC. | Brine | 0 | 365 |
2017 | EMBASSY ENERGY INC. | Brine | 54 | 365 |
2018 | EMBASSY ENERGY INC. | Brine | 23 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0151298475 | 2003-12-31 | Production Wells | No Violations | Status check inspection - I asked Rick Batta to ID the wellhead since all four JD III wells share a common tank battery. |
For data sources see[9]