If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22794 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.019942019,"lon":-81.56626819,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: CARGILL INC | |
Well Pad ID: | |
Farm/Lease Name: CITY OF AKRON | |
License Status: Active Injection | |
License Date: 1997-12-19 | |
Spud Date: 1994-11-19 | |
Spud Drilling Contractor: IPSCO | |
Final Drill Date: 1995-01-31 | |
Well Total Depth: 4450 ft | |
Configuration: Horizontal | |
Latitude: 41.019942019 | |
Longitude: -81.56626819 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1994-08-24 | 1053 AKZO NOBEL SALT INC GeoDate 8/24/94 |
Solution Mining | 1994-08-24 | Issued Date 8/24/94 Expired Date 8/24/95 Acres 0120000 Tool Type RTF Proposed Formation SALINA Proposed Depth 03360 Proposed Drill Depth 03360 |
Original Spud | 1994-11-19 | CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3 |
Plugged Back | 1994-12-22 | CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3 |
Annulus Pressure Monitoring Approved | 1995-01-13 | CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3 |
Completed | 1995-01-31 | CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3 |
Reached Total Depth | 1995-01-31 | CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3 |
Completion Report Received | 1995-02-23 | CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3 |
Construction Permit Expires | 1995-08-24 | CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3 |
Record Last Modified | 2017-10-19 | CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3 |
Last Compliance Report | 2019-12-05 | CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1999-09-02 | 3120 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | NONE |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0126146176 | 2003-09-08 | Solution Mining Project | No Violations | Status check inspection - no violations at this time. |
0698038514 | 2016-08-16 | Solution Mining Project | No Violations | There were no violations at the time of inspection. |
0751618686 | 2009-12-11 | Solution Mining Project | No Violations | This inspection was for the five year Water-Brine Interface mechanical integrity test on the 9-5/8 production casing. The reference well for this test was the production tubing in this well. On 12/10, a MIT was attempted on this well. However, on the next to last reading, the meter on the reference well started to fail. Even though the pressure differentials up to that point indicated that the well was passing the test, the decision was made to replace the meters and start the test over on 12/11. On 12/11 the initial pressure difference between the casing and the tubing was 468.063 psi. The final pressure difference was 468.180 psi, a change of 0.117 psi over eight hours for an average of 0.015 psi/hour. The allowable average is 0.05 psi/hour. The well PASSED the test. |
1069717039 | 2009-06-18 | Solution Mining Project | No Violations | Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time. |
1467366250 | 2004-12-22 | Solution Mining Project | No Violations | Successfully completed the 5 year MIT.
Time Test Well Pressure Reference Well Pressure Difference 08:00 585.726 130.511 455.215 09:00 585.776 130.579 455.197 10:00 585.803 130.609 455.194 11:00 585.819 130.628 455.191 12:00 585.821 130.635 455.186 13:00 585.840 130.652 455.188 14:00 585.851 130.669 455.182 15:00 585.860 130.682 455.178 16:00 585.860 130.689 455.171 The net pressure change was 0.044 psi over 8 hours for an average of 0.0055 psi/hour |
1531157447 | 2018-07-09 | Solution Mining Project | No Violations | I found the wellhead secure with a locked chain link fence. There is an identification sign posted. I observed no leaks or spills. |
1665133199 | 2010-08-03 | Solution Mining Project | No Violations | Annual inspection of this solution mining well found no violations at this time. Preliminary restoration also approved. |
1866522569 | 2014-12-05 | Solution Mining Project | No Violations | A water-brine interface mechanical integrity test was performed on the well. Calculations indicated a net pressure change of less than 0.05 psi./hour, between the well and the reference. The well passed the test. |
2028917371 | 2004-10-26 | Solution Mining Project | No Violations | Status check inspection - no violations at this time. |
For data sources see[5]