X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-24172

Well Details

Well ID: 34-169-24172
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Chester Township
Operator Name: TRANSIT ENERGY INC
Well Pad ID:
Farm/Lease Name: B& O R R/FENDER UNIT
License Status: Producing
License Date: 1985-06-14
Spud Date: 1985-09-09
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]]
Final Drill Date: 1985-09-13
Well Total Depth: 3100 ft
Configuration: Vertical
Latitude: 40.874869917
Longitude: -82.00930331

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1985-06-14 169 SMAIL JAMES R GeoDate 6/14/85
Oil and Gas 1985-06-14 Issued Date 6/14/85 Expired Date 6/14/86 Acres 0020000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03100 Proposed Drill Depth 03100
Original Spud 1985-09-09
Completed 1985-09-13
Reached Total Depth 1985-09-13
Completion Report Received 1985-10-21
Construction Permit Expires 1986-06-14
Change of Owner 2016-03-15 Operator changed from 169, JAMES R SMAIL INC to 8775, SIGLER CONTRACT PUMPING INC
Change of Owner 2018-01-03 Operator changed from 8775, SIGLER CONTRACT PUMPING INC to 2771, TRANSIT ENERGY INC
Record Last Modified 2018-01-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 2920 3000 0
2006-09-11 2945 2998 18

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 51000 Gal 40000 FRAC;H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 JAMES R SMAIL INC 1675 225 84
1986 JAMES R SMAIL INC 2614 623 310
1987 JAMES R SMAIL INC 1681 305 365
1988 JAMES R SMAIL INC 1317 145 365
1989 JAMES R SMAIL INC 1386 73 365
1990 JAMES R SMAIL INC 522 76 365
1991 JAMES R SMAIL INC 694 134 365
1992 JAMES R SMAIL INC 457 37 365
1993 JAMES R SMAIL INC 455 0 365
1994 JAMES R SMAIL INC 452 79 365
1995 JAMES R SMAIL INC 488 0 365
1996 JAMES R SMAIL INC 473 70 365
1997 JAMES R SMAIL INC 418 0 365
1998 JAMES R SMAIL INC 366 0 365
1999 JAMES R SMAIL INC 606 80 365
2000 JAMES R SMAIL INC 557 35 365
2001 JAMES R SMAIL INC 603 0 365
2002 JAMES R SMAIL INC 596 0 365
2003 JAMES R SMAIL INC 738 72 365
2004 JAMES R SMAIL INC 592 40 365
2005 JAMES R SMAIL INC 558 0 365
2006 JAMES R SMAIL INC 454 40 365
2007 JAMES R SMAIL INC 352 0 365
2008 JAMES R SMAIL INC 361 0 365
2009 JAMES R SMAIL INC 337 75 365
2010 JAMES R SMAIL INC 432 0 365
2011 JAMES R SMAIL INC 401 0 365
2012 JAMES R SMAIL INC 446 70 366
2013 JAMES R SMAIL INC 361 0 365
2014 JAMES R SMAIL INC 225 42 365
2015 JAMES R SMAIL INC 216 0 365
2016 JAMES R SMAIL INC 80 69 365
2017 SIGLER CONTRACT PUMPING INC 372 21 365
2018 TRANSIT ENERGY INC 319 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 JAMES R SMAIL INC Brine 0 84
1986 JAMES R SMAIL INC Brine 50 310
1987 JAMES R SMAIL INC Brine 40 365
1988 JAMES R SMAIL INC Brine 0 365
1989 JAMES R SMAIL INC Brine 0 365
1990 JAMES R SMAIL INC Brine 20 365
1991 JAMES R SMAIL INC Brine 0 365
1992 JAMES R SMAIL INC Brine 0 365
1993 JAMES R SMAIL INC Brine 0 365
1994 JAMES R SMAIL INC Brine 0 365
1995 JAMES R SMAIL INC Brine 0 365
1996 JAMES R SMAIL INC Brine 0 365
1997 JAMES R SMAIL INC Brine 0 365
1998 JAMES R SMAIL INC Brine 0 365
1999 JAMES R SMAIL INC Brine 30 365
2000 JAMES R SMAIL INC Brine 365
2001 JAMES R SMAIL INC Brine 365
2002 JAMES R SMAIL INC Brine 0 365
2003 JAMES R SMAIL INC Brine 0 365
2004 JAMES R SMAIL INC Brine 0 365
2005 JAMES R SMAIL INC Brine 0 365
2006 JAMES R SMAIL INC Brine 0 365
2007 JAMES R SMAIL INC Brine 0 365
2008 JAMES R SMAIL INC Brine 0 365
2009 JAMES R SMAIL INC Brine 0 365
2010 JAMES R SMAIL INC Brine 0 365
2011 JAMES R SMAIL INC Brine 0 365
2012 JAMES R SMAIL INC Brine 0 366
2013 JAMES R SMAIL INC Brine 0 365
2014 JAMES R SMAIL INC Brine 0 365
2015 JAMES R SMAIL INC Brine 0 365
2016 JAMES R SMAIL INC Brine 0 365
2017 SIGLER CONTRACT PUMPING INC Brine 0 365
2018 TRANSIT ENERGY INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
00000PL465 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0601420697 2016-10-19 Production Wells No Violations Inspected production well on 10/19/2016. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with a natural gas-powered motor. No problems were noted at the time of the inspection.
1323160537 2016-03-09 Production Wells No Violations Inspected production well on 03/09/2016. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank, and 1-vertical separator located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with a gas-powered motor. No problems were noted at the time of the inspection.
1387079194 2017-02-01 Production Wells No Violations Inspected production well on 02/01/2017. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with a natural gas-powered motor. No problems were noted at the time of the inspection.
1538912240 2018-07-03 Production Wells No Violations Inspected production well on 07/03/2018. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank, 1-vertical separator, 1-drip, and 1-meter box, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack; the motor was not present at the time of the inspection. No problems were noted at the time of the inspection.

For data sources see[9]

References