If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-24172 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.874869917,"lon":-82.00930331,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Chester Township | |
Operator Name: TRANSIT ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: B& O R R/FENDER UNIT | |
License Status: Producing | |
License Date: 1985-06-14 | |
Spud Date: 1985-09-09 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1985-09-13 | |
Well Total Depth: 3100 ft | |
Configuration: Vertical | |
Latitude: 40.874869917 | |
Longitude: -82.00930331 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1985-06-14 | 169 SMAIL JAMES R GeoDate 6/14/85 |
Oil and Gas | 1985-06-14 | Issued Date 6/14/85 Expired Date 6/14/86 Acres 0020000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03100 Proposed Drill Depth 03100 |
Original Spud | 1985-09-09 | |
Completed | 1985-09-13 | |
Reached Total Depth | 1985-09-13 | |
Completion Report Received | 1985-10-21 | |
Construction Permit Expires | 1986-06-14 | |
Change of Owner | 2016-03-15 | Operator changed from 169, JAMES R SMAIL INC to 8775, SIGLER CONTRACT PUMPING INC |
Change of Owner | 2018-01-03 | Operator changed from 8775, SIGLER CONTRACT PUMPING INC to 2771, TRANSIT ENERGY INC |
Record Last Modified | 2018-01-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 2920 | 3000 | 0 |
2006-09-11 | 2945 | 2998 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 51000 Gal | 40000 | FRAC;H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | JAMES R SMAIL INC | 1675 | 225 | 84 |
1986 | JAMES R SMAIL INC | 2614 | 623 | 310 |
1987 | JAMES R SMAIL INC | 1681 | 305 | 365 |
1988 | JAMES R SMAIL INC | 1317 | 145 | 365 |
1989 | JAMES R SMAIL INC | 1386 | 73 | 365 |
1990 | JAMES R SMAIL INC | 522 | 76 | 365 |
1991 | JAMES R SMAIL INC | 694 | 134 | 365 |
1992 | JAMES R SMAIL INC | 457 | 37 | 365 |
1993 | JAMES R SMAIL INC | 455 | 0 | 365 |
1994 | JAMES R SMAIL INC | 452 | 79 | 365 |
1995 | JAMES R SMAIL INC | 488 | 0 | 365 |
1996 | JAMES R SMAIL INC | 473 | 70 | 365 |
1997 | JAMES R SMAIL INC | 418 | 0 | 365 |
1998 | JAMES R SMAIL INC | 366 | 0 | 365 |
1999 | JAMES R SMAIL INC | 606 | 80 | 365 |
2000 | JAMES R SMAIL INC | 557 | 35 | 365 |
2001 | JAMES R SMAIL INC | 603 | 0 | 365 |
2002 | JAMES R SMAIL INC | 596 | 0 | 365 |
2003 | JAMES R SMAIL INC | 738 | 72 | 365 |
2004 | JAMES R SMAIL INC | 592 | 40 | 365 |
2005 | JAMES R SMAIL INC | 558 | 0 | 365 |
2006 | JAMES R SMAIL INC | 454 | 40 | 365 |
2007 | JAMES R SMAIL INC | 352 | 0 | 365 |
2008 | JAMES R SMAIL INC | 361 | 0 | 365 |
2009 | JAMES R SMAIL INC | 337 | 75 | 365 |
2010 | JAMES R SMAIL INC | 432 | 0 | 365 |
2011 | JAMES R SMAIL INC | 401 | 0 | 365 |
2012 | JAMES R SMAIL INC | 446 | 70 | 366 |
2013 | JAMES R SMAIL INC | 361 | 0 | 365 |
2014 | JAMES R SMAIL INC | 225 | 42 | 365 |
2015 | JAMES R SMAIL INC | 216 | 0 | 365 |
2016 | JAMES R SMAIL INC | 80 | 69 | 365 |
2017 | SIGLER CONTRACT PUMPING INC | 372 | 21 | 365 |
2018 | TRANSIT ENERGY INC | 319 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | JAMES R SMAIL INC | Brine | 0 | 84 |
1986 | JAMES R SMAIL INC | Brine | 50 | 310 |
1987 | JAMES R SMAIL INC | Brine | 40 | 365 |
1988 | JAMES R SMAIL INC | Brine | 0 | 365 |
1989 | JAMES R SMAIL INC | Brine | 0 | 365 |
1990 | JAMES R SMAIL INC | Brine | 20 | 365 |
1991 | JAMES R SMAIL INC | Brine | 0 | 365 |
1992 | JAMES R SMAIL INC | Brine | 0 | 365 |
1993 | JAMES R SMAIL INC | Brine | 0 | 365 |
1994 | JAMES R SMAIL INC | Brine | 0 | 365 |
1995 | JAMES R SMAIL INC | Brine | 0 | 365 |
1996 | JAMES R SMAIL INC | Brine | 0 | 365 |
1997 | JAMES R SMAIL INC | Brine | 0 | 365 |
1998 | JAMES R SMAIL INC | Brine | 0 | 365 |
1999 | JAMES R SMAIL INC | Brine | 30 | 365 |
2000 | JAMES R SMAIL INC | Brine | 365 | |
2001 | JAMES R SMAIL INC | Brine | 365 | |
2002 | JAMES R SMAIL INC | Brine | 0 | 365 |
2003 | JAMES R SMAIL INC | Brine | 0 | 365 |
2004 | JAMES R SMAIL INC | Brine | 0 | 365 |
2005 | JAMES R SMAIL INC | Brine | 0 | 365 |
2006 | JAMES R SMAIL INC | Brine | 0 | 365 |
2007 | JAMES R SMAIL INC | Brine | 0 | 365 |
2008 | JAMES R SMAIL INC | Brine | 0 | 365 |
2009 | JAMES R SMAIL INC | Brine | 0 | 365 |
2010 | JAMES R SMAIL INC | Brine | 0 | 365 |
2011 | JAMES R SMAIL INC | Brine | 0 | 365 |
2012 | JAMES R SMAIL INC | Brine | 0 | 366 |
2013 | JAMES R SMAIL INC | Brine | 0 | 365 |
2014 | JAMES R SMAIL INC | Brine | 0 | 365 |
2015 | JAMES R SMAIL INC | Brine | 0 | 365 |
2016 | JAMES R SMAIL INC | Brine | 0 | 365 |
2017 | SIGLER CONTRACT PUMPING INC | Brine | 0 | 365 |
2018 | TRANSIT ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
00000PL465 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0601420697 | 2016-10-19 | Production Wells | No Violations | Inspected production well on 10/19/2016. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with a natural gas-powered motor. No problems were noted at the time of the inspection. |
1323160537 | 2016-03-09 | Production Wells | No Violations | Inspected production well on 03/09/2016. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank, and 1-vertical separator located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with a gas-powered motor. No problems were noted at the time of the inspection. |
1387079194 | 2017-02-01 | Production Wells | No Violations | Inspected production well on 02/01/2017. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank, and 1-vertical separator, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with a natural gas-powered motor. No problems were noted at the time of the inspection. |
1538912240 | 2018-07-03 | Production Wells | No Violations | Inspected production well on 07/03/2018. The tank battery consists of 1-100 bbl steel tank, 1-50 bbl steel tank, 1-vertical separator, 1-drip, and 1-meter box, located within an earthen dike. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack; the motor was not present at the time of the inspection. No problems were noted at the time of the inspection. |
For data sources see[9]