If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-073-23409 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.50783257,"lon":-82.69595703,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Hocking | |
Municipality: Perry Township | |
Operator Name: MFC DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: EVELAND-SMITH | |
License Status: Field Inspected, Well Not Found | |
License Date: 2018-01-12 | |
Spud Date: 1996-02-05 | |
Spud Drilling Contractor: LBJ DRILLING | |
Final Drill Date: 1996-02-12 | |
Well Total Depth: 3726 ft | |
Configuration: Vertical | |
Latitude: 39.507832570 | |
Longitude: -82.69595703 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1994-08-22 | Issued Date 8/22/94 Expired Date 8/22/95 Acres 0040000 Tool Type RTF Proposed Formation COPPER RIDGE Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1996-01-19 | 3059 MFC DRILLING INC GeoDate 1/19/96 |
Oil and Gas | 1996-01-19 | Issued Date 1/19/96 Expired Date 1/18/97 Acres 0080000 Tool Type RTF Proposed Formation COPPER RIDGE Proposed Depth 03726 Proposed Drill Depth 03726 |
Original Spud | 1996-02-05 | RI 1-20-96-WELL BELIEVED TO BE PLUGGED, P/A APPLICATION ON FILE AND INSPECTION REPORT IS ON FILE, WAITING FOR MFC TO PRODUCE PLUG REPORT PER KIP THOMPSON 1/12/18-ALE. |
Completed | 1996-02-12 | RI 1-20-96-WELL BELIEVED TO BE PLUGGED, P/A APPLICATION ON FILE AND INSPECTION REPORT IS ON FILE, WAITING FOR MFC TO PRODUCE PLUG REPORT PER KIP THOMPSON 1/12/18-ALE. |
Reached Total Depth | 1996-02-12 | RI 1-20-96-WELL BELIEVED TO BE PLUGGED, P/A APPLICATION ON FILE AND INSPECTION REPORT IS ON FILE, WAITING FOR MFC TO PRODUCE PLUG REPORT PER KIP THOMPSON 1/12/18-ALE. |
CO | 1996-02-20 | 3059 MFC DRILLING INC GeoDate 8/22/94 |
Completion Report Received | 1996-05-03 | RI 1-20-96-WELL BELIEVED TO BE PLUGGED, P/A APPLICATION ON FILE AND INSPECTION REPORT IS ON FILE, WAITING FOR MFC TO PRODUCE PLUG REPORT PER KIP THOMPSON 1/12/18-ALE. |
APP | 2002-07-17 | Proposed Formations:ROSE RUN, Issued Date:7/17/2002, Expired Date:7/17/2003 6:00:00 AM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class: |
Construction Permit Expires | 2003-07-17 | RI 1-20-96-WELL BELIEVED TO BE PLUGGED, P/A APPLICATION ON FILE AND INSPECTION REPORT IS ON FILE, WAITING FOR MFC TO PRODUCE PLUG REPORT PER KIP THOMPSON 1/12/18-ALE. |
Record Last Modified | 2018-01-12 | RI 1-20-96-WELL BELIEVED TO BE PLUGGED, P/A APPLICATION ON FILE AND INSPECTION REPORT IS ON FILE, WAITING FOR MFC TO PRODUCE PLUG REPORT PER KIP THOMPSON 1/12/18-ALE. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3660 | 0 | |
2006-09-11 | 3661 | 3677 | 33 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | NONE |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | MFC DRILLING INC | 18348 | 0 | 125 |
1997 | MFC DRILLING INC | 1733 | 0 | 365 |
1998 | MFC DRILLING INC | 11644 | 0 | 185 |
1999 | MFC DRILLING INC | 2681 | 0 | 365 |
2000 | MFC DRILLING INC | 1700 | 0 | 365 |
2001 | MFC DRILLING INC | 357 | 0 | 365 |
2002 | MFC DRILLING INC | 347 | 65 | 365 |
2003 | MFC DRILLING INC | 0 | 0 | 365 |
2004 | MFC DRILLING INC | 0 | 0 | 365 |
2005 | MFC DRILLING INC | 0 | 0 | 365 |
2006 | MFC DRILLING INC | 0 | 0 | 0 |
2007 | MFC DRILLING INC | 0 | 0 | 365 |
2008 | MFC DRILLING INC | 0 | 0 | 365 |
2009 | MFC DRILLING INC | 0 | 0 | 0 |
2010 | MFC DRILLING INC | 0 | 0 | 0 |
2011 | MFC DRILLING INC | 0 | 0 | 0 |
2012 | MFC DRILLING INC | 0 | 0 | 0 |
2013 | MFC DRILLING INC | 0 | 0 | 365 |
2016 | MFC DRILLING INC | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | MFC DRILLING INC | Brine | 6 | 125 |
1997 | MFC DRILLING INC | Brine | 30 | 365 |
1998 | MFC DRILLING INC | Brine | 36 | 185 |
1999 | MFC DRILLING INC | Brine | 5 | 365 |
2000 | MFC DRILLING INC | Brine | 0 | 365 |
2001 | MFC DRILLING INC | Brine | 54 | 365 |
2002 | MFC DRILLING INC | Brine | 417 | 365 |
2003 | MFC DRILLING INC | Brine | 0 | 365 |
2004 | MFC DRILLING INC | Brine | 0 | 365 |
2005 | MFC DRILLING INC | Brine | 0 | 365 |
2006 | MFC DRILLING INC | Brine | 0 | 0 |
2007 | MFC DRILLING INC | Brine | 0 | 365 |
2008 | MFC DRILLING INC | Brine | 0 | 365 |
2009 | MFC DRILLING INC | Brine | 0 | 0 |
2010 | MFC DRILLING INC | Brine | 0 | 0 |
2011 | MFC DRILLING INC | Brine | 0 | 0 |
2012 | MFC DRILLING INC | Brine | 0 | 0 |
2013 | MFC DRILLING INC | Brine | 0 | 365 |
2016 | MFC DRILLING INC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
01269i1517 | 2002-11-06 | Plug / Plug Back | No Violations | Set rip plug, big lime plug. Trouble pulling 4 1/2 casing at first, rip plug set at 2200ft. |
iANGE00150 | 1998-07-28 | Preliminary Restoration | No Violations |
For data sources see[9]