If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-21679 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.521572261,"lon":-81.4885346,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Cuyahoga | |
Municipality: Euclid | |
Operator Name: BASS ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: THE CITY OF LYNDHURST UNIT | |
License Status: Producing | |
License Date: 2001-03-08 | |
Spud Date: 1999-12-03 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 1999-12-13 | |
Well Total Depth: 3798 ft | |
Configuration: Directional | |
Latitude: 41.521572261 | |
Longitude: -81.48853460 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1999-11-03 | Proposed Formations:CLINTON, NEWBURG, ORISKANY, Issued Date:11/3/99, Expired Date:11/2/2000 6:00:00 AM, Drilling unit acres:20.52, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 1999-12-03 | RBDMS Rec |
Completed | 1999-12-13 | RBDMS Rec |
Reached Total Depth | 1999-12-13 | RBDMS Rec |
Construction Permit Expires | 2000-11-02 | RBDMS Rec |
Completion Report Received | 2001-01-16 | RBDMS Rec |
Correction to Well | 2001-02-16 | CHANGE IN TARGET INFORMATION: FOOTAGE= 1026'SL & 174'EL OF LOT 79; X= 2,276,957 AND Y= 676,427. |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2001-03-08 | 3648 | 3674 | 45 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 1500 Bbl | 0 | 500 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | BASS ENERGY CO INC | 5238 | 0 | 245 |
2001 | BASS ENERGY CO INC | 5648 | 0 | 365 |
2002 | BASS ENERGY CO INC | 10588 | 0 | 365 |
2003 | BASS ENERGY CO INC | 7194 | 0 | 365 |
2004 | BASS ENERGY CO INC | 6369 | 0 | 365 |
2005 | BASS ENERGY CO INC | 4894 | 0 | 365 |
2006 | BASS ENERGY CO INC | 5471 | 0 | 365 |
2007 | BASS ENERGY CO INC | 3769 | 0 | 365 |
2008 | BASS ENERGY CO INC | 3862 | 0 | 365 |
2009 | BASS ENERGY CO INC | 4428 | 0 | 365 |
2010 | BASS ENERGY CO INC | 3459 | 0 | 365 |
2011 | BASS ENERGY CO INC | 2670 | 0 | 0 |
2012 | BASS ENERGY CO INC | 3198 | 0 | 366 |
2013 | BASS ENERGY CO INC | 2486 | 0 | 365 |
2014 | BASS ENERGY CO INC | 2342 | 0 | 365 |
2015 | BASS ENERGY CO INC | 2166 | 0 | 365 |
2016 | BASS ENERGY CO INC | 2485 | 0 | 365 |
2017 | BASS ENERGY CO INC | 2276 | 0 | 365 |
2018 | BASS ENERGY CO INC | 2264 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | BASS ENERGY CO INC | Brine | 993 | 245 |
2001 | BASS ENERGY CO INC | Brine | 122 | 365 |
2002 | BASS ENERGY CO INC | Brine | 158 | 365 |
2003 | BASS ENERGY CO INC | Brine | 93 | 365 |
2004 | BASS ENERGY CO INC | Brine | 152 | 365 |
2005 | BASS ENERGY CO INC | Brine | 122 | 365 |
2006 | BASS ENERGY CO INC | Brine | 118 | 365 |
2007 | BASS ENERGY CO INC | Brine | 38 | 365 |
2008 | BASS ENERGY CO INC | Brine | 19 | 365 |
2009 | BASS ENERGY CO INC | Brine | 103 | 365 |
2010 | BASS ENERGY CO INC | Brine | 125 | 365 |
2011 | BASS ENERGY CO INC | Brine | 126 | |
2012 | BASS ENERGY CO INC | Brine | 117 | 366 |
2013 | BASS ENERGY CO INC | Brine | 149 | 365 |
2014 | BASS ENERGY CO INC | Brine | 38 | 365 |
2015 | BASS ENERGY CO INC | Brine | 99 | 365 |
2016 | BASS ENERGY CO INC | Brine | 18 | 365 |
2017 | BASS ENERGY CO INC | Brine | 75 | 365 |
2018 | BASS ENERGY CO INC | Brine | 78 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0354869658 | 2004-08-09 | Preliminary Restoration | No Violations | |
0643492083 | 2014-02-04 | UrbanProduction Wells | No Violations | I observed the producing unit to be in good condition and no violations noted. No changes since the previous inspection. |
0722342326 | 2011-12-22 | UrbanProduction Wells | No Violations | Urban production well inspection/status check. Inspection conducted and well is in compliance with 1501:9-9-05. This well shares a tank battery with 2-1610. |
1191753158 | 2017-05-23 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. At the time of this inspection, I observed the following: a wellhead with plunger-lift system and tank battery is separate board-on-board enclosures located adjacent to the city hall and maintenance buildings. The battery is shared with the #2-1610 well located on Parkview Drive. The load-lines were plugged, locked and secure. The tank lids were closed and sealed. There was secondary containment which was intact with dry interior and free from signs of spills or leakage. Spark arrestor, low-pressure relief valve, and carbon filter were present and well maintained. ID signage was present and complete. Areas around the wellhead were comprise of turf grass lawn. The battery is located at the edge of the driveway and parking area for the maintenance garage. I walked the areas surrounding the wellhead and battery and found no signs of impact or problems. |
1214213845 | 2013-01-14 | UrbanProduction Wells | No Violations | The producing unit is comprised of the following elements: a two-tank battery, mechanical plunger lift, and wellhead valve asseembly. A mechanical plunger lift is affixed to the wellhead valve assembly. The tank battery and wellhead are in separate board-on-board enclosures. The unit is currently in production. The tank and well spacing is in accordance with 1509:9-9-05 . HB 278 safety equipment is present. Unit identification is present and legible at the tank battery. The tank battery secondary containment is adequate. I did not observe any leaks, spills, or other signs of contamination. The gates are locked. The tank battery is shared with the #1610 unit. |
1425490182 | 2015-03-04 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. The well and battery are located behind the City of Lyndhurst Building Department. The wellhead plunger lift system and battery are in separate enclosures. The gates are secure and locked. Connections and fittings are secure and free from signs of leakage or problems. Process safety equipment is present. Load-outs are plugged and secure. Areas around the wellhead and battery are snow-covered at the time of this inspection. The battery is shared with the #2-1610 well which is accessed from Parkview Drive. I did not observe any evidence of impact relating to on-going production activity. |
For data sources see[9]