If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-21739 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.460265096,"lon":-81.68405339,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Cuyahoga | |
Municipality: Cleveland | |
Operator Name: DUCK CREEK ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: LTV STEEL | |
License Status: Producing | |
License Date: 2003-01-15 | |
Spud Date: 2002-06-02 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2002-06-04 | |
Well Total Depth: 2859 ft | |
Configuration: Vertical | |
Latitude: 41.460265096 | |
Longitude: -81.68405339 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2002-03-05 | Proposed Formations:CLINTON/NEWBURG, Issued Date:3/5/2002, Expired Date:3/5/2003 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2002-06-02 | Ran 11-3/4" conductor pipe to 78'. Ran new 20# 8-5/8" casing (338') set at 348'. Cement circulated to surface. Driller reported a small gas show at approximately 250'. Inspector no present during cementing. Information obtained from job log and daylight driller. |
Completed | 2002-06-04 | Ran 11-3/4" conductor pipe to 78'. Ran new 20# 8-5/8" casing (338') set at 348'. Cement circulated to surface. Driller reported a small gas show at approximately 250'. Inspector no present during cementing. Information obtained from job log and daylight driller. |
Reached Total Depth | 2002-06-04 | Ran 11-3/4" conductor pipe to 78'. Ran new 20# 8-5/8" casing (338') set at 348'. Cement circulated to surface. Driller reported a small gas show at approximately 250'. Inspector no present during cementing. Information obtained from job log and daylight driller. |
Completion Report Received | 2002-11-12 | Ran 11-3/4" conductor pipe to 78'. Ran new 20# 8-5/8" casing (338') set at 348'. Cement circulated to surface. Driller reported a small gas show at approximately 250'. Inspector no present during cementing. Information obtained from job log and daylight driller. |
Construction Permit Expires | 2003-03-05 | Ran 11-3/4" conductor pipe to 78'. Ran new 20# 8-5/8" casing (338') set at 348'. Cement circulated to surface. Driller reported a small gas show at approximately 250'. Inspector no present during cementing. Information obtained from job log and daylight driller. |
Record Last Modified | 2017-02-15 | Ran 11-3/4" conductor pipe to 78'. Ran new 20# 8-5/8" casing (338') set at 348'. Cement circulated to surface. Driller reported a small gas show at approximately 250'. Inspector no present during cementing. Information obtained from job log and daylight driller. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-01-15 | 2741 | 2759 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 1500 Bbl | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | DUCK CREEK ENERGY INC | 0 | 0 | 0 |
2003 | DUCK CREEK ENERGY INC | 13032 | 0 | 365 |
2004 | DUCK CREEK ENERGY INC | 8496 | 69 | 365 |
2005 | DUCK CREEK ENERGY INC | 6299 | 0 | 365 |
2006 | DUCK CREEK ENERGY INC | 3720 | 0 | 365 |
2007 | DUCK CREEK ENERGY INC | 3158 | 0 | 365 |
2008 | DUCK CREEK ENERGY INC | 2273 | 0 | 365 |
2009 | DUCK CREEK ENERGY INC | 1024 | 0 | 365 |
2010 | DUCK CREEK ENERGY INC | 2432 | 0 | 365 |
2011 | DUCK CREEK ENERGY INC | 1256 | 0 | 365 |
2012 | DUCK CREEK ENERGY INC | 321 | 0 | 366 |
2013 | DUCK CREEK ENERGY INC | 4 | 44 | 365 |
2014 | DUCK CREEK ENERGY INC | 0 | 0 | 365 |
2015 | DUCK CREEK ENERGY INC | 0 | 0 | 365 |
2016 | DUCK CREEK ENERGY INC | 0 | 0 | 365 |
2017 | DUCK CREEK ENERGY INC | 0 | 0 | 365 |
2018 | DUCK CREEK ENERGY INC | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | DUCK CREEK ENERGY INC | Brine | 0 | 0 |
2003 | DUCK CREEK ENERGY INC | Brine | 1632 | 365 |
2004 | DUCK CREEK ENERGY INC | Brine | 797 | 365 |
2005 | DUCK CREEK ENERGY INC | Brine | 585 | 365 |
2006 | DUCK CREEK ENERGY INC | Brine | 520 | 365 |
2007 | DUCK CREEK ENERGY INC | Brine | 1011 | 365 |
2008 | DUCK CREEK ENERGY INC | Brine | 914 | 365 |
2009 | DUCK CREEK ENERGY INC | Brine | 925 | 365 |
2010 | DUCK CREEK ENERGY INC | Brine | 806 | 365 |
2011 | DUCK CREEK ENERGY INC | Brine | 686 | 365 |
2012 | DUCK CREEK ENERGY INC | Brine | 310 | 366 |
2013 | DUCK CREEK ENERGY INC | Brine | 86 | 365 |
2014 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2015 | DUCK CREEK ENERGY INC | Brine | 95 | 365 |
2016 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2017 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2018 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0009879351 | 2002-06-04 | Drill / Deepen / Reopen | No Violations | While on site to pick up surface cement ticket on 06/03/02, noted that the pit liners on the back pit were torn or ripped in several places and requested that drilling contractor (Capstar) install liners properly and redirect blow line to prevent cutting through the liner. This inspection was to confirm that the requested action had been taken, which it had. Also took the opportunity to meet with Dave Mansbery (Duck Creek) and Brad Nelson (BoCor) regarding their plans for developing this field. |
0014479591 | 2002-07-22 | Production Wells | No Violations | Status check on recently drilled well. Pits have been closed and the site has been rough graded. Additional work necessary to pass preliminary restoration. |
For data sources see[9]