If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-22060 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.433165078,"lon":-81.4019887,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Cuyahoga | |
Municipality: Chagrin falls Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: JACKSON | |
License Status: Producing | |
License Date: 2009-02-27 | |
Spud Date: 2008-09-27 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2008-10-02 | |
Well Total Depth: 3744 ft | |
Configuration: Vertical | |
Latitude: 41.433165078 | |
Longitude: -81.40198870 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-07-15 | Proposed Formations:ORISKANY/NEWBURG/CLINTON, Issued Date:7/15/2008, Expired Date:7/15/2009 6:00:00 AM, Drilling unit acres:34.65, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2008-10-02 | |
Completion Report Received | 2009-01-02 | |
Construction Permit Expires | 2009-07-15 | |
Change of Owner | 2018-08-21 | Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2018-08-21 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-02-20 | 3556 | 3616 | 26 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 67000 Gal | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | GONZOIL INC | 18486 | 283 | 365 |
2010 | GONZOIL INC | 19243 | 87 | 365 |
2011 | GONZOIL INC | 14375 | 170 | 365 |
2012 | GONZOIL INC | 12386 | 80 | 366 |
2013 | GONZOIL INC | 9805 | 0 | 365 |
2014 | GONZOIL INC | 8301 | 85 | 365 |
2015 | GONZOIL INC | 6952 | 0 | 365 |
2016 | GONZOIL INC | 6484 | 75 | 365 |
2017 | GONZOIL INC | 7116 | 33 | 365 |
2018 | PIN OAK ENERGY PARTNERS LLC | 1138 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | GONZOIL INC | Brine | 378 | 365 |
2010 | GONZOIL INC | Brine | 245 | 365 |
2011 | GONZOIL INC | Brine | 130 | 365 |
2012 | GONZOIL INC | Brine | 135 | 366 |
2013 | GONZOIL INC | Brine | 120 | 365 |
2014 | GONZOIL INC | Brine | 40 | 365 |
2015 | GONZOIL INC | Brine | 0 | 365 |
2016 | GONZOIL INC | Brine | 0 | 365 |
2017 | GONZOIL INC | Brine | 75 | 365 |
2018 | GONZOIL INC | Brine | 0 | 180 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0152273984 | 2008-10-01 | Drill / Deepen / Reopen | No Violations | Drilling approx 3600 No violation found , fences up (pit,silt), no off site run off. |
0247480513 | 2008-10-02 | Drill / Deepen / Reopen | No Violations | company (Doug Gonzilus) called to say the rig has TD and 4.5 casing to be run and cemented tonight |
0661821541 | 2008-09-26 | Drill / Deepen / Reopen | No Violations | Rig move to location on Saturday morning. |
1001420862 | 2008-09-27 | Drill / Deepen / Reopen | No Violations | arrived on site for 11 3/4 conductor cement job. |
1225718900 | 2008-09-24 | Drill / Deepen / Reopen | No Violations | Doug Gonzalus Called to say location is made and He also made calls made to city. |
1231168733 | 2008-11-03 | Drill / Deepen / Reopen | No Violations | area levaled tanks on site not set |
1248925114 | 2017-07-07 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. The wellhead plunger lift and battery are in separate board-on-board enclosures which were locked and secure. Fittings and connections are secure and free from signs of leakage or problems. The load-outs are secure, plugged, and locked. The secondary containment was intact. I walked the areas around the wellhead and battery and found no observable signs of impact to the natural greenscape. |
1373300319 | 2013-07-08 | UrbanPreliminary Restoration | No Violations | The producing unit consists of a an above-ground storage tank (AST) battery with 1 140-barrel steel production tank, and 1 50-barrel poly brine tank, a mechanical separator, and metering run. Identification is present. There is an earthen secondary containment which is in good condition. The load-outs are bull-plugged and locked. Safety equipment is present. The wellhead is located 50 feet southwest of the battery. The wellhead consists of a mechanical plunger lift system and associated valve-tree. The annulus is plumbed into the production line. The wellhead and battery are in separate board-on-board enclosures which are locked. The lease road is paved with mixed, coarse limestone aggregate. I did not observe any problems or violations. Preliminary restoration passes. |
1425048385 | 2015-02-27 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. The wellhead and battery are located in a small clearing in a mostly wooded area. The wellhead plunger lift and battery are in separate board-on-board enclosures which are locked. Fittings and connections are secure and free from signs of leakage or problems. The load-outs are secure, plugged, and locked. Process safety gear is present. Signage is in place and current. At the time of this inspection there are 15 to 20 inches of snow cover in the area which obscures some surficial elements from observation. |
1670174437 | 2008-09-28 | Drill / Deepen / Reopen | No Violations | 85/8 casing was cemented on Sunday night |
2100873198 | 2008-10-09 | Drill / Deepen / Reopen | No Violations | Doug Gonzoilus. called to infome me pits are to be soildified. |
For data sources see[9]