X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-23676

Well Details

Well ID: 34-155-23676
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Warren
Operator Name: PIN OAK ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: SCHOONOVER
License Status: Producing
License Date: 1999-01-07
Spud Date: 1998-10-01
Spud Drilling Contractor: ROSE RUN DRILLING
Final Drill Date: 1998-10-07
Well Total Depth: 4700 ft
Configuration: Directional
Latitude: 41.259206937
Longitude: -80.85646240

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 1998-05-15 2816 P & S ENERGY INC Proposed Formation CLINTON Issued Date 5/15/98 Expired Date 5/15/99 6:00:00 AM
Correction to Well 1998-05-22 TARGET LOCATION INFORMATION ADDED TO PERMIT: 805'NL & 225'EL OF LOT 11; X=2,452,300 AND Y=584,800; ELEVATION: 904. VARIANCE SHALL NOT EXCEED 5%.
Original Spud 1998-10-01 VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%.
Completed 1998-10-07 VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%.
Reached Total Depth 1998-10-07 VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%.
Completion Report Received 1998-11-16 VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%.
Correction to Well 1998-12-11 CORRECT TARGET LOCATION: 800' NL & 515'WL OF LOT 11; TARGET X COORDINATE: 2,452,307
Construction Permit Expires 1999-05-15 VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%.
Change of Owner 2019-02-26 Operator changed from 2816, P & S ENERGY INC to 9722, PIN OAK ENERGY PARTNERS LLC
Record Last Modified 2019-02-26 VARIANCE SHALL NOT EXCEED 5%.VARIANCE SHALL NOT EXCEED 5%.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1999-01-07 4428 4518 96

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 114500 Gal 83300 300 GALLONS FE/HCL ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1998 P & S ENERGY INC 2999 160 365
1999 P & S ENERGY INC 48709 452 365
2000 P & S ENERGY INC 38858 157 365
2001 P & S ENERGY INC 25194 76 365
2002 P & S ENERGY INC 20697 74 365
2003 P & S ENERGY INC 18969 0 365
2004 P & S ENERGY INC 17730 78 365
2005 P & S ENERGY INC 14487 0 365
2006 P & S ENERGY INC 13513 69 365
2007 P & S ENERGY INC 11674 0 365
2008 P & S ENERGY INC 9264 46 295
2009 P & S ENERGY INC 10594 0 365
2010 P & S ENERGY INC 13705 61 365
2011 P & S ENERGY INC 14340 0 365
2012 P & S ENERGY INC 12778 0 366
2013 P & S ENERGY INC 11474 0 365
2014 P & S ENERGY INC 9608 0 365
2015 P & S ENERGY INC 8147 35 365
2016 P & S ENERGY INC 9140 0 365
2017 P & S ENERGY INC 10635 0 365
2018 P & S ENERGY INC 8722 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1998 P & S ENERGY INC Brine 191 365
1999 P & S ENERGY INC Brine 112 365
2000 P & S ENERGY INC Brine 0 365
2001 P & S ENERGY INC Brine 52 365
2002 P & S ENERGY INC Brine 0 365
2003 P & S ENERGY INC Brine 0 365
2004 P & S ENERGY INC Brine 0 365
2005 P & S ENERGY INC Brine 0 365
2006 P & S ENERGY INC Brine 0 365
2007 P & S ENERGY INC Brine 0 365
2008 P & S ENERGY INC Brine 1 295
2009 P & S ENERGY INC Brine 0 365
2010 P & S ENERGY INC Brine 0 365
2011 P & S ENERGY INC Brine 0 365
2012 P & S ENERGY INC Brine 0 366
2013 P & S ENERGY INC Brine 0 365
2014 P & S ENERGY INC Brine 0 365
2015 P & S ENERGY INC Brine 61 365
2016 P & S ENERGY INC Brine 0 365
2017 P & S ENERGY INC Brine 0 365
2018 P & S ENERGY INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1349372592 2012-10-04 UrbanProduction Wells No Violations I completed a production well inspection status check. My inspection found the well equipped with a plunger lift unit (rabbit) that was in good condition. The tank battery contained one, 100 barrel oil storage tanks, one, 50 barrel brine storage tank, a separators, and the proper identification. I noticed no visible spills or leaks. The lease road was in good condition. There are no violations at this time.
1425381822 2015-02-24 UrbanProduction Wells No Violations I was on location for a status check. During my inspection, I found the well in production. The well was equipped with a plunger lift assembly. The tank battery consisted of a 100 barrel production tank, a 50 barrel brine tank and a mechanical separator. A dike surrounded the tank battery. Identification signs were posted at the well and tank battery. Locked, chain link fences with barb wire surrounded the tank battery. There was a plug on the load line. The lease road was in stable condition. The well was placed into production prior to House Bill 278.
2075347235 2004-02-26 Preliminary Restoration No Violations Restoration approved .

For data sources see[9]

References