X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-23679

Well Details

Well ID: 34-155-23679
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Howland Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: DEUTSCH
License Status: Producing
License Date: 1998-11-16
Spud Date: 1998-07-17
Spud Drilling Contractor: DOWNHOLE DRILLING
Final Drill Date: 1998-07-24
Well Total Depth: 5026 ft
Configuration: Directional
Latitude: 41.234899680
Longitude: -80.80806797

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 1998-06-25 84 EVERFLOW EASTERN PTNS L P Proposed Formation CLINTON Issued Date 6/25/98 Expired Date 6/25/99 6:00:00 AM
Original Spud 1998-07-17 RBDMS Rec
Completed 1998-07-24 RBDMS Rec
Reached Total Depth 1998-07-24 RBDMS Rec
Completion Report Received 1998-09-08 RBDMS Rec
Construction Permit Expires 1999-06-25 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1998-11-16 4784 4903 92

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 122000 Gal 100000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1999 EVERFLOW EASTERN PTNS L P 361 0 60
2000 EVERFLOW EASTERN PTNS L P 15475 381 365
2001 EVERFLOW EASTERN PTNS L P 20014 143 365
2002 EVERFLOW EASTERN PTNS L P 13281 256 365
2003 EVERFLOW EASTERN PTNS L P 15443 396 365
2004 EVERFLOW EASTERN PTNS L P 13382 481 365
2005 EVERFLOW EASTERN PTNS L P 11479 310 365
2006 EVERFLOW EASTERN PTNS L P 10720 270 365
2007 EVERFLOW EASTERN PTNS L P 8961 297 365
2008 EVERFLOW EASTERN PTNS L P 9221 141 365
2009 EVERFLOW EASTERN PTNS L P 7125 117 365
2010 EVERFLOW EASTERN PTNS L P 7618 184 365
2011 EVERFLOW EASTERN PTNS L P 8136 179 365
2012 EVERFLOW EASTERN PTNS L P 8269 186 336
2013 EVERFLOW EASTERN PTNS L P 8636 209 365
2014 EVERFLOW EASTERN PTNS L P 7714 143 365
2015 EVERFLOW EASTERN PTNS L P 7237 132 365
2016 EVERFLOW EASTERN PTNS L P 84 0 365
2017 EVERFLOW EASTERN PTNS L P 6568 120 365
2018 EVERFLOW EASTERN PTNS L P 7103 132 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1999 EVERFLOW EASTERN PTNS L P Brine 357 60
2000 EVERFLOW EASTERN PTNS L P Brine 1649 365
2001 EVERFLOW EASTERN PTNS L P Brine 1388 365
2002 EVERFLOW EASTERN PTNS L P Brine 1254 365
2003 EVERFLOW EASTERN PTNS L P Brine 1400 365
2004 EVERFLOW EASTERN PTNS L P Brine 1233 365
2005 EVERFLOW EASTERN PTNS L P Brine 1274 365
2006 EVERFLOW EASTERN PTNS L P Brine 1112 365
2007 EVERFLOW EASTERN PTNS L P Brine 1076 365
2008 EVERFLOW EASTERN PTNS L P Brine 1110 365
2009 EVERFLOW EASTERN PTNS L P Brine 865 365
2010 EVERFLOW EASTERN PTNS L P Brine 1293 365
2011 EVERFLOW EASTERN PTNS L P Brine 1062 365
2012 EVERFLOW EASTERN PTNS L P Brine 1081 336
2013 EVERFLOW EASTERN PTNS L P Brine 1226 365
2014 EVERFLOW EASTERN PTNS L P Brine 1184 365
2015 EVERFLOW EASTERN PTNS L P Brine 1088 365
2016 EVERFLOW EASTERN PTNS L P Brine 467 365
2017 EVERFLOW EASTERN PTNS L P Brine 1458 365
2018 EVERFLOW EASTERN PTNS L P Brine 1280 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0748189564 2004-02-27 Preliminary Restoration No Violations Restoration approved .
1360073278 2013-02-05 UrbanProduction Wells No Violations My inspection found the well equipped with a plunger lift unit. It had the proper identification sign and surrounded by steel posts. The tank battery had the proper dike. It contained one, 100 barrel production tank, one, 50 barrel brine tank, and a separator. There was a plug on the load line. The separator had a 7 day production chart. The lease road was the parking lot for Mays Towing. The production records were up to date in our database. This well was placed into production prior to House Bill 278.
1712712975 2015-12-29 UrbanProduction Wells No Violations I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a plunger lift assembly. The tank battery has a 100 barrel production tank, a 50 barrel brine tank and a mechanical separator. There are identification signs properly posted at the well and tank battery. A dike surrounds the tank battery. The lease road is in good repair.

For data sources see[9]

References