X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22826

Well Details

Well ID: 34-153-22826
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Portage Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: SELLE UNIT
License Status: Producing
License Date: 1995-09-05
Spud Date: 1995-09-12
Spud Drilling Contractor: J & J DIRECTIONAL SERVICE
Final Drill Date: 1995-09-24
Well Total Depth: 3954 ft
Configuration: Directional
Latitude: 41.072692922
Longitude: -81.52235971

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1995-09-05 84 EVERFLOW EASTERN PTNS L P GeoDate 9/5/95
Oil and Gas 1995-09-05 Issued Date 9/5/95 Expired Date 9/4/96 Acres 0031700 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03954 Proposed Drill Depth 03954
Original Spud 1995-09-12 CORR TGT 6-29-96
Completed 1995-09-24 CORR TGT 6-29-96
Reached Total Depth 1995-09-24 CORR TGT 6-29-96
Completion Report Received 1995-10-12 CORR TGT 6-29-96
Construction Permit Expires 1996-09-04 CORR TGT 6-29-96
Record Last Modified 2017-02-15 CORR TGT 6-29-96

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 3715 3817 0
2006-09-11 3742 3817 48

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 120000 Gal 80000 FRAC W/120M GAL H20 & 80M# SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1995 EVERFLOW EASTERN PTNS L P 0 0 365
1996 EVERFLOW EASTERN PTNS L P 0 0 365
1997 EVERFLOW EASTERN PTNS L P 3019 397 365
1998 EVERFLOW EASTERN PTNS L P 78161 2023 365
1999 EVERFLOW EASTERN PTNS L P 60469 1069 365
2000 EVERFLOW EASTERN PTNS L P 39500 810 365
2001 EVERFLOW EASTERN PTNS L P 31452 598 365
2002 EVERFLOW EASTERN PTNS L P 10227 93 365
2003 EVERFLOW EASTERN PTNS L P 23544 769 365
2004 EVERFLOW EASTERN PTNS L P 21776 583 365
2005 EVERFLOW EASTERN PTNS L P 15032 282 365
2006 EVERFLOW EASTERN PTNS L P 8878 399 365
2007 EVERFLOW EASTERN PTNS L P 9636 349 365
2008 EVERFLOW EASTERN PTNS L P 11006 363 365
2009 EVERFLOW EASTERN PTNS L P 8041 183 365
2010 EVERFLOW EASTERN PTNS L P 7676 340 365
2011 EVERFLOW EASTERN PTNS L P 11237 484 365
2012 EVERFLOW EASTERN PTNS L P 8319 341 366
2013 EVERFLOW EASTERN PTNS L P 6495 257 365
2014 EVERFLOW EASTERN PTNS L P 3947 128 245
2015 EVERFLOW EASTERN PTNS L P 6894 281 365
2016 EVERFLOW EASTERN PTNS L P 1444 0 365
2017 EVERFLOW EASTERN PTNS L P 4232 227 365
2018 EVERFLOW EASTERN PTNS L P 6840 431 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1995 EVERFLOW EASTERN PTNS L P Brine 0 365
1996 EVERFLOW EASTERN PTNS L P Brine 0 365
1997 EVERFLOW EASTERN PTNS L P Brine 252 365
1998 EVERFLOW EASTERN PTNS L P Brine 42 365
1999 EVERFLOW EASTERN PTNS L P Brine 64 365
2000 EVERFLOW EASTERN PTNS L P Brine 69 365
2001 EVERFLOW EASTERN PTNS L P Brine 42 365
2002 EVERFLOW EASTERN PTNS L P Brine 0 365
2003 EVERFLOW EASTERN PTNS L P Brine 54 365
2004 EVERFLOW EASTERN PTNS L P Brine 37 365
2005 EVERFLOW EASTERN PTNS L P Brine 0 365
2006 EVERFLOW EASTERN PTNS L P Brine 40 365
2007 EVERFLOW EASTERN PTNS L P Brine 69 365
2008 EVERFLOW EASTERN PTNS L P Brine 32 365
2009 EVERFLOW EASTERN PTNS L P Brine 0 365
2010 EVERFLOW EASTERN PTNS L P Brine 98 365
2011 EVERFLOW EASTERN PTNS L P Brine 76 365
2012 EVERFLOW EASTERN PTNS L P Brine 62 366
2013 EVERFLOW EASTERN PTNS L P Brine 0 365
2014 EVERFLOW EASTERN PTNS L P Brine 28 245
2015 EVERFLOW EASTERN PTNS L P Brine 0 365
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 50 365
2018 EVERFLOW EASTERN PTNS L P Brine 28 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000018216 Preliminary Restoration No Violations PASSED Y WITNESSED 9/30/96 INSPECTOR NORBERT LOWDER DATE 09/3019/96 DATA FROM OLD VAX INFO
0546972433 2008-02-05 Production Wells No Violations Status check inspection found no violations at this time. Everflow may be relocating the tank battery at the request of the landowner.
1455734083 2016-02-18 UrbanProduction Wells No Violations The Selle Unit # 1 - D was drilled and completed in 9/96. The Selle # 1 - D was drilled as a directional well with a 316 deviation to the N E. It was located in the parking lot of the Selle Generator Works. Well construction consisted of 410 of 8.625 surface casing ( cemented with 200 sacks of cement ) and 3940 of 4.5 production casing ( cemented with 300 sacks of cement ). The well was current in the reporting of oil, gas and brine production. The well was last produced from 12/9/15 to 12/23/15 and is on a schedule of two (2) weeks on every three (3) months due to market conditions. The well is operated as a plunger lift well. The well head is fenced and locked. The required signage was present and legible and posted on the well head fence. I did not identify any leaks or contamination on the well head piping and fittings. The tank battery had a concrete dike surrounding the production equipment. The production equipment was comprised of a 100 barrel oil tank, a 50 barrel brine tank and a 2408 mechanical separator with an orifice meter. There was not a chart on the meter due to the shut in status of the well. The load lines were locked and plugged. The required signage was posted and legible. The tank battery was free of leaks and contamination. The Selle # 1 - D was in compliance with OAC 1501 and ORC 1509 at the time of this inspection.
1857247969 2004-01-07 Production Wells No Violations Status check inspection - no violations at this time.

For data sources see[9]

References