If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23036 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.120077511,"lon":-81.55443337,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Portage Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: STAN HYWET UNIT | |
License Status: Producing | |
License Date: 2008-09-17 | |
Spud Date: 2008-04-16 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2008-04-26 | |
Well Total Depth: 4364 ft | |
Configuration: Directional | |
Latitude: 41.120077511 | |
Longitude: -81.55443337 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-12-31 | Proposed Formations:CLINTON, Issued Date:12/31/2007, Expired Date:12/30/2008 6:00:00 AM, Drilling unit acres:20.36, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2008-01-04 | CORRECTION TO LEASE NAME, SHOULD BE "STAN HYWET UNIT". |
Plugged Back | 2008-04-21 | |
Reached Total Depth | 2008-04-26 | |
Completion Report Received | 2008-05-27 | |
Correction to Well | 2008-08-15 | CORRECTION TO TARGET INFORMATION: NEW FOOTAGE= 965'NL & 2695'WL OF LOT 6, X= 2,259,125, Y= 530, 455 ELEV= 1012' |
Construction Permit Expires | 2008-12-30 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-09-16 | 4136 | 4158 | 42 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2322 Bbl | 80000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | EVERFLOW EASTERN PTNS L P | 1316 | 413 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | 25901 | 718 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | 17141 | 365 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | 16257 | 466 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | 16217 | 488 | 366 |
2013 | EVERFLOW EASTERN PTNS L P | 13684 | 298 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | 10254 | 333 | 365 |
2015 | EVERFLOW EASTERN PTNS L P | 9238 | 204 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | 7586 | 215 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | 3936 | 114 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | 4862 | 197 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | EVERFLOW EASTERN PTNS L P | Brine | 105 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | Brine | 453 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | Brine | 364 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | Brine | 349 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | Brine | 307 | 366 |
2013 | EVERFLOW EASTERN PTNS L P | Brine | 153 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | Brine | 81 | 365 |
2015 | EVERFLOW EASTERN PTNS L P | Brine | 112 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | Brine | 86 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | Brine | 79 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | Brine | 268 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0196461727 | 2008-05-23 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and covered over. No violations at this time. |
0200873610 | 2008-05-07 | Drill / Deepen / Reopen | No Violations | J-Well and Universal Well Service are on site to frac the well. The drilling pits are open, fenced, lined and in good condition. No violations at this time. |
0233079355 | 2008-04-18 | Drill / Deepen / Reopen | No Violations | Union is drilling ahead. The pits are lined, fenced and in good condition. |
0305324968 | 2008-04-23 | Drill / Deepen / Reopen | No Violations | Union is drilling ahead. The pits are lined, fenced and in good condition. |
0399517687 | 2008-04-30 | Drill / Deepen / Reopen | No Violations | Union Drilling has moved off. The pits are fenced, lined and in good condition with sufficient freeboard. |
0672249506 | 2009-06-04 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1196514919 | 2008-05-13 | Drill / Deepen / Reopen | No Violations | The drilling pits are still open, lined and fenced. |
1516112554 | 2018-01-05 | UrbanProduction Wells | No Violations | Access was gained on a graveled road. The well was configured to operated as an electric pumping well. Visible wellhead construction included 2.375 tubing, with rods, inside of 4.5 production casing. The 8.625 annulus was monitored through a two (2) inch riser which was open. I did not see any flow from the riser. An I.D. sign was posted and legible at the wellhead. A variance was approved previously to eliminate the fencing and landscaping requirements. The entire area was fenced and afforded limited access. The tank battery was shared with Stan Hywet # 1, # 4-D, # 3-D and 2-D wells. The combined tank battery consisted of four (4) 210 barrel stock tanks, one (1) 100 barrel brine tank, one (1) 50 barrel brine, five (5) 2408 horizontal separators and gas meters. The tank battery was fenced and surrounded with an earthen dike. The load lines were locked and plugged. The I.D. signage was posted and legible. I did not find any leaks at the tank battery. No violations found during this inspection. |
1525192139 | 2008-04-15 | Drill / Deepen / Reopen | No Violations | Union Drilling Rig 24 is moving on site and should spud the well later tonight. During the move, a truck belonging to Tiger Trucking caught an overhead power line, snapped the pole and broke open an electric transformer. Both Ohio Edison and OEPA-DERR responded to the incident. |
1820019458 | 2008-04-16 | Drill / Deepen / Reopen | No Violations | Union Drilling Rig 24 is drilling surface hole and should be ready to set surface casing later tonight. The drilling pits are lined and fenced. No violations at this time. |
1911609563 | 2008-12-11 | Production Wells | No Violations | The well is in production. The ID is posted at the entrance gate and the entire property is fenced. Preliminary restoration will be required by the end of January. The affected area needs some additional seeding. |
For data sources see[9]