If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-22477 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.478894961,"lon":-81.27602501,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Warren Township | |
Operator Name: AIM ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: GRIMM- ROBY UNIT | |
License Status: Producing | |
License Date: 1975-09-16 | |
Spud Date: 1975-09-30 | |
Spud Drilling Contractor: | |
Final Drill Date: 1975-10-08 | |
Well Total Depth: 5560 ft | |
Configuration: Vertical | |
Latitude: 40.478894961 | |
Longitude: -81.27602501 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1975-09-16 | 18 MUTUAL OIL & GAS CO GeoDate 9/16/75 |
Original Spud | 1975-09-30 | |
Completed | 1975-10-08 | |
Reached Total Depth | 1975-10-08 | |
Change of Owner | 2000-01-04 | Operator changed from 18, MUTUAL OIL & GAS CO to 1383, OHIO L & M CO INC |
Change of Owner | 2007-02-22 | Operator changed from 1383, OHIO L & M CO INC to 8175, AIM ENERGY LLC |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5394 | 5428 | 15 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1335 Bbl | 49500 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MUTUAL OIL & GAS CO | 2311 | 364 | 0 |
1985 | MUTUAL OIL & GAS CO | 2064 | 810 | 0 |
1986 | MUTUAL OIL & GAS CO | 2436 | 801 | 365 |
1987 | MUTUAL OIL & GAS CO | 2138 | 708 | 365 |
1988 | MUTUAL OIL & GAS CO | 1809 | 630 | 365 |
1989 | MUTUAL OIL & GAS CO | 2802 | 0 | 365 |
1990 | MUTUAL OIL & GAS CO | 1609 | 486 | 365 |
1991 | MUTUAL OIL & GAS CO | 1510 | 476 | 365 |
1992 | MUTUAL OIL & GAS CO | 1489 | 458 | 365 |
1993 | MUTUAL OIL & GAS CO | 1131 | 343 | 365 |
1994 | MUTUAL OIL & GAS CO | 1096 | 379 | 365 |
1995 | MUTUAL OIL & GAS CO | 1056 | 256 | 365 |
1996 | MUTUAL OIL & GAS CO | 955 | 254 | 365 |
1997 | MUTUAL OIL & GAS CO | 1187 | 417 | 365 |
1998 | MUTUAL OIL & GAS CO | 853 | 253 | 365 |
2000 | OHIO L & M CO INC | 161 | 379 | 365 |
2001 | OHIO L & M CO INC | 447 | 156 | 365 |
2002 | OHIO L & M CO INC | 836 | 244 | 365 |
2003 | OHIO L & M CO INC | 896 | 141 | 365 |
2004 | OHIO L & M CO INC | 813 | 269 | 365 |
2005 | CGAS EXPLORATION | 1574 | 118 | 365 |
2006 | ALLIANCE PETROLEUM CORPORATION | 612 | 184 | 365 |
2007 | AIM ENERGY LLC | 444 | 310 | 365 |
2008 | AIM ENERGY LLC | 350 | 287 | 365 |
2009 | AIM ENERGY LLC | 323 | 264 | 365 |
2010 | AIM ENERGY LLC | 280 | 347 | 365 |
2011 | AIM ENERGY LLC | 168 | 121 | 0 |
2012 | AIM ENERGY LLC | 187 | 191 | 366 |
2013 | AIM ENERGY LLC | 505 | 221 | 365 |
2014 | AIM ENERGY LLC | 378 | 207 | 365 |
2015 | AIM ENERGY LLC | 609 | 162 | 365 |
2016 | AIM ENERGY LLC | 313 | 28 | 365 |
2017 | AIM ENERGY LLC | 51 | 0 | 365 |
2018 | AIM ENERGY LLC | 79 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MUTUAL OIL & GAS CO | Brine | 0 | 0 |
1985 | MUTUAL OIL & GAS CO | Brine | 180 | 0 |
1986 | MUTUAL OIL & GAS CO | Brine | 120 | 365 |
1987 | MUTUAL OIL & GAS CO | Brine | 140 | 365 |
1988 | MUTUAL OIL & GAS CO | Brine | 135 | 365 |
1989 | MUTUAL OIL & GAS CO | Brine | 0 | 365 |
1990 | MUTUAL OIL & GAS CO | Brine | 90 | 365 |
1991 | MUTUAL OIL & GAS CO | Brine | 108 | 365 |
1992 | MUTUAL OIL & GAS CO | Brine | 90 | 365 |
1993 | MUTUAL OIL & GAS CO | Brine | 90 | 365 |
1994 | MUTUAL OIL & GAS CO | Brine | 120 | 365 |
1995 | MUTUAL OIL & GAS CO | Brine | 120 | 365 |
1996 | MUTUAL OIL & GAS CO | Brine | 90 | 365 |
1997 | MUTUAL OIL & GAS CO | Brine | 0 | 365 |
1998 | MUTUAL OIL & GAS CO | Brine | 59 | 365 |
2000 | OHIO L & M CO INC | Brine | 0 | 365 |
2001 | OHIO L & M CO INC | Brine | 0 | 365 |
2002 | OHIO L & M CO INC | Brine | 0 | 365 |
2003 | OHIO L & M CO INC | Brine | 0 | 365 |
2004 | OHIO L & M CO INC | Brine | 0 | 365 |
2005 | CGAS EXPLORATION | Brine | 0 | 365 |
2006 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2007 | AIM ENERGY LLC | Brine | 99 | 365 |
2008 | AIM ENERGY LLC | Brine | 66 | 365 |
2009 | AIM ENERGY LLC | Brine | 129 | 365 |
2010 | AIM ENERGY LLC | Brine | 90 | 365 |
2011 | AIM ENERGY LLC | Brine | 0 | |
2012 | AIM ENERGY LLC | Brine | 141 | 366 |
2013 | AIM ENERGY LLC | Brine | 78 | 365 |
2014 | AIM ENERGY LLC | Brine | 70 | 365 |
2015 | AIM ENERGY LLC | Brine | 67 | 365 |
2016 | AIM ENERGY LLC | Brine | 12 | 365 |
2017 | AIM ENERGY LLC | Brine | 0 | 365 |
2018 | AIM ENERGY LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0040823240 | 2018-11-05 | Production Wells | No Violations | Upon my arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 2.375 inch tubing, rods, and a pumping unit ran with an electric motor. The unit was running at the time of the inspection. The production equipment included two steel 210 barrel tanks, a concrete vault, a vertical separator and a chart recorder with a 2 by .125 inch orifice plate within an earthen dike. The production report was up to date and proper identification was present. |
For data sources see[9]