If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22969 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.068163198,"lon":-80.74818968,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Austintown Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: WOLFE UNIT | |
License Status: Producing | |
License Date: 2005-03-03 | |
Spud Date: 2004-12-05 | |
Spud Drilling Contractor: ROSE RUN DRILLING | |
Final Drill Date: 2004-12-12 | |
Well Total Depth: 5601 ft | |
Configuration: Directional | |
Latitude: 41.068163198 | |
Longitude: -80.74818968 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2004-06-01 | 84 EVERFLOW EASTERN PTNS L P Proposed Formation CLINTON Issued Date 6/1/2004 Expired Date 6/1/2005 6:00:00 AM |
Inspector Comments Cement Job | 2004-12-05 | No predicted sand and gravel encountered. Hole took fluid but circulated cement. Approximately 20 bbls of returns. Cement stayed up.Cement Ticket Notes Inspector Reporting PATRICK JONNIE |
Original Spud | 2004-12-05 | RBDMS Rec |
Completed | 2004-12-12 | RBDMS Rec |
Reached Total Depth | 2004-12-12 | RBDMS Rec |
Completion Report Received | 2005-01-14 | RBDMS Rec |
Correction to Well | 2005-02-04 | CORRECTION TO TARGET INFORMATION: SOURCE OF LOCATION: AS DRILLED SURVEY; TARGET FOOTAGE: 1750' SL & 10,040'EL OF TWP. (IN GREAT LOT 20); COORDINATES: X= 2,483,171 Y= 514,891. ELEV.= 1178'. |
Construction Permit Expires | 2005-06-01 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2005-03-03 | 5343 | 5420 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 2905 Bbl | 100000 | 1000 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2004 | EVERFLOW EASTERN PTNS L P | 0 | 0 | 0 |
2005 | EVERFLOW EASTERN PTNS L P | 17367 | 57 | 365 |
2006 | EVERFLOW EASTERN PTNS L P | 15358 | 62 | 365 |
2007 | EVERFLOW EASTERN PTNS L P | 10177 | 0 | 365 |
2008 | EVERFLOW EASTERN PTNS L P | 10037 | 0 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | 7572 | 55 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | 6057 | 0 | 181 |
2011 | EVERFLOW EASTERN PTNS L P | 3786 | 0 | 197 |
2012 | EVERFLOW EASTERN PTNS L P | 2397 | 0 | 156 |
2013 | EVERFLOW EASTERN PTNS L P | 6564 | 0 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | 5669 | 0 | 170 |
2015 | EVERFLOW EASTERN PTNS L P | 1067 | 0 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | 191 | 0 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | 5276 | 0 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | 5306 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2004 | EVERFLOW EASTERN PTNS L P | Brine | ||
2005 | EVERFLOW EASTERN PTNS L P | Brine | 60 | 365 |
2006 | EVERFLOW EASTERN PTNS L P | Brine | 10 | 365 |
2007 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2008 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | Brine | 21 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 181 |
2011 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 197 |
2012 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 156 |
2013 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 170 |
2015 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | Brine | 6 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0379463038 | 2005-01-19 | Preliminary Restoration | No Violations | The drilling pits are now closed. Partial compliance. |
0587904196 | 2004-12-06 | Drill / Deepen / Reopen | No Violations | Arrived on site for a B.O.P. Test. Pressured up to 400 psi. The pressure dropped to 200 psi in less than fifteen minutes. Pressured up again to 450 psi and shut the BOP in. The pressure dropped to 400 psi then held for fifteen minutes at 400 psi. |
0608820853 | 2004-12-07 | Drill / Deepen / Reopen | No Violations | Mrs. Chris Foley called the Uniontown Office complaining of light and noise from a drilling rig next to her property. The light and noise was keeping her daughter from sleeping at night. Arrived on site and found that the noise level in the house was minimal. The daughters bedroom faces the rig. It was explained to Mrs. Foley that the tower lights had to be on as a warning to aircraft. The noise from the rig would be going on for approximately seven to ten days. (Mrs. Foley thought it would be three months) Mrs. Foley plans to place a comforter on the window to help cut down on the noise and light. If this fails she will send her daughter to her grandparents for a few days. Mrs. Foleys house is approximately 350 from the drilling rig. Went to the rig to see if anything could be done to lessen the noise and light problems. All the engine exhausts were pointing up into the air. |
1102597295 | 2004-12-06 | Drill / Deepen / Reopen | No Violations | Arrived on site for the surface job and found, the rig has three more sticks to drill. Drilling pits lined. Returned later for the surface job. No problems encountered. |
1378848173 | 2007-04-11 | Preliminary Restoration | No Violations | GPSd the wellhead and tank battery. The drilling pits were filled in. Vegetation was growing on the location. No erosion was visible. White fence around wellhead. No drilling equipment on location. This well and tank battery has passed the preliminary restoration. |
1627951648 | 2013-01-16 | Production Wells | No Violations | On 1/16/2013, I performed a status check on the above well site. The tank battery is equipped with one 100 barrel tank and one horizontal separator. The well has 1.5 tubing and is a plunger lift. Identification signs are posted. No violation were noted. The tanks are located under the cell tower. GPS 41.06627/-80.75189 |
1727485342 | 2005-04-26 | Preliminary Restoration | No Violations | Partial compliance. The site has been graded but not seeded. |
For data sources see[9]