If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-127-27415 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.571578936,"lon":-82.1761006,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Perry | |
Municipality: Coal Township | |
Operator Name: KELLER BROTHERS & CO | |
Well Pad ID: | |
Farm/Lease Name: BUCKINGHAM (DALE DEW) | |
License Status: Final Restoration | |
License Date: 2018-08-23 | |
Spud Date: 2017-09-20 | |
Spud Drilling Contractor: | |
Final Drill Date: 2017-11-21 | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 39.571578936 | |
Longitude: -82.17610060 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-08-14 | Proposed Formations:BEREA, Issued Date:8/14/2017, Expired Date:8/14/2019 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-11-21 | STATUS BASED ON INSPECTOR REPORTS. WELL WAS DRILLED TO BEREA AND SHOT. GAS AND OIL SHOW AFTER SHOT BUT OPERATOR CHOSE TO P&A AS A DRY HOLE. PLUGGING COMMENCED ON 12/11/17 |
Plugged/Abandoned | 2018-04-11 | STATUS BASED ON INSPECTOR REPORTS. WELL WAS DRILLED TO BEREA AND SHOT. GAS AND OIL SHOW AFTER SHOT BUT OPERATOR CHOSE TO P&A AS A DRY HOLE. PLUGGING COMMENCED ON 12/11/17 |
Record Last Modified | 2018-08-31 | STATUS BASED ON INSPECTOR REPORTS. WELL WAS DRILLED TO BEREA AND SHOT. GAS AND OIL SHOW AFTER SHOT BUT OPERATOR CHOSE TO P&A AS A DRY HOLE. PLUGGING COMMENCED ON 12/11/17 |
Construction Permit Expires | 2019-08-14 | STATUS BASED ON INSPECTOR REPORTS. WELL WAS DRILLED TO BEREA AND SHOT. GAS AND OIL SHOW AFTER SHOT BUT OPERATOR CHOSE TO P&A AS A DRY HOLE. PLUGGING COMMENCED ON 12/11/17 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0004407071 | 2017-11-22 | Drill / Deepen / Reopen | No Violations | I returned to this well today to witness the open hole shots on the completion of this well. Mr. Keller has brought out another primer cord and is ready to shoot the well. Today they had a successful shot at 1181 feet. After the shot they had a show of oil and gas returns to the surface. |
0227969594 | 2018-02-06 | Plug / Plug Back | No Violations | I returned to this well to make sure the company did not finish plugging the well without contacting me. The well is still open and has not been plugged all the way. The cement is still down 200 feet at this time. |
0373353488 | 2017-10-10 | Casing String Witnessed | No Violations | I was on location this morning to check the 8 inch diameter casing before it was ran in the well. Keller Brothers tested all of the pipe at 140lbs of pressure. They did find one bad joint so it was left out. Each piece of casing was stamped and I received a paper with the passed pressure test. |
0383238947 | 2017-12-13 | Plug / Plug Back | No Violations | I stopped by the rig today to check on the rig crew. The rig crew was not on location at the time of my inspection. They still have to finish plugging this well. Wes Keller plans on tearing down the rig now before they finish plugging the well so they can get the truck closer to the well. |
0744010430 | 2017-11-21 | Drill / Deepen / Reopen | No Violations | When I arrived at the well today the drilling rig was still working on getting through the Berea Sand. They are showing the Berea sand from1134-1181 feet. After they got the hole cleaned out they dropped the explosives down the well so they could shoot the formation. They attempted to set the primer off twice but they had no luck today so they decided they would shut down and come back tomorrow after they got a new primer cord. |
0897865126 | 2018-04-11 | Plug / Plug Back | No Violations | I was back on location today to finish plugging this well. The well was filled with cement from 200 feet to the surface. The well is now plugged. |
1007733084 | 2017-11-08 | Drill / Deepen / Reopen | No Violations | I stopped by today to check on the drilling of this well. Today they have reached 890 feet in depth. Wes Keller said the drilling is going good at this point. |
1079029689 | 2017-09-28 | Drill / Deepen / Reopen | No Violations | I returned to this well today to check on the drilling and to discuss them cementing in the 8 inch diameter casing. Wes Keller said they would be drilling to 300 feet and would be using Formation Cementing to cement the casing back to the surface. They are at 150 feet today in depth. |
1212511318 | 2017-12-11 | Plug / Plug Back | No Violations | I am on location today to witness the plugging of this well. The Keller Brothers have decided to go ahead and plug this well. The well was a dry hole so it will be plugged under the drilling permit. The well will be plugged with 9 sack grout from Hocking Valley Concrete. The well will be filled from the bottom of the well to the surface with the concrete. During the plugging operations today the hole did not fill up to the surface. The rig crew is planning on pulling the 7 inch casing from the well then tearing down the rig before filling the hole the rest of the way up. Wes Keller said he would contact me when they are ready to do it. |
1507640693 | 2017-10-10 | Drill / Deepen / Reopen | No Violations | I was on location today to witness the 8-5/8 diameter surface casing get cemented to the surface. Formation Cementing was on location for the cement job. A total of 75 sacks of Class a cement was used to complete the job with 8bbl of returns. |
1509461322 | 2017-10-31 | Drill / Deepen / Reopen | No Violations | I stopped by the drilling rig today to check on the process. The rig crew ran the 7 inch diameter casing into the well yesterday. They contacted me to let me know they would be running it but I was on a plug job. They ran 703 feet of 7 inch casing down to the 7 inch seat. Today they are rigging up their tools to continue the drilling process. |
1536851343 | 2017-10-25 | Drill / Deepen / Reopen | No Violations | I stopped by today to check on the drilling of this well. They are currently just past 600 feet in depth. |
1866732367 | 2017-10-04 | Drill / Deepen / Reopen | No Violations | I have returned to this location today to check on the drilling. The rig crew is at 270 feet in depth today. They plan on getting the 8 inch casing tomorrow. I explained to Mr. Keller since it was used casing it would have to be tested. He agreed to that and he will be testing the casing himself. |
1874409606 | 2018-08-23 | Final Restoration | No Violations | The final restoration on this well meets 1509.072(B) requirements. |
1913078294 | 2018-04-11 | Plug / Plug Back | No Violations | I was back on location today to finish plugging out this well. Keller Brothers had Hocking Valley Concrete come out and top the 200 foot off to the surface with 9 sack grout. The well is now plugged. |
1952665306 | 2017-12-20 | Plug / Plug Back | No Violations | I checked this location today to see if the rig crew has started tearing down their rig yet. They have 1/2 of the equipment removed from the location. While I was there Wes Keller showed up to remove some more equipment. He stated that they are planning on finishing out the plug job next week. He will give me a call to let me know when. |
1973959064 | 2017-09-25 | Drill / Deepen / Reopen | No Violations | I stopped by this location today to check on the drilling rig. At this time the rig is drilling out the hole. They are currently at 70 feet. |
2134924465 | 2017-10-20 | Drill / Deepen / Reopen | No Violations | I was on location to see how the drilling was going. The rig crew has made it down to 520 feet at this point. Wes Keller said the drilling has been going good at this point. I will return next week to check on the drilling. |
For data sources see[3]