If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-053-21005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":38.753084917,"lon":-82.26454936,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Gallia | |
Municipality: Harrison Township | |
Operator Name: CONTINENTAL RESOURCES INC | |
Well Pad ID: | |
Farm/Lease Name: CORBIN BRIAN K & AMY L | |
License Status: Final Restoration | |
License Date: 2009-05-26 | |
Spud Date: 2008-09-07 | |
Spud Drilling Contractor: S W JACK DRLG | |
Final Drill Date: 2008-09-29 | |
Well Total Depth: 4855 ft | |
Configuration: Horizontal | |
Latitude: 38.753084917 | |
Longitude: -82.26454936 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-09-12 | Proposed Formations:LOWER HURON/OHIO SHALE, Issued Date:9/12/2008, Expired Date:9/12/2009 6:00:00 AM, Drilling unit acres:38.17, Proposed Well Type:OG, Proposed Well Class:EW |
Reached Total Depth | 2008-09-29
- | |
Completion Report Received | 2009-03-02
- | |
Construction Permit Expires | 2009-09-12
- | |
Plugged/Abandoned | 2010-02-03
- | |
Record Last Modified | 2015-09-24
- |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 0 | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | CONTINENTAL RESOURCES INC | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | CONTINENTAL RESOURCES INC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0035992057 | 2010-02-03 | Final Restoration | No Violations | Site is graded. Have established good vegetative cover on location. Landowner will use site for agriculture. Gravel pile has been left at request of landowner. |
0201352466 | 2009-07-15 | Plug / Plug Back | No Violations | Tag TOC 1st plug at 3370. Pump another plug from 3370 to 3142. |
0294374637 | 2009-01-08 | Drill / Deepen / Reopen | No Violations | 7 Cement bond Log. Francis Brothers Service Rig, Mountain State Wire Line, BJ Pump Truck. Rose Excavating. Shannon Stevens (Company Representative). A retrievable bridge plug was set at 2150. They dumped 40 gallons of sand on top of the bridge plug. Approximately 5 of fill on top of plug. They loaded the hole with 83.5 Barrels water. Tested the well and plug to 700psi. They ran first log with out pressure. Ran second log under 1000psi to 2133.9 they maintained between 900psi and 1000psi with an average psi of 960. I sent copies of the logs to ODNR Columbus office for evaluation. |
0567979377 | 2008-11-17 | Preliminary Restoration | No Violations | Pit was solidified today with 280 sacs of cement brought to location by BJ in a tear drop truck. Dry cement was blown into pit and stirred up with a trac hoe bucket. (Rose Excavation) Jimmy Ray was also on site for the solidification. After pit set up they started backfilling the pit. |
0721088339 | 2008-11-12 | Drill / Deepen / Reopen | No Violations | Service rig on location. Pit has been pumped down. Some fluid in bottom of pit. Liner is in good shape. Pit is to be solidified before closing. The wellhead has been grouted between the 9 5/8 and the 7. The grout job was done on the 10th. I have requested a report and cement tickets for this well to determine where the gas is coming from on the backside of the 7. The gas and brine leak has been stopped at the surface by the grout job. The subsurface gas leak has not been resolved. My gas detector showed no sign of gas at the wellhead. |
0917156640 | 2009-05-13 | Production Wells | No Violations | No identification. Audible gas leak at wellhead between the 7 collar and the 7 by 2 swedge. Gas meter shows no explosive levels of gas. Well is equipped with a 7 by 2 swedge a 2 valve, 2 bull plug with a 1/4 needle valve. There is no fluid around the wellhead. Restoration has not been attempted, site is rutted no seed or mulch has been applied to location. Top soil is in a pile. Pit has been solidified and closed. Took pictures. |
1096748001 | 2008-10-30 | Drill / Deepen / Reopen | No Violations | This site is located in a flood zone. Earthen pits were allowed only during the dry season. The main condition to allow earthen pits was that as soon as drill rig moves off location the pits are to be solidified. Pit is still open. Fluid has been pumped down and 1.5 of the pit divider is visible. Liner is in place and does not appear to be compromised. Wellhead is leaking brine and gas between the 9 5/8 and the 7 casings. The brine is being contained in the cellar at the wellhead. Gas level was 14 LEL on the PhD Lite gas meter. I contacted Shannon Stevens and we went and looked at the leak. We called a water truck to remove the brine from around the wellhead. We were then able to see the leak on the backside of the 7 casing. Merl Richards and Ed Kohler were notified of the leak. |
1203911206 | 2009-07-17 | Plug / Plug Back | No Violations | Tag TOC plug at 1633 Pump another plug from 1628 to 1496. |
1233164918 | 2008-12-19 | Completion Testing | No Violations | Small bubbles 1/8 inch were observed at the wellhead. Still waiting on the cement bond log to see if leak has been addressed by the grout job. |
1417704177 | 2014-12-04 | Preliminary Restoration | No Violations | Preliminary Restoration requirements met. |
1481124160 | 2009-07-15 | Plug / Plug Back | No Violations | Took 145bbls to break circulation at the surface. Pumped a total of 160bbls. 1st plug from 3429 to 3147. |
1535309285 | 2008-09-18 | Drill / Deepen / Reopen | No Violations | Drilling now. Will cement 7 tomorrow. Drill pit looks in good shape. |
1785326454 | 2009-01-12 | Drill / Deepen / Reopen | No Violations | Retrievable bridge plug set at 2150 with sand on top of it. Running tubing down today to the top of the sand and will circulate the sand out of the hole then retrieve the bridge plug. |
For data sources see[8]