If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-21875 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.465002315,"lon":-81.33539334,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Russell Township | |
Operator Name: DAVID R HILL INC | |
Well Pad ID: | |
Farm/Lease Name: PACIOREK A | |
License Status: Producing | |
License Date: 2007-07-29 | |
Spud Date: 2006-09-24 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2006-10-07 | |
Well Total Depth: 3875 ft | |
Configuration: Vertical | |
Latitude: 41.465002315 | |
Longitude: -81.33539334 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-01-09 | Proposed Formations:LOWER HURON SHALE-CLINTON, Issued Date:1/9/2006, Expired Date:1/9/2007 6:00:00 AM, Drilling unit acres:20.2306, Proposed Well Type:OG, Proposed Well Class:EW |
Completed | 2006-10-07 | RBDMS Rec |
Reached Total Depth | 2006-10-07 | RBDMS Rec |
Construction Permit Expires | 2007-01-09 | RBDMS Rec |
Change of Owner | 2007-03-27 | Operator changed from 432, BAKERWELL INC to 490, HILL DAVID R INC |
Completion Report Received | 2007-04-23 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-07-29 | 3776 | 3817 | 55 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 76400 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | DAVID R HILL INC | 1296 | 0 | 168 |
2008 | DAVID R HILL INC | 3215 | 163 | 365 |
2009 | DAVID R HILL INC | 1636 | 87 | 365 |
2010 | DAVID R HILL INC | 2486 | 0 | 365 |
2011 | DAVID R HILL INC | 2529 | 65 | 365 |
2012 | DAVID R HILL INC | 2469 | 47 | 366 |
2013 | DAVID R HILL INC | 2117 | 0 | 365 |
2014 | DAVID R HILL INC | 2089 | 33 | 365 |
2015 | DAVID R HILL INC | 2046 | 21 | 365 |
2016 | DAVID R HILL INC | 1048 | 16 | 365 |
2017 | DAVID R HILL INC | 1774 | 0 | 365 |
2018 | DAVID R HILL INC | 1471 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | DAVID R HILL INC | Brine | 176 | 168 |
2008 | DAVID R HILL INC | Brine | 412 | 365 |
2009 | DAVID R HILL INC | Brine | 140 | 365 |
2010 | DAVID R HILL INC | Brine | 45 | 365 |
2011 | DAVID R HILL INC | Brine | 108 | 365 |
2012 | DAVID R HILL INC | Brine | 35 | 366 |
2013 | DAVID R HILL INC | Brine | 129 | 365 |
2014 | DAVID R HILL INC | Brine | 77 | 365 |
2015 | DAVID R HILL INC | Brine | 100 | 365 |
2016 | DAVID R HILL INC | Brine | 0 | 365 |
2017 | DAVID R HILL INC | Brine | 0 | 365 |
2018 | DAVID R HILL INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0100829015 | 2006-09-22 | Drill / Deepen / Reopen | No Violations | Status check, lease road was constructed. Silt fence need at the north west corner of the site. Operator asked for above ground pit for cement, this was approved. Liner needs to be put down before pits are brought in. |
0554775833 | 2006-11-15 | Plug / Plug Back | No Violations | Complaint of mud on the road. Went to site, operator was actively cleaning roads at the time of inspection. Operator was scrapping the road with a plow and picking up large clumps of dirt. Suggested to operator that they bring in a fresh load of stone for the apron to help clean mud off trucks. |
0775549865 | 2011-11-04 | UrbanProduction Wells | No Violations | Pump jack was operating this day. Tank battery was in good repair. |
1106182454 | 2006-10-04 | Drill / Deepen / Reopen | No Violations | Pit water level okay. Pit is to be filled in before equipment leaves the site. TD should be reached today. |
1123329685 | 2007-07-09 | Preliminary Restoration | No Violations | On site regarding a complaint received by Wayne Schalk DMRM supervisor. Complaint was that there is a gas leak at the well. Inspection findings, there is a small leak on the well head. I was able to hear the leak and feel it around the first hammer union below the rods. I called Dave Hill and left a message on his voice mail that there is a leak at the well and the fitting needs tightened. Site has been seeded and mulched. Vegetation is beginning to become established. Once vegetation is more advanced silt fence can be removed. Tank battery is in good repair. Two 110 BBL tanks and mechanical separator on site. Charcoal filter and lighting arrestors are in place. Lease road is stable and in good repair. |
1159459923 | 2006-09-28 | Drill / Deepen / Reopen | No Violations | Drilling was active. Operator had constructed a ground pit for cement overflow. Pit water level was at ground level. I instructed drill operator to lower the water level in the pit. Operator is having tanks brought onto site. Ground pit will be pumped dry. No identification sign was posted at site. Permit was on site. |
1163614347 | 2006-11-15 | Drill / Deepen / Reopen | No Violations | Operator is currently fracturing well. Trucks entering and exiting the site have been dragging mud onto the road. A complaint was received by phone. Called operator regarding complaint. Equipment was on site cleaning roads at the time of inspection. Operator will be bring a load of stone, for the lease road. |
1179939087 | 2007-05-23 | Preliminary Restoration | No Violations | Tank battery is installed. Two 110BBL tanks on site, charcoal filter in place, lightning arrestors in place. Well head is completed and pump jack installed. Frack tanks and water tanks on site. Lease road not restored. Well head area is not restored, no grading and seeded has taken place. . Silt fence is up. |
1389313390 | 2017-02-28 | UrbanProduction Wells | No Violations | During this inspection, the well was equipped with an electric motor on the pumpjack and the valves on the wellhead were open. The electric has been shut off and disconnected from the pumpjack motor. There was a domestic line off of the 4.5 inch casing with a meter, drip bottle and two regulators with open valves. The stuffing box was covered in old oil and needs to be addressed and cleaned up. The last reported production for this well was in 2015. The tank battery consisted of one 100 BBL production tank, one 100 BBL brine tank, and a mechanical separator. Valves on the separator were open and the sales line within the tank battery had a chart that showed production. Tank valves were equipped with flat plugs. The vent stack on the production tank was plumbed into a 55 gallon charcoal filter then plumbed up and topped with a spark arrestor. The correct lids and hatches were installed on the tanks. The tank battery was diked and fenced with a locked man door. Proper, legible signage was located at the tank battery and the lease access was stable. I contacted John Suhar from David R. Hill about cleaning up the stuffing box. |
1462896287 | 2016-05-10 | Production Wells | No Violations | My inspection found no changes since my last inspection. |
1738150329 | 2006-09-26 | Drill / Deepen / Reopen | No Violations | Status check inspection to check on the steel drilling pits. The mud tanks, shale shaker, and cuttings tank were leased from Union Drilling. I spoke with Kilbargers tool pusher and asked him to place a liner under the cuttings tank. |
1893017353 | 2013-07-15 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a pump jack. The annulus valves is open. The well and tank battery are in good repair and are surrounded by a locked chain link fence. The tank battery consists of a 100 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The production tank is vented through a 55 gallon charcoal filter and up into a spark arrestor. The proper identification is located on the tank battery. The lease road is in stable condition. |
2033380007 | 2007-06-11 | Preliminary Restoration | No Violations | Site has been ruff graded, silt fence is up. Tank battery is installed, and is in the process of being painted. Final grading and seeding has not been completed. |
For data sources see[9]