If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-22991 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.103922813,"lon":-82.04098304,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Chatham Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: FRANCIS GRIM # 3-H | |
License Status: Producing | |
License Date: 1982-02-16 | |
Spud Date: 1982-07-07 | |
Spud Drilling Contractor: ANDY COLUMBUS DRLG | |
Final Drill Date: 1982-08-13 | |
Well Total Depth: 470 ft | |
Configuration: Vertical | |
Latitude: 41.103922813 | |
Longitude: -82.04098304 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-02-12 | Issued Date 2/16/82 Expired Date 8/15/82 Acres 0020000 Tool Type CT Proposed Formation BEREA Proposed Depth 00470 Proposed Drill Depth 00470 |
Original Spud | 1982-07-07 | RBDMS Rec |
Completed | 1982-08-13 | RBDMS Rec |
Reached Total Depth | 1982-08-13 | RBDMS Rec |
Construction Permit Expires | 1982-08-15 | RBDMS Rec |
CO | 1982-10-01 | 337 HARLEY DRILLING & PRODUCI GeoDate 2/12/82 |
Completion Report Received | 1983-05-18 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | SHOT;NITRO |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | HARLEY DRILLING & PRODUCING LT | 0 | 185 | 366 |
2013 | HARLEY DRILLING & PRODUCING LT | 0 | 342 | 365 |
2014 | HARLEY DRILLING & PRODUCING LT | 0 | 171 | 365 |
2015 | HARLEY DRILLING & PRODUCING LT | 0 | 0 | 365 |
2016 | HARLEY DRILLING & PRODUCING LT | 0 | 10 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | 0 | 118 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | 0 | 90 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | HARLEY DRILLING & PRODUCING LT | Brine | 5734 | 366 |
2013 | HARLEY DRILLING & PRODUCING LT | Brine | 7302 | 365 |
2014 | HARLEY DRILLING & PRODUCING LT | Brine | 4710 | 365 |
2015 | HARLEY DRILLING & PRODUCING LT | Brine | 91 | 365 |
2016 | HARLEY DRILLING & PRODUCING LT | Brine | 83 | 365 |
2017 | HARLEY DRILLING & PRODUCING LT | Brine | 1210 | 365 |
2018 | HARLEY DRILLING & PRODUCING LT | Brine | 1080 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
000PL11985 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point |
For data sources see[8]