If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-22020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.51682558,"lon":-81.4506997,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Cuyahoga | |
Municipality: Mayfield Township | |
Operator Name: BASS ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: GOLDEN GATE SHOPPING CENTER LTD | |
License Status: Producing | |
License Date: 2008-01-14 | |
Spud Date: 2008-02-19 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2008-02-28 | |
Well Total Depth: 3633 ft | |
Configuration: Vertical | |
Latitude: 41.516825580 | |
Longitude: -81.45069970 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-01-14 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:1/14/2008, Expired Date:1/13/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-02-28 | |
Completion Report Received | 2008-07-18 | |
Construction Permit Expires | 2009-01-13 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-10-01 | 3428 | 3481 | 62 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 72891 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | BASS ENERGY CO INC | 41395 | 149 | 211 |
2009 | BASS ENERGY CO INC | 99609 | 64 | 365 |
2010 | BASS ENERGY CO INC | 61290 | 74 | 365 |
2011 | BASS ENERGY CO INC | 47245 | 35 | 0 |
2012 | BASS ENERGY CO INC | 41985 | 51 | 366 |
2013 | BASS ENERGY CO INC | 34061 | 0 | 365 |
2014 | BASS ENERGY CO INC | 30583 | 0 | 365 |
2015 | BASS ENERGY CO INC | 27448 | 53 | 365 |
2016 | BASS ENERGY CO INC | 25437 | 0 | 365 |
2017 | BASS ENERGY CO INC | 22799 | 0 | 365 |
2018 | BASS ENERGY CO INC | 22089 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | BASS ENERGY CO INC | Brine | 112 | 211 |
2009 | BASS ENERGY CO INC | Brine | 135 | 365 |
2010 | BASS ENERGY CO INC | Brine | 30 | 365 |
2011 | BASS ENERGY CO INC | Brine | 76 | |
2012 | BASS ENERGY CO INC | Brine | 22 | 366 |
2013 | BASS ENERGY CO INC | Brine | 0 | 365 |
2014 | BASS ENERGY CO INC | Brine | 0 | 365 |
2015 | BASS ENERGY CO INC | Brine | 55 | 365 |
2016 | BASS ENERGY CO INC | Brine | 0 | 365 |
2017 | BASS ENERGY CO INC | Brine | 0 | 365 |
2018 | BASS ENERGY CO INC | Brine | 35 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0062757457 | 2017-08-16 | UrbanProduction Wells | No Violations | I inspected this well location as part of routine inspection activity. At the time of this inspection, I observed the following: a wellhead with plunger lift system and associated tank battery in separate board-on-board enclosures located in a multi-tenant shopping center. The enclosure gates were locked. The load line valves were secure. The secondary containment was intact. Fittings and connections at the wellhead and battery were secure. The surrounding areas are comprised of asphalt parking and drive areas. I did not observe any signs of problems. |
0103531261 | 2009-01-06 | Preliminary Restoration | No Violations | well in parking lot no grass to be established. Dike around battery is poured cement and fencing on top of wall. |
0314441964 | 2008-02-21 | Drill / Deepen / Reopen | No Violations | cementing 11.75 casing good returns to surface. |
0529061894 | 2011-02-15 | UrbanProduction Wells | No Violations | No violation |
0773875198 | 2008-03-19 | Drill / Deepen / Reopen | No Violations | site check no violation |
0818447166 | 2008-04-01 | Drill / Deepen / Reopen | No Violations | pits closed |
0863963749 | 2008-03-10 | Drill / Deepen / Reopen | No Violations | running bond log was post pond |
1212094705 | 2008-02-27 | Drill / Deepen / Reopen | No Violations | pits closed |
1340827679 | 2015-02-20 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. The well and battery are located within the Golden Gate Shopping center. The wellhead mechanical plunger lift and battery are in separate board-on-board enclosures which are locked. Load-outs are plugged and locked. Secondary containment is constructed with masonry block and is robust. Fittings and connections are secure and free from signs of leakage or problems. Signage is present and accurate. Access to the wellhead and battery are from the general-use paved parking areas. Production reports are current. |
1358977077 | 2012-01-16 | UrbanProduction Wells | No Violations | I observed the unit to consist of the following elements: a two-tank battery wth mechanical separator and metering run enclosed within a integral concrete secondary containment dike and 8-foot board-on-board fence, and a wellhead unit which is similarly enclosed in a board-on-board fence. The gate and load lines were locked. The interior spacing of tank battery elements is in accordance with 1509 rules. I did not observe nor detect evidence of any leakage and/or spills of petroleum gases or liquids. There is a mechanical plunger lift apparatus affixed to the production wellhead. The valves and seals appear to be in good condition and are free from leaks. The unit is propertly identified at both the tank battery and wellhead. |
1533843758 | 2018-08-09 | UrbanProduction Wells | No Violations | I inspected this well location as part of routine inspection activity. At the time of my inspection I noted the following: the connections and fittings were secure and free from signs of problems or leakage. The areas surrounding the well consist of asphalt-paved parking and driveway. There were no signs of problems. The well was in active production. |
1623576197 | 2008-02-22 | Drill / Deepen / Reopen | No Violations | cementing 85/8 casing good returns to surface |
1669322018 | 2011-04-04 | Production Wells | No Violations | Man door on the fence to the well, hasp lock is off center. While locking, lock a section of the board on board came off. Advised company of the board. Advised company hasp needs repaired. Man door needs to work and lock properly. |
1789718511 | 2008-03-18 | Drill / Deepen / Reopen | No Violations | Pits closed |
2083919776 | 2008-02-25 | Drill / Deepen / Reopen | No Violations | drilling at 1800 no gas. |
2132843743 | 2011-02-15 | Production Wells | No Violations | No violation |
For data sources see[9]