If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-22033 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.453227323,"lon":-81.48738469,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Cuyahoga | |
Municipality: Orange Township | |
Operator Name: GONZOIL INC | |
Well Pad ID: | |
Farm/Lease Name: KOWALSKI | |
License Status: Final Restoration | |
License Date: 2016-08-12 | |
Spud Date: 2008-06-25 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2008-07-04 | |
Well Total Depth: 3829 ft | |
Configuration: Vertical | |
Latitude: 41.453227323 | |
Longitude: -81.48738469 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-04-16 | Proposed Formations:CLINTON, Issued Date:4/16/2008, Expired Date:4/16/2009 6:00:00 AM, Drilling unit acres:21.6, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-07-04 | |
Completion Report Received | 2009-02-09 | |
Change of Owner | 2016-01-29 | Operator changed from 1304, SEAGULL DEVELOPMENT CORP to 8560, BAAY OIL LLC |
Change of Owner | 2016-08-11 | Operator changed from 8560, BAAY OIL LLC to 3434, GONZOIL INC |
APP | 2016-08-12 | Proposed Formations:CLINTON, Issued Date:8/12/2016, Expired Date:8/12/2018 12:00:00 PM, Drilling unit acres:2106, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2016-09-28 | |
Construction Permit Expires | 2017-08-12 | |
Record Last Modified | 2017-12-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-03-24 | 3641 | 3673 | 24 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 62021 Gal | 25000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | SEAGULL DEVELOPMENT CORP | 519 | 256 | 84 |
2009 | SEAGULL DEVELOPMENT CORP | 729 | 0 | 84 |
2010 | SEAGULL DEVELOPMENT CORP | 17149 | 352 | 365 |
2011 | SEAGULL DEVELOPMENT CORP | 15642 | 120 | 365 |
2012 | SEAGULL DEVELOPMENT CORP | 14551 | 123 | 366 |
2013 | SEAGULL DEVELOPMENT CORP | 13434 | 92 | 365 |
2014 | SEAGULL DEVELOPMENT CORP | 11524 | 146 | 365 |
2015 | SEAGULL DEVELOPMENT CORP | 11916 | 46 | 365 |
2016 | BAAY OIL LLC | 6528 | 49 | 89 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | SEAGULL DEVELOPMENT CORP | Brine | 1935 | 84 |
2009 | SEAGULL DEVELOPMENT CORP | Brine | 18304 | 84 |
2010 | SEAGULL DEVELOPMENT CORP | Brine | 228 | 365 |
2011 | SEAGULL DEVELOPMENT CORP | Brine | 271 | 365 |
2012 | SEAGULL DEVELOPMENT CORP | Brine | 330 | 366 |
2013 | SEAGULL DEVELOPMENT CORP | Brine | 145 | 365 |
2014 | SEAGULL DEVELOPMENT CORP | Brine | 161 | 365 |
2015 | SEAGULL DEVELOPMENT CORP | Brine | 93 | 365 |
2016 | BAAY OIL LLC | Brine | 216 | 89 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0084982414 | 2009-01-23 | Drill / Deepen / Reopen | No Violations | area graded |
0149477066 | 2008-06-11 | Drill / Deepen / Reopen | No Violations | on site meeting with city and company to discuss drilling tight location. |
0395855470 | 2013-02-19 | Preliminary Restoration | No Violations | The wellhead consists of a mechanical lift unit, in a 6 wooden enclosure. The associated tank battery consists of 1 100-barrel (BBL) tank, 1 50 BBL tanks, and a mechanical separator, in a separate, locked enclosure. The spacing is in accordance with the rule. The tank battery dike is adequate. There is a lot of assorted debris being stored inside the tank battery enclsore and the wellhead enclosure. I spoke with the land owner as well as John Vizner about the need to remove the debris. John indicated that he would talk to the land owner about getting it removed. |
0411564996 | 2008-07-07 | Drill / Deepen / Reopen | No Violations | rig moving to solon |
0444466143 | 2015-04-15 | UrbanProduction Wells | No Violations | I inspected this producing unit as part of routine inspection activity. The well and battery are located behind the house at the referenced address and accessed via the shared driveway. The well is comprised of a mechanical plunger-lift system in a small board-on-board enclosure which is locked. Fittings and connections at the wellhead are secure and free from signs of leakage or problems. The battery is comprised of 1 100-barrel steel production tank, 1 50-barrel brine tank, and separator unit in a separate board-on-board enclosure which is locked. Load-outs are plugged and locked. The interior of the secondary containment is dry. Areas around the wellhead and battery are grassy and wooded with no evidence of impact relating to the on-going production activity. I did not observe any signs of problems or erosional deficits. |
0572385559 | 2009-01-07 | Preliminary Restoration | No Violations | |
0584081700 | 2009-10-28 | Production Wells | No Violations | area seeded grass established |
1218717016 | 2008-06-30 | Drill / Deepen / Reopen | No Violations | drilling 2080 no violation |
1256755021 | 2016-09-26 | Plug / Plug Back | No Violations | I inspected this well location as part of plugging and abandonment activities conducted by Bishop Well Service (Bishop) for Gonzoil, Inc. At the time of this inspection, crews from Bishop had set-up at the wellhead and were loading the hole. The area surrounding the well was comprised of recently-graded fill material which was part of on-going site re-development work. Elements of the former tank battery had been removed from the site previous to this inspection. Access to the well location was provided by a shared-use, grave-paved, temporary construction roadway that traverses the development location. I met with Doug Gonzalez from Gonzoil and we discussed the planned activities and proposed plugging plan. Placement of plugs will commence in the morning (09/27). |
1311872685 | 2016-09-28 | Plug / Plug Back | No Violations | I was at this well location to witness the completion of plugging and abandonment activity which had been commenced on 09/27/2016. At the time of this inspection, the bottom formation (Clinton Sand), Big Lime, and bottom surface plugs had been set and the existing wellbore was assessed and found to be stable and free from signs of leakage. The top surface plug was placed with top-loaded, 9-sack grout. The well was stable with no signs of gas production from the open casing. |
1475073644 | 2016-09-27 | Plug / Plug Back | No Violations | I was on location to inspect during on-going plugging and abandonment being conducted by Bishop Well Service under contract to Gonzoil Inc. At the time of this inspection, Bishop crews had blown off well pressure to static condition, loaded the bore hole, and began setting formation plugs in accordance with OAC 1501:9-11. Details and specifics can be found in the associated plugging and abandonment report. |
1694674516 | 2008-06-24 | Drill / Deepen / Reopen | No Violations | pits fenced in |
1874739575 | 2017-10-20 | Final Restoration | No Violations | I inspected this well location as an evaluation for Final Restoration. Plugging and abandonment was completed on 9/28/2016, witnessed by a ODNR Division of Oil and Gas Inspector, and a plugging and abandonment report was filed. At the time of this inspection, the former location of the well had been regraded, and was undergoing redevelopment. The former production elements, including the flow-line, were removed and there was no remaining system elements. No further action is needed. Final Restoration is passed. |
For data sources see[9]