If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24523 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.773885056,"lon":-81.2977191,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Franklin Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001132 | |
Farm/Lease Name: BENATAR UNIT | |
License Status: Producing | |
License Date: 2015-02-06 | |
Spud Date: 2015-02-14 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-06-07 | |
Well Total Depth: 15276 ft | |
Configuration: Horizontal | |
Latitude: 39.773885056 | |
Longitude: -81.29771910 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-09-25 | Proposed Formations:POINT PLEASANT, Issued Date:9/25/2014, Expired Date:9/24/2016 12:00:00 PM, Drilling unit acres:203.771, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2015-02-06 | Proposed Formations:POINT PLEASANT, Issued Date:2/6/2015, Expired Date:2/5/2017 12:00:00 PM, Drilling unit acres:293.016, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2015-06-07 | |
Correction to Well | 2015-07-31 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-03-23 | |
Construction Permit Expires | 2017-02-05 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-03-24 | 8409 | 15166 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/14/2015 | 12/22/2015 | 8249 | 10,081,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00219 | 2045 |
SI-1100 | U.S. Well Services | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 25 | 0.00363 | 3383.29 | |
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00033 | 311.382 | ||||
Water | 7732-18-5 | 80 | 0.01027 | 9580.99 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.00083 | 778.456 | ||||
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.00083 | 778.456 | ||||
Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00152 | 1413.2 | ||||
Potassium salt of diethylene triamine penta (methylene phosphonic acid) | 15827-60-8 | 7.5 | 0.0013 | 1212.59 | ||||
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00437 | 4080.09 | |
Deionized Water | 7732-18-5 | 28 | 0.0025 | 2330.53 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 9.35624 | 8,726,100.0 | |
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.15794 | 147306 | |
Hydrogen Chloride | 7647-01-0 | 18 | 0.03773 | 35186.6 | ||||
WFRA-405 | U.S. Well Services | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.01797 | 16757.4 | |
Water | 7732-18-5 | 60 | 0.04464 | 41633.3 | ||||
Ethoxylated alcohol blend | 68002-97-1 | 4 | 0.00298 | 2775.55 | ||||
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.02232 | 20816.6 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 90.1485 | 84,077,000.0 | |
LGC-15 | U.S. Well Services | Gelling Agents | Petroleum Distillates | 64742-47-8 | 60 | 0.0803 | 74888.6 | |
Guar Gum | 9000-30-0 | 50 | 0.08479 | 79075 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.01297 | 12093.8 | ||||
Surfactant | 68439-51-0 | 3 | 0.00509 | 4744.5 | ||||
AI-302 | U.S. Well Services | Acid Corrosion Inhibitors | Water | 7732-18-5 | 95 | 0.00068 | 633.84 | |
2-Propyn-1-olcompound with methyloxirane | 38172-91-7 | 15 | 0.00011 | 100.08 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-12-14 | H2O | 15 | 6078 Bbl | 236260 | US Well Services Inc | STAGE 1/39
60 SHOTS STAGES 2-38 SEE IMAGES |
2015-12-22 | H2O | 15 | 5619 Bbl | 233280 | Universal Well Services Inc. | STAGE 39/39
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | 2130983 | 704 | 347 |
2017 | ANTERO RESOURCES CORPORATION | 805277 | 157 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 498587 | 176 | 362 |
2019 | ANTERO RESOURCES CORPORATION | 90661 | 69 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | Brine | 34027 | 347 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 5141 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 2987 | 362 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 509 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0034634408 | 2015-02-14 | Drill / Deepen / Reopen | No Violations | Notification was received by the company man on site Brandon Jeffcoat that Express Energys top hole rig has spudded the said well and is drilling the conductor borehole. They will notify me of the upcoming cement job once total depth has been reached and they are running casing. |
0182334573 | 2018-03-02 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072. The well pad entry point is gated and locked with signage posted. The lease road is graveled along with the well pad, both are in good repair. Addressing the well head - The well is equipped with a B section along with a 9.65 and 5.5 casing well head section and a tubing well head. The tubing well head has 2 manually controlled valves and one emergency shut down valve. Annular pressure monitoring is in place with 100 (psi) pound per square inch indicated between the 9.65 and 13.375 and 900 psi between the 5.5 and 9.625. Proper well identification is posted at the well head. Also on location is (5) gas processing units one for each well head on location. At the left front corner of the well pad is the production fluid storage area consisting of a total of 8 steel construction tanks all situated inside a polymer lined steel containment dike area. Emergency shut down devices are situated at the well pad entrance and at the tank battery loading site. |
0310321978 | 2016-02-17 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. Addressing the well status, The well drilling and completion process is now complete and all (5) of the wells on the pad are capable of production and are currently in the flow back testing stages with a company on location identified as Solid Oak flow back services monitoring the well testing. There is 3 vertical sand trap separators and 5 gas processing units on location with the sand trap separators being evacuated into a 500 barrel tank. Addressing the production fluid storage area- A total of (8) 400 barrel capacity tanks are present inside a polymer lined steel containment dike area. |
0317225092 | 2015-04-14 | Casing String Witnessed | No Violations | 04/14/2015- Patterson Drilling rig 332 is now on the hole and has drilled a 24 x 396 surface casing borehole and ran 400 of 87.5# J-55 surface casing with a Texas Style guide shoe and float collar ran. CalFrac cement service is on location to cement the casing using 705 sacks of class A-3% calcium .125 pps LCM cement with 70% open hole cement excess ran and the casing pressure tested to 500 psi upon the landing of the cement plug with good cement returns witnessed to surface 56 bbl into displacement. |
0516902196 | 2015-06-08 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling progress found Patterson Drilling rig 332 on location drilling the 8.750 production borehole at a current depth of 14,770 using managed pressure drilling holding 417 psi annular pressure with 4,119 psi stand pipe pressure and a current drilling mud weight of 15.1# and viscosity of 77. The proposed well bore depth is 16,500. |
0672450051 | 2015-04-21 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling process found Patterson Drilling rig 332 on location drilling the 12.2502nd intermediate wellbore at a depth of 5,109. The company is implementing a 15 degree borehole nudge in the direction of 72 degrees azimuth. |
0914490741 | 2015-02-20 | Casing String Witnessed | No Violations | I am onsite to witness the conductor casing string installation and cementing operations. Express Energy Services drilled 100 of 32 borehole and ran 100 of 26 casing. My test of the cement mix water with a Quantab indicated chloride levels of 193 parts per million. Due to failing to circulate cement to surface on the other wells on the pad 200% excess cement was pumped. I witnessed 30 barrels of cement return to surface and circulation was maintained through out the job. Three feet of cement was left in cellar to provide a liquid tight seal. |
1255531894 | 2019-02-07 | Production Wells | No Violations | On this day, I found the pad gated with signage at the entrance. There are (5) producing wells, (5) gas processing units, (8) 400-barrel steel production tanks within polymer-lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 1,100 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi. |
1433183231 | 2015-06-01 | Drill / Deepen / Reopen | No Violations | Status check inspection on the well drilling status found Patterson Drilling rig 343 on location drilling the 8.750 production borehole at a current depth of 8,715 in the directional azimuth of 327.78 degrees with a inclination of 89.78 and 6.69 degree offset. |
1707111132 | 2015-04-29 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling process found Patterson Drilling rig 332 on location and the issue resolved with the 12.250 drill bit and bottom hole assembly being stuck in the hole at a depth of 6,224. The rig is running in the hole at 3,885 with the drill string to resume drilling operations on the 12.250 2nd intermediate wellbore. |
1768110077 | 2015-06-05 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling progress and reported gas influx issue. Patterson Drilling rig # 343 is on location and has drilled the 8.750 production bore to a measured depth of 14,320 and has pulled the drill string off bottom to 14,296 with a borehole directional azimuth of 328.93 degrees and inclination of 90.71 degrees, the company is currently using 14.5 mud weight and circulating gas out of the borehole with a recorded measurement of 8,921 units of 3rd party gas and no recorded fluid loss only gas borehole influx. |
1913170941 | 2015-02-17 | Drill / Deepen / Reopen | No Violations | My inspection today finds the Express Energy Services auger rig is reaming the hole to accommodate a thirty six inch pipe to stabilize the surface after the hole has fallen in several times. |
1935983208 | 2015-04-23 | Drill / Deepen / Reopen | No Violations | Status check inspection on the current drilling process found Patterson Drilling rig 332 on location drilling the 12.250 section at a depth of 6,224 with a directional azimuth of 72 degrees at a 13 degree inclination. The tri cone drill bit and bottom hole assembly is currently stuck in the hole 15 off bottom, Blue Dot pipe recover service is currently on location and has shot off the drill string at 5,321 and will be attempting to jar the string free, with a wash over string enroot. |
For data sources see[10]