If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24811 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.704003653,"lon":-81.03191157,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Green Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001524 | |
Farm/Lease Name: ROTH B | |
License Status: Well Drilled | |
License Date: 2017-12-18 | |
Spud Date: 2018-06-07 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2018-07-08 | |
Well Total Depth: 30493 ft | |
Configuration: Horizontal | |
Latitude: 39.704003653 | |
Longitude: -81.03191157 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-12-18 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:12/18/2017, Expired Date:12/18/2019 12:00:00 PM, Drilling unit acres:484.412, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-07-08 | |
Record Last Modified | 2018-09-06 | |
Correction to Well | 2018-09-14 | TAKE/TARGET AS-DRILLED |
Construction Permit Expires | 2019-12-18 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0196224710 | 2018-07-09 | Drill / Deepen / Reopen | No Violations | |
1062558339 | 2019-02-27 | Completion Testing | No Violations | Status check inspection found Stingray Pressure pumping Service on location and stimulating 3 of the 5 wells on the pad. The said well has had 73 out of 98 stages completed. Nine Energy wireline is providing the perforating services. The well head completion stack is a FMC. The well head A&B sections have annular pressure monitoring in place and flow lines attached o the B section that are tied into a separate choke manifold. The flow lines are equipped with a 1,500 psi pop off with (2) in line shut off valves between the well head and pop off. Only the well being stimulated has the B section valves open to the check manifold during stimulation of that well. All stimulation equipment is situated on polymer containment and the well pad is equipped with a perimeter earthen berm with the perimeter berm drain valves being in the closed position. |
1287924987 | 2018-06-12 | Drill / Deepen / Reopen | No Violations | |
1529420560 | 2018-06-19 | Drill / Deepen / Reopen | No Violations |
For data sources see[3]