If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-25410 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.872088,"lon":-80.003565,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Cumberland Township | |
Operator Name: GREYLOCK PROD LLC | |
Well Pad ID: 148379 | |
Farm/Lease Name: FULLER 3MH | |
License Status: Active | |
Spud Date: 2010-03-15 | |
Permit Date: 2010-02-16 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 39.872088 | |
Longitude: -80.003565 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ENERGY CORP OF AMER | 219,251.00 | 102 | 0.00 | 0 | 0.00 | 0 |
2011 | ENERGY CORP OF AMER | 416,572.00 | 277 | 0.00 | 0 | 0.00 | 0 |
2012 | ENERGY CORP OF AMER | 318,597.00 | 321 | 0.00 | 0 | 0.00 | 0 |
2013 | ENERGY CORP OF AMER | 259,632.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | ENERGY CORP OF AMER | 204,833.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2015 | ENERGY CORP OF AMER | 160,739.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2016 | ENERGY CORP OF AMER | 131,130.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2017 | ENERGY CORP OF AMER | 129,930.00 | 308 | 0.00 | 0 | 0.00 | 0 |
2018 | ENERGY CORP OF AMER | 118,352.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2019 | GREYLOCK PROD LLC | 30,372.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2010-S02 | Produced Fluid (in Barrels) | 4,535.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S01 | Produced Fluid (in Barrels) | 4,023.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S01 | Produced Fluid (in Barrels) | 180.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2011-S02 | Drill Cuttings (in Tons) | 193.01 Tons | LANDFILL | 100172 |
2011-S02 | Fracturing Fluid Waste (in Tons) | 211.63 Tons | LANDFILL | 100172 |
2011-S02 | Fracturing Fluid Waste (in Tons) | 98.94 Tons | LANDFILL | SWF 1032-WV0109 |
2011-S02 | Produced Fluid (in Barrels) | 922.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S01 | Produced Fluid (in Barrels) | 100.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S02 | Produced Fluid (in Barrels) | 336.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S01 | Produced Fluid (in Barrels) | 555.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Produced Fluid (in Barrels) | 120.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S01 | Produced Fluid (in Barrels) | 575.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S02 | Produced Fluid (in Barrels) | 207.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S01 | Produced Fluid (in Barrels) | 70.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Produced Fluid (in Barrels) | 79.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015-S02 | Produced Fluid (in Barrels) | 29.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015-S02 | Produced Fluid (in Barrels) | 138.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 10.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 91.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 55.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 43.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 65.00 Bbl | REUSE (AT WELL PAD) | |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 65.00 Bbl | REUSE (AT WELL PAD) | |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 65.00 Bbl | REUSE (AT WELL PAD) | |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | REUSE (AT WELL PAD) | |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 44.00 Bbl | REUSE (AT WELL PAD) | |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 75.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019-M01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 8.50 Bbl | REUSE (AT WELL PAD) | |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 101.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 63.00 Bbl | REUSE (AT WELL PAD) | |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 53.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1894786 | Primary Facility | 2010-06-15 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
1895111 | Primary Facility | 2010-05-14 | Drilling/Alteration | No Violations Noted | HP 284 IS NIPPLING UP TO 9 5/8 ECA HAS PLASTIC UNDERNEATH EVERYTHING AND A CLOSED LOOP SYSTEM. THIS SITE IS CLEAN |
2372419 | Primary Facility | 2015-05-06 | Site Restoration | No Violations Noted | |
2561624 | Primary Facility | 2017-02-01 | Routine/Complete Inspection | No Violations Noted |
On 02/01/17 at approximately 1030 hours I conducted a site restoration inspection of the Fuller A pad in response to an NOT submittal by Energy Corporation of America. The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and no signs of erosion were observed. The site meets the requirements for permit termination. The NOT is approved. |
For data sources see[6]